'Ma, r-r VEGP PLANT' REVIEW BOARD MEETING MINUTES MEETING NO.
90-60 DATE 4/19/90 PAGE 1
0F 3
l rwETING CONVENED 1:25 AM/PM; MEETING ADJOURNED 2:45 AM/PM j
( 6 VIA TELECON) i i
THIS MEETING CHAIRED BY:
l Ix) CHAIRMAN
( ) VICE CHAIRMAN W. F. Kitchens VOTING MEMBERS PRESENT:
H. M. Handfinger J. E. Swartzwalder i
J. G. Aufdenkampe A. L. Mosbaugh
- l PRB SECRETARY C. Cross Tynan 1
NON-VOTING MEMBERS PRESENT: M. B. Lackey G. R. Frederick l
C. P. Stinespring l
1 l
VOTING ALTERNATES PRESENT:
i l
I. A. Kochery FOR R. L. LeGrand FOR NON-VOTING TITERNATES PRESENT:
.i FOR I
FOR FOR l
FOR l
FOR GUESTS / TECHNICAL ADVISORS:
PRB ACTION ITEMS OPENED: NONE PRB ACTION ITEMS CLOSED: NONE PRB MINUTES APPROVED
- 90-57, 90-58, 90-59 k.c
[,T Mf &
PRB SECRETARY PRB CHAIRPJ04 9610040175 960827 (FORM NAME=PRBAGEND)
, ~ ~ ~. -
-n
.. - - -.. ~ -.
- -... - -. -.. ~.... - -...
- y:*#,,~.
. J J.A*,Pt e,'s ~~, *.4
- 4........ ; ; -
s,dPL*
}' i; r.
l
- ' g
,4 j
PRB 90 60 Page 2 of 3 PRB MEETING MINUTES CONTINUATION SHEET 4
A.
Meeting Minutes 90-57, 90-58 and 90-59 were unanimously approved as presented.
B.
The following items were unanimously acommended for approval. No unreviewed safety question involved.
f TCP 12001-C-17-90-1,
" Unit Heatup to Hot Shutdown" TCP 12002-C-15-90-1,
" Unit Heatup to Normal Operating Temperature and Pressure" TCP 12006-C-15-90-1,
" Unit Cooldown to Cold Shutdown" i
Fire Report 90-01 Fire Report 90-02 i
,C.
The following items were unanimously recommended for approval with comment.
No unreviewed safety question involved.
00254-C, Rev. 9,
" Plant housekeeping / Material Condition Program".
Page 8 - The foreman or supervisor i
responsible for the work activity will ensure... (not the Shift Superintendent).
00409-C, Rev. 7, "Open Item / Commitment Tracking". Section 4~1.6.2 - Define MTS.
D.
LER 1-90-006. " Loss of Offsite Power Leads to Site Area Emergency", was returned to PRB with Corporate comments. The board recommended approval of the LER.
The vote was 4:0. No unreviewed safety question involved.
H9111 A. L. Mosbaugh abstained from the vote, due to insufficient review time.
E.
The board unanimously concurred with the reportability determination for the following Deficiency Cards.
1-90-0098 2-90 0035 1-90-0190 2-90-0036 1-90-0195 2-90-0037 1-90-0201 1-90-0203 1-90-0204 1-90-0209 1-90-0208 F.
The board tabled the Annual 10 CFR 50.59 (b) Report. Additional review time needed.
T...:.~.~. 7.:;. '
-:., > 2 $
M? X'SW:W4%7?:4 % W X7h%?lty M 5i?M..=":'~"*
W *'
- w PRB 90-60 Page 3 of 3 G.
The following items were tabled until a future meeting.
ISI-P-008, Rev. 5, Transmittal Letter ISI-P-016, Rev. 2, Transmittal Letter IS1-P-006, Rev. 4, Transmittal Letter l
i.ER2-90-003,
" Trip of Heater Drain Pump Results in i
Exceeding The Reactor Power License Limit" 00001-C, Rev. 5,
" Plant Organization; Managerial Staff j
Responsibilities and Authority" H.
The board discussed the proposed revision to the Software Controls program.
The level of quality assurance for various software onsite was an issue with differing opinions by the board members. The procedure will be submitted to the board at a future meeting.
