4 March 9, 1988
' Docket'Nos. 50-348/364 321/366 50-424/425 LICENSES:
Alabar,a Power Company and Georgia. Power Company 1
UTILITIES:
Farley Nuclear Plant, linits 1 and 2 Hatch Nuclear Plant, Units 1 and 2 i
Vogtle Nuclear Plant, Units 1 and 2 l
SUBJECT:
SUMMARY
OF MEETING HELD ON MARCH 2, 1988 IN ROCKVILLE, MARYLAND BETWEEN NRC AND REPRESENTATIVES OF ALABAMA POWER COMPANY AND GEORGIA POWER COMPANY TO DISCUSS FORMATION OF A SEPARATE OPERATING ORGANIZATION.
Discussion The meeting was requested by Mr. R. P. Mcdonald, Senior Vice President, APC0, to discuss considerations for formation of a separate operating orga'11zation to operate the APC0 and GPC nuclear plants and to complete licensing proceedings for Vogtle Unit 2.
A list of meeting attendees is enclosed.
After introductions of persons in attendance, Mr. Mcdonald led the discussion regarding formation of the Southern Nuclear Operating Company (SONOPC0).
Mr. L. Long of Southern Company Services continued the discussion of the licensing considerations involved. A copy of the viewgraphs used during the discussion is enclosed.
Sumary The NRC staff indicated that it was willing to support the effort. Additional meetings will be required between the NRC staff and utility representatives to discuss detai s of the proposal to form the new operating company. Contacts l
for this effort will be G. Lainas for the NRC (301-492-1453) and Louis B. Long for the licensees (205-868-5403)
Original signed by:
Original sighed by:
Edward A. Reeves, Sr. Project Manager Lawrence P. Crocker, Sr. Pro.iect Manager Project Directorate 11-1, DRPR:NRP, Project Directorate 11-3, DRPR:NRR Original signed by:
eso32 g g eg g g Jon B. Hopkins, Project Manager
%DR PDR Project Directorate 11-3
Enclosure:
DISTRIBUTION:
As stated See attached list cc w/encls:
See next page
+SEE PREVIOUS PAGE FOR CONCURRENCE PM:PDII-1*
D:PDII-1*
PM:PDII-3*
PM:PDII-3*
Acting PD:II-3*
EReeves:pw EAdensan LCrocker JHopkins KJabbour 03/09/88 03/09/88 03/09/88 03/09/88 03/09/88 ADR2:NRR*
D*
RR*
P:
D: 1R.
Glainas S
F aglia TM ey 03/09/88 8
0
/88 03
/88
Mr. R. P. Mcdonald Alabama Power' Company Joseph M. Farley Nuclear Plant cc:
Mr. Bill M. Guthrie D. Biard MacGuineas, Esquire Executive Vice President Volpe, Boskey and Lyons Alabama Power Company 918 16th Street, N.W.
Post Office Box 2641 Washington, DC 20006 Birmingham, Alabama 35291-0400 Charles R. Lowman Mr. Louis B. Long, General Manager Alabama Electric Corporation Southern Company Services, Inc.
Post Office Box 550 Post Office Box 2625 Andalusia, Alabama 36420 Birmingham, Alabama 35202 Chairman Regional Administrator, Region II Houston County Commission U.S. Nuclear Regulatory Commission Dothan, Alabama 36301 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Ernest L. Blake, Jr., Esquire Shaw, Pittman, Potts and Trowbridge Claude Earl Fox, M.D.
2300 N Street, N.W.
State Health Officer Washington, DC 20037 State Department of_Public Health State Office Building Montgomery, Alabama 36130 Robert A. Buettner, Esquire Balch, Bingham, Baker, Hawthorne, Mr. J. D. Woodard Williams and Ward General Manager - Nuclear Plant Post Office Box 306 Post Office Box 470 Birmingham, Alabama 35201 Ashford, Alabama 36312 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 24 - Route 2 Columbia, Alabama 36319
Mr. George F. Head Edwin I. Hatch Nuclear Plant, Georgia Power Company Units Nos. 1 and 2 cc:
G. F. Trowbridge, Esq.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.
Washington, D.C.
20037 Mr. L. T. Gucwa-Engineering Department Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 Nuclear Safety and Compliance Manager Edwin I. Hatch Nuclear Plant Georgia Power Company P. O. Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc.
P. O. Box 2625 Birmingham, Alabama 35202 Resident Inspector U.S. Nuclear Regulatory Commission Route 1, Box 725 Baxley, Georgia 31513 Regional Administrator, Region II U.S. Nuclear Regulatory Connission 101 Marietta Street, Suite 2900 Atlanta, Georiga 30323 Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street S.W.
Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Commissioner Department of Natural Resources 270 Washington Street, N.W.
Atlanta, Georgia 30334 Chairman Appling County Commissioners County Courthouse Baxley, Georgia 31513
~
4 Mr. George F. Head Georgia Power Company Vogtle Electric Generating Plant cc:
Mr. L. T. Gucwa Resident Inspector Manager of Safety and Licensing Nuclear Regulatory Comission Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Executive Consultant Office of the Consumers' Utility Southern Company Services, Inc.
Council P. O. Box 2625 Suite 225 Birmingham, Alabama 35202 32 Peachtree Street, N.E.
Atlanta, Georgia 30302 James E. Joiner Mr. Paul D. Rice Troutman, Sanders, Lockerman, Vice President & Project Director
& Ashmore Georgia Power Company 1400 Candler Building Post Office Box 282 127 Peachtree Street, N.E.
Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Danny Feig Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services Inc.
