Summary of 870522 Meeting W/Util Re Status of Licensing Actions for Facilities.List of Attendees & Licensee Slides Encl
ML20214V538
Person / Time
Site: Hatch, Vogtle, 05000000
Issue date: 06/05/1987
From: Crocker L, Mark Miller
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8706120144
Download: ML20214V538 (15)


Text

1s

[gureoq'o UNITED STATES g

g NUCLEAR REGULATORY COMMISSION y

3 3

E WASHINGTON, D. C. 20555

/

JUN 0 5 1987 Docket Nos.: 50-424 50-321 50-366 APPLICANT: Georgia Power Company FACILITY:

Vogtle Unit 1 and Hatch Units 1 and 2

SUBJECT:

SUMMARY

OF MEETING HELD MAY 22, 1987, TO DISCUSS STATUS OF V0GTLE AND HATCH LICENSING ACTIONS On May 22, 1987, the staff met.with Georgia Power Company representatives in Bethesda to discuss the status of licensing actions for both Hatch units and Vogtle Unit 1.

Participants are listed in Enclosure 1.

In opening comments, the licensee stated its interest in reducing the backlog of Technical Specification (TS) and other items and indicated that Hatch is the lead plant for the BWR Owners Group TS Improvement Program. The licensee also stated its belief that Hatch operation has improved since Mr. Tom Beckham

)

has been the senior official at the Hatch site.

)

The Hatch units were discussed first. The licensee's slides are provided in.

The licensee stated that Unit 1 is 31 days into a 58 day outage and that restart is on schedule. The licensee needs the standby liquid control TS amendment by May 28 and the TS change concerning hydro testing by June 3 in order to support restart.

The licensee stated that Hatch Unit 2 is currently at 90% power and maintenance personnel are on shift around the clock which helps the unit get out of TS limiting conditions of operation. Anticipated outage related changes include approximately 38 design changes of which only one, on a preliminary basis, requires TS changes.

The licensee's top priorities of the outstanding submittals for Hatch are listed ir.

Freicsure 3.

The staff indicateo that it wculd etterpt close out as many of tFr licensee's priority items as possible.

The licensee's slides for its Vogtle discussion are included in Enclosure 4 The startup program is scheduled for completion on June 3,1987, with testing at the 90% and 100% power plateaus remaining. The licensee stated that upcoming TS revisions will be submitted between mid-June and July.

l 8706120144 870605 i

PDR ADOCK 05000321 P

PDR l

~

JIN 05 MI

_g_

In closing, the licensee expressed its concern regarding the Comission's recent rule regarding fingerprinting of all personnel with access to safeguards information. The licensee explained that there may be 150 electricians with access to vital areas creating a hardship because of the high degree of turnover and the substantial amount of time required to receive fingerprinting results.

. \\ S\\

Melanie A. Miller, Project Manager Project Directorate II-3 Division of Reactor Project I/II

'] \\

Lawrence P. Crocker, Project Manager Project Directorate II-3 Division of Reactor Projects I/II

Enclosures:

As stated cc w/ encl See next page DISTRIBUTION:

I See next page e

P hhRRI/II PDII-3/DRPI/II PD PI/II MM Mr7 rad LCrocker BJY b ood 06

/87 06/9/87 06/t. - 7

- o Mr. James P. O'Reilly Edwin I. Hatch Nuclear Plant, Georgia Power Company Units Nos. I and 2 cc:

G. F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, D.C.

20036 s_

Mr. L. T. Gucwa Engineering Department Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 Mr. H. C. Nix, Jr., General Manager Edwin I. Hatch Nuclear Plant Georgia Power Company P. O. Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc.

P. O. Box 2625 Birmingham, Alabama 35202 Resident Inspector U.S. Nuclear Regulatory Comission Route 1, P. O. Box 279 Baxley, Georgia 31513 Regional Administrator, Region II 4

U.S. Nuclear Regulatory Comission, 101 Marietta Street, Suite 3100 Atlanta, Georiga 30303 Mr. Charles H. Badger Office of Planning and Budget Room 610 4

270 Washington Street, S.W.

Atlanta, Georgia -30334 Mr. J. Leonard Ledbetter, Comissioner Department of Natural Resources 270 Washington Street, N.W.