Meeting Adjourned e
6
VEGP PLAb. h }. '.
u.
.)/.la. D M E E T 12i G MINUTES
.,i.G NO.
N T, ATE M PAGE 1
OF 2
.~
CONVENED 9:15
- .f r+. ".rCTING AD.TOUPNEO 10:00 AM/PM
- VIA TELECON)
.3 MEETING CHAIRED BY:
Cl!.A1HMAN (X) VICE CHAIRMAN VOTING MEMBERS PRESENT:
J. C Au fd. r. '< W e
.7.
E.
Swartzwelder H. Handfinger M.
W.
Horton PRB SECRETARY W.
C. Gabbard
......m.m...=._m____.
NON-VOTING MEMBERS PRESENT:
G.
R.
Tcoderick
=
....,......_:..m.
VOTING ALTERNATES PRESENT:
I. A. Kochery FOR R.
L.
Lt. Grand FOR w.
a=
.u,.=..e..,,n-.----.=.=.,:.=
F
'ING ALTERNATES PRESENT:
FCR F0h
~....
3 FOR YOR FOR GUESTS / TECHNICAL ADVISORS:
W.
K. Smith T. E. Webb i
T. ". Greene ft...... ?:.- - - -
.4,*;g;;;:.
.;;. ;,/4.,
..w... & -
PRD ACTION ITEMS OPENE 90-66-01 PRB ACTION ITF
CLOS!
None PRB MINUTT.:S "OVED None
~
- =.. -
/
i PRB STCFETARY
'B CHAIRMAN
.. r.
a, w..
NE '.
~'-" T INS PECTOR (FOP.M NAME=-PRBAGENDJ
I PRB 90-66 Page 2 of 2 i
PRD MEETING.MIEl' G': CC STINUATION GITEET l
A.
The following ita..
/r m t-
'y reecr.nended for approval with comne.
~c unr red safety question i
involved.
l l
LER 1-9 '.
.1 "IN.ws ; icactor Trip Due tc Inadvertant closure of Main Feed Regulating Valve",
Sections D & F (Cau.. and i
l Corrective Actions; Remove I
references to label;.3 and l
locking device.
t j
EQTE:
PRB Action Itei %- M-01 i ncueci 'o Trip Reduction Comnitv.ed to re-eval;.sb3 Trip Hazards and Single Point Trips (Ref. review of IIR 1-90-11).
Re port results to PRB.
le.ss, of Offsite Power Leads l
to Site Area Emergency".
^
1 Section D (cause of Event) l clarify wh;st Comprehensive Test Program means.
e
VEGP PLANT REY L'.9 be!RD MEETING MINUTES MEETING NO.
4 DATE N
PAGE 1
OF 3
.ETING CONVENED 1:20 AM/PM: MEETING ADJOURNED 2:05 AM/PM
(
- VIA TELECON)
THIS MEETING CHAIRED BY:
( ) CHAIRMAN (x) VICE CHAIRMAN VO"lING MEMBERS PRESENT:
J. G. Aurde, '..inpe.
M.
W.
Morton Handf'rher J. E.
Swartzwelder H. M.
PRS SECF.E.lhRY C.
Cross Tynan
-.,...-,..__._.._:r NON-VOTING MEMBERS PRESENT: M. B.
1.ackey E. M.
Dannomiller G. R. Frederick VOTIM AI.TERNATES PRESENT:
P. A.
Cure FOR R.
L. LeGrand FOR
_ NON-VOTING ALTERNATES PRESENT:
FOR FOR
. - =
FOR FOR FOR
- _ =..
...e GUESTS / TECHNICAL ADVISORS:
1 A. G. Rickman T. E. Webb
{
--. r.-e r. -..-
i
,B ACTION ITEMS OPENED: 90-67-01 PRB ACTION ITEMS CLOSED: NONE PRB MINUTES APPROVED
- 90-65
^
. r..c... _.._
.c,.--
l et d ' I.a > ---
@Y Mu U7 v
PRB SECRETAT.Y PRS CHAIRMAN i
i I
=.m. m.