P.O. Box 2625 Carol Stangler Birmingham, Alabama 35202 Georgians Against Nuclear Energy 425 Euclid Terrace Ernest L. Blake, Jr.
Atlanta, Georgia 30307 Bruce W. Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.
Washington, D. C.
20037 Mr. G. Bockhold, Jr.
General Manager Nuclear Operations Georgia Power Company P. O. Box 1600 Waynesboro, Georgia 30830 Regional Administrator, Region II U.S. Nuclear Regulatory Comission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323
D_ISTRIBUTION FOR MEETING
SUMMARY
DATED:
Facility:
Farley Nuclear Plant, Units 1 and 2*
Hatch Nuclear Plant, Units 1 and 2*
Yogtle Nuclear Plant, Units 1 and 2*
DockettFilei" HRC PDR Local PDR PDII-3 Reading TEMurley FJMiraglia SAVarga GClainas KNJabbour JBHopkins LPCrocker EGAdensam EAReeves PDAnderson PDII-1 Reading MKRood OGC ELJordan JGPartlow ACRS(10)
- Copies sent to persons of facility service list l
l l
1
u I
ENCLSOURE 1 LIST OF ATTENDEES MARCH 2, 1988 NAME ORGANIZATION R. P. Mcdonald APCo l
L. Gucwa GPC L. Long SCS N. Reynolds SCS R. Edwards GPC R. Buittner APCo
(
T. M. Murley NRR G. C. Lainas NRR S. A. Varga NRR J. Scinto OGC E. G. Adensam NRR 1
E. A. Reeves NRR J. B. Hopkins NRR L. P. Crocker NRR i
l l
l I
l l
t
e ENCLOSURE 2 Sn mm__
- JERA~~::\\ 3
- v 3ANY l
l l
1 l
l l
=w...
m.
._4.-
.mc.-..
=
s
.--- +
.-- - w -
i SOUTHERN NUCLEAR OPERATING COMPANY (SONOPCO) OVER\\/IEW 4
Phase 11 Task Force O
Southern Company Subsidiary to Operate Hatch, Farley and Vogtle 99 Hatch, Farley, Vogtle Unit 1 Operating 69 Vogtle Unit 2 -
Load Fuel, March 1989 9
Owners - Retain Assets and Power Output
Operating -
APCO Agreement (Plant Farley)
~
O erating GPC/OPC/MEAG/DAL P
SONOPCO C
Agreement (Plant Hatch)
Operating _
GPC/OPC/MEAG/DAL Agreement" (Plant Vogtle)
PR \\ C
)A_ BENEF TS i
l Higher Levels of Performance by Pooling Expertise i
O Retention and Recruitment of New Employees 1
Economies Through Consolidation 3
Enhanced influence in Industry Matters e
Strategically Positioned for Future L
4 ORGAN ZA~ ON 1
_e = w gw h _
semy e-e,.wm 4 m*-m,=.-=e
-- eM we ' m e se drew w.ma we. w-4 8
Onsite Organizational Structure Unchanged 8
Offsite Organizations Merged GPC APC
- 6 SCS Specialized Nuclear Services e
Project Concept Clear Lines of Authority l
Focused Goals Ease of Project Assimilation Competitive Environment
Nuclear Operating Company Board of Directors President Technical Nuclear Administrative Services Operations Services Department Department Department Farley Hatch Vogtle Project Project Project Farley Hatch Vogtle Plant Plant Plant
Project Organization Project Executive Project Project Corporate Support Quality Assurance Project Project Proj.ect Engineering Maintenance Administrat.ive
& Licensing
& Outage Support Support Support
==-
.=.e On Site Project Site Plant Quality Assurance
t V EET NO PURPOSE Confirm that NRC Management and Policies can support the proposed SONOPCo Licensing Approach in these areas:
1.
Coordinated Review of all Applications 2.
"Sholly" Procedure for all Applications 3.
Early Establishment of Probable Review Completion Date I
L CE\\S \\G
. - - - -----...e.
,, _ _. ~
-+--s-.
t UN QUE
_ CENS NG CONS JERA~~ ONS i
l 3
9 Five Operating Licenses (Hotch, Farley, Vogtle-1) i One Construction Permit (Vogtle-2) 1 l
9 Two Operating Companies (GPC, APC)
Three Sites 1
O Four Southern Licensing Contacts e
Three NRC Project Managers l
4
- w
- ~, --__ -.- _
=-g+m--w w-,---s----
-.-e-w- ------w--
- - +-w
-=*----.--_,.
SO. 0 3CO
_ CEN S \\!G A? 3 ROAC-
\\
e Simultaneous Filing of License Amendment Applications Plant Operator License Owner se Hatch, Units 1 & 2 GPC OL GPC, MEAG, Dalton se Farley, Units 1 & 2 APC OL APC se Vogtle, Unit 1 GPC OL GPC, MEAG, Dalton se Vogtle, Unit 2 GPC CP GPC, MEAG, Dafton
- Applications Essentially Some i
e Applications Complete i
i l
l
0
.\\ RC REVEW
_. _ _ _ _ _ _ ~. _.
Integrated Review of all Applications "Sholly" Process for all Applications
- 6 Complete "NSHC" Determination
- 8 Simultaneously Publish Notices of Proposed Action with "NSHC" Determinations e#
Simultaneously Publish Notices of issuance to be immediately Effective Early Establishment of Probable Review l
Completion Date i
SONOPCO PROJECT COORDINATOR x
1 FARLEY HATCH VOGTLE PROJECT PROJECT PROJECT MANAGER MANAGER MANAGERS TECHNICAL BRANCHES
,