Atlanta, Georgia 30334 Chainnan Appling County Comissioners County Courthouse Baxley, Georgia 31513

Mr. J. P. O'Reilly Georgia Power Company Vogtle Electric Generating Plant cc:

Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Comission Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 i

Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing-Office of the Consumers' Utility Vogtle Project Council Georgia Power Company /

Suite 225 Southern Company Services, Inc.

32 Peachtree Street, N.W.

P.O. Box 2625 Atlanta, Georgia 30303 Bimingham, Alabama 35202 James E. Joiner Mr. Paul D. Rice Troutman, Sanders, Lockeman, Vice President & Project General Manager

& Ashmore Georgia Power Company Candler Building i

Post Office Box 299A, Route 2 127 Peachtree Street, N.E.

Waynesborn, Georgia 30830 Atlanta, Georgia 30303 Danny Feig Mr. J. A.' Bailey 1130 Alta Avenue i

Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc.

P.O. Box 2625 Carol Stangler j

Bimingham, Alabara 35202 Georgians Against Nuclear Energy 425 Euclid Terrace Ernest L. Blake, Jr.

Atlanta, Georgia 30307 L

Bruce.W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.

Washington, D. C.

20037 Mr. G. Bockhold, Jr.

Vogtle Plant Manager Georgia Power Company Route 2, Box 299-A Waynesboro, Georgia 30830 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. R. E. Conway i

Senior Vice President and Project Director Georgia Power Company Rt. 2,'P. O. Box 299A Waynesboro, Georgia 30830

Participants NRC Georgia Power Company S. Varga*

L. Gucwa G. Lainas*

W. Burns B.J. Youngblood*

R. Baker M. Miller J. Heidt L. Crocker S. Tipps M. Sinkule J. D' Anico F. Cantrell

  • Did not attend entire meeting 1

l

\\

t i

l l

ENCLOSURE 2-

~ :

-A~C-2

' 988 RE E_ \\G 0 AGE AC~ V ~ ES REQ R \\G

\\ RC AC~ 0s FUEL RELATED CHANGES

  • ANF Lead Test Assemblies
  • Revised Appendix K Methodology (SAFER /GESTR)

REGULATORY MANDATED CHANGES

OTHER PLANT CHANGES (Preliminary) 1

  • Drywell Chiller Unit

-y c

a

- A C-2

' 988 Er. E

_ \\ G 0.~AG E SE_EC E)

_ CE\\S NG V0)

CA~ 0NS

  • Appendix R circuit breakers, fuses, transfer switch
  • ATWS/NUREG-0737, Supp.1 - ADS bypass tirner rnanual inhibit switch
  • IEB 84 HFA relays l
  • NUREG-0737, Supp.1, Generic Letter 84 Insulate water level indicotor reference legs

- A C-2

' 988 E E_ NG Of AGE

.S S / S~ AC V ~ ES SELECTED INSPECTIONS

  • Feedwater piping inspection (Tentative) e Mark l Containment (Tentative)

REPORTS

  • NIS-1 Report NOTE:

No ILRT, NUREG-0619, or NUREG-0313, Rev. 2 (draft) inspections this outage 1

1 i

s i

1

)

NUCLEAR FUEL CYCLES 1

^""" "

PLAN OF RECORD 1

1987 1988 1989 1990 1991 1 I LLLLLLLLL}_Ll_LLLLLLLLL}_LLLLLLLI LLLl_L11 I LLLLLLLl_LLLLLLLLLLI.

3 (06/18)

(11/20) !

(06/03)

(*1/03) 0

(

I 1

I I

)

(04/22) j (09/23) f f

(04/06) f (09/06) j l(o2/2s)

(06/04)

(to/2a) :

hf{fd HATCH 2

7 3

g l

l 5h v

(os/os)*

(04/g1)'

(os/st) i l

(o3/09)

(1o/30)

(03/26)

(1o/o6)

N l

1 (09/02)

! (01/26)

(os/o9) l l

j j (03/01) j (io/os) j VOGTLE 2

g i

l i

coa /o4)

I

-- ii.-Z.RTo~TsJie~/a7 1

\\

xq

?