CC: NRC RESIDENT ~NSPECTOR (FGRM Nif.E=PRBAGEND)
P2B 90-67 Paga 2 of 3 PRB MEETING MINUTES CONTINUATION 3HEET A.
Meeting Minutes 90-65 were unanimoesly approved as presented.
B.
The following items were unahWlj recommended for approval.
No unreviewed safety question involved.
19212-C, Rev. 2, "FR-S.2 Res;.onse to 1.oss of Core Shutdown" 19222-C, Rev. 5, "FR-C.? Pe pmc to Degraded Core Cooling" 3
19235-C, Rev. 4, "FR-H.5 :
nse to Steam Generator Low Level" 00057-C, Rev. 5,
" Event Irvntigation" 18007-C, Rev. 5, "Cherr.ica' and Velame Control System Malfunction" l
LDCR FS90-023, Revin FSAc Section 13.1.2.2.2 page 13.1.2-4 to edd Assistaat Gewal Manager - Plant Support to the line of succession of responsibility for plant operation.
Transmittal Letter - Emergency Plar ravision 12 (ELV-01591)
Transmittal Letter - Emergency M an Revisien 13 (ELV-01592)
LDCR SP 90-03, (SAFEG'JARDS;
^
00656-C, Rev. 1,
" Vehicle Cartrel" s
r The following items were unanin usly rectmended for approval with comment.
No unreviewed safety question involved.
00262-C, Rev. 8,
" Control of Chemicals / Fluids".
Section 2.1.2 Clarify and use exception listing.
Section 2.6 -
Include Demin. Water Building.
Section 4.5.2.2 Include writeLp / reference of HP signoff acceptano of contamiqated themicals.
Generic comment - Delett "I" from Nuclear Specialist title.
Include ensuri.rg MSDS en file prior to entering PA in Receipt o
inspection precedure - J. G. Aufdenkampe to take action.
00260-C, Rev. 6,
' Hazardous Substance and Waste Control".
Section 2.22
- Defir,1 tier, of critical areas should be modified to address this specific procedure.
Section 9.1 1 correct nhrence (8.9.1 should be 8.8.1).
~
General Manager needs to detere.::,u if ek:fication (Diesel t' arts)
LER l-90 06 should a'30 be ir.0 ec t. tte my 14, 1990 '
r or....
'n VS /ct :e T-67-01.
'esponse to the confirmation of f.:tio:.1 '
b
PRB 90o67 Page 3 of 3
^
1 D.
The board unanimously concurred w:*.h the reportability determination for the.
following Deficiency Cards.
j 1-90-0149 1-90-0242 1-90-0243 2-90-0046 2-90-0048 2-90-0049 Meeting Adjourned e
l l
i I
VEGP PLANT REVIEn 50ARD~ MEETING MINUTES MEETING NO.
M DATE M
PAGE 1
OF 2
.ETING CONVENED 2:50 AM/7h, MEETING ADJOURNED 4:05 AM/FM
(
- VIA TELECON)
THIS MEETING CHAIRED BY (x) CHAIRMAN
( ) VICE CHAIRMAN VOTING MEMBERS PRESENT:
J. E.
Swar; t'.'e '.de r R.
J.,.
I.eGrand PRB SECRETARY C.
Cross Tynan r--,....,,....:.
. = - - -
NON-VOTING MEMBERS PRESENT: K.
R.
Hol=ur E. M. Dannemiller M. B. Lackey C.
P.
Stines ng G. R. Frederick
. _... x :.=s VOTING ALTERNATES PRESENT:
C.
L. Coursey FOR H. M. Handfinger R. M. Odom FGR J.
G. Aufdenkampe r,-..:n NON-VOTING ALTERNATES PRET?NT:
FOR FOR FOR FOR FOR
~... n..., - - a a -...= -.--
GUESTS / TECHNICAL ADVISORS:
T. E. Webb
- 6. L. Mosbaugh J. C. Williams J. F. D'Amico
...: 4 *:.*tr M*ll*a.
-a m..
PRB ACTION ITEMS OPENED:
NONE PRB ACTION ITEMS C14 SED:
NONE PRB MINUTES APPROVED NONE
^
n a n n C. % ~
wn.w PRB SECR5TARY PRD CHAIRMAN CC: NRC RESIDENT INSPECTOR (FORM NAME=PRBAGEND)
. _ ~
PRB 90-68 Page 2 of 2 m
PRB MEETING NINUTES CONTINUATION $HEET A.