-ENCLOSURE 3

[

OUTSTANDING SUBMITTALS LIST i

k l

01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL; SPECIFICATIONS SHIFT OVERTIME REQUIREMENTS'

)4 09/09/86 321,366 CHANGE TO TECHNICAL-SPECIFICATIONS - RIVER LEVEL l

03/20/87 366 CHANGES TO TECHNICAL SPECIFICATIONS HYDROGEN WATER CHEMISTRY f

05/01/87 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS ~

GASEOUS EFFLUENT RELEASE POINTS 08/25/86 321,366 CHANGE TO RWCU LEAKAGE DETECTION TECHNICAL SPECIFICATIONS - HIGH TEMPERATURE ISOLATION J

05/08/87 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS TURBINE VALVE TESTING

\\

01/10/85 366 REQUEST TO RESCIND CONFIRMATORY ORDER ON REACTOR COOLANT SYSTEM STAINLESS STEEL PIPE 1

1 l

02/26/86 321,366 PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION PERMIT i

l 03/27/87 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS CORE SPRAY DELTA P

(BREAK DETECTION) t i

INSTRUMENTATION-SEISMIC

)

05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION SPECTRA BROADENING i

l l

I

)

i j

i f

I

ENCLOSURE 4 3 As-~ V0G-~

E 2 SC SS 0 4

~~0 3 CS 1.

STARTUP TEST PROGRAM l

2.

UPCOMING' TECHNICAL SPECIFICATION REVISIONS 1

3.

1988 REFUELING OUTAGE

.o 4.

FILTER BACKWASH COLLECTION TANK EVENT

PLANT V0GTLE

- UNIT 1 STARTUP PROGRAM STATUS TENATIVE SCHEDULE o ESTIMATED ELEVEN DAYS TO PROGRAM COMPLETION o PROJECTED PROGRAM COMPLETION DATE - JUNE 3,1987 REMAINING TESTING o 90 % POWER

- CALORIMETRIC

- MISCELLANEOUS TESTING o

100 % POWER

- CALORIMETRIC

- 100 HOUR WARRANTY RUN

- 10 % LOAD SWlNG

- 50% LOAD REDUCTION

- FULL POWER TRIP

- NATURAL CIRCULATION DEMONSTRATION

- MISCELLANEOUS TESTING

__-.__y

1 PLANT V0GTLE

- UNIT 1 UPCOMING TECHNICAL SPECIFICATION REVISIONS THERE ARE CURRENTLY FOUR TECHNICAL SPECIFICATIONS WHICH REQUIRE REVISION TO CLARIFY AMBIGUITY. THESE ARE:

o T.S. TABLE 3.3-2 ACTION ITEM 26 FUEL HANDUNG BUILDING POST ACCIDENT ACTUATION INSTRUWENTATION o T.S. TABLE 4.11-2 ITEM 2 CONTAINWENT PURGE SAWPUNG AND ANALYSIS 1

o T.S. TABLE 3.3-2 ITEM 10d AND T.S. 3.3.3.7 CONTROL R00W YENTILIATION ISOLATION INSTRUWENTATION o T.S. TABLE 3.3-2 ITEM 7 AND T.S. 3/4 5.2 & 5.3 SEWl-AUTOWATIC SWITCHOVER TO CONTAINWENT EWERGENCY SUWP

~

3 A s" V0G" _ E -Js"'

' 988 Er. E s G 0."AG E

)

TENATIVE SCHEDULE o

OUTAGE START DATE - SEPTEMBER 2,1988 o

OUTAGE COMPLETION DATE - OCTOBER 30,1988 o

FIRST FORMAL OUTAGE PLANNING MEETING - JUNE 10,1987 1

SELECTED ACTIVITIES TENATIVELY SCHEDULED o

ATWS MITIGATION SYSTEMS o

ALTERNATE "RADWASTE" FACILITY VENTILuTION EXHAUST HEPA FILTERS o

DIESEL GENERATOR FUEL OIL TANKS MODIFICATIONS o

ROUTINE SURVEILMNCES l

o PREVENTATIVE MAINTENANCE ITEMS

,,_,,,-,,,--------.----,-,-,,--,--,--~,,----..--r,--

, - - ' - - - ~, - -, - - - - - - - - - - - - - - - - - - - - - - ~ ~ - - ' - - - - - - - - - - ' '

gNN MEETING

SUMMARY

DISTRIBUTION

n,,.

M 05 M,

siDocksfFilih NRC Participants NRC PDR~~

5. Varga L PDR G. Lainas NSIC B.J. Youngblood PRC System M. Miller PD#11-3 Rdg L. Crocker M. Duncan M. Sinkule B. Kolostyak F. Cantrell W. Troskoski (MNBB 6113)

OGC-Bethesda ACRS (10)

OTHERS bec:

Licensee & Service List

..