The following items were uranimanly reccmended for approval.
No unreviewed safety question involved.
90004-C, Rev. 13, (SArEG'JAnnS) 1990 Emergency Preparedness l ettar to NRC (EtV-01625)
B.
The following items were unaninataly recomended for approval with comment.
l No unreviewed safety question inv:lved.
~
90166-C, Rev. 4
" Implementation of the Security Training and Qualification Plan".
Review to ensure consistent use of either "SNS0" or NSS0".
92015-C, Rev. 6,
" Transient Combustibles Control".
Review to ensure Diesel Fuel truck off-loading will not be in conflict i
with this procedure, l.ER 1-90-3S,
" Apparent Personnel Error leads to Unsecured Safeguards Infomation".
In the Abstract, delete the following:
... following plant procedure by...".
In the Description of Event - revise to state the
^
items found in the cabinet were, "... outdated copy of Physica' Security Plan, s.ecurity drawings, Design Change Packages, Design lists and other miscellaneous safeguards documents".
In the Cause of Event - add, "The engineer was fully familiar with requirements for security safeguards documents and had recently viewed,
training of safeguards documents handling.".
In the Corrective Actions - Add in #2 that the items were
" inventoried, accounted for and returned...". Add in #4 that cabinets (except those under custody of Security and QA) have bean relocated to a central area in Document Control, n the second paragraph, page 1 - delet9 the word " direct" and insert. "... a cognitive personnel error com0i tiullet - revise to state that the Maintenance c.unded by...".
Delete the second sentence of this paragraph.
Page 2, cixt.
procedures for temperature switches "will be" revised.
Page 3 - delete the word " primary" (FL).
Page 4, fwrth bullet - insert the words, "A memo has been issued info. ming control commurb -tors...".
Page 5, second bullet - revise to state, "'.
'uation wil; be performed for system lineups and power source: nuring pl.
. for unit.">tages".
Meeting Adjourned n
VEGP PLANT 2E"II,W BOARD' MEETING MINUTES
..-::...,..~
'ETING NO.
g DATE M
PAGE 1
OF 4
,.n MEETING CONVENED 1:00 AM/PM;.T::'ETING ADJOURNED 3:10 AM/PM
(
- VIA TELECON)
THIS MEETING CHAIRED BY:
(X) CHAIRMAN
( ) VICE CHAIRMAN VOTING MEMBERS PRESENT:
T. V. Greenc M.
W.
Horton H. M. Handfinger*
PRB SECRETARY C.
Cross Tynan
--y-NON-VOTING MEMBERS PRESENT:
G.
R.
Frederick C.
P.
Stinespring M. B. Lackey E. M. Dannomiller*
i VOTING ALTERNATES PRESENT:
R. M. Odom FOR J. G. Aufdenkampe W. L. Burmeister FOR
.T.
E.
Swartzwolder
__._._.m..
IN-VOTING ALTERNATES PRESENT:
.r, I. A. Kochary FOR R. L. LeGrand FOR FOR FOR FOR GUESTS / TECHNICAL ADVISORS:
J. N. Roberts L. Russell T. E. Webb
. - _ ~ _.. _
u....
=- :._.:.
PRD ACTION ITEMS OPENED:
None PRB ACTION ITEMS CLOSED:
89-134-01 PRB MINUTES APPROVED 90-72, 90
- 73, 9 0- ? 4, 90-75
...__-.......s.m, 0 TW-. ^ w PRBSECREEARY PRB CHAIRFJLN CC: NRC RESIDENT INSPECTOR (fob NAME=PRBAGEND)
- Part-time attendance
PRB 90-76 Paga 2 cc 4 4
PRB MEETING MIrm _5 CC!MINUATION SHEETS A.
Meeting Minutes 90-73, 90-71 f.nd 90-75 were unanimously approved as presented.
i Meeting Minutes 90-72 weca stmrimously approved with comment to add the following to the 0 scunnf on on Dc/LER in Item G:
"An additional reason the LIA 9 m D vere tabled was to allow M. 3-Lackey time to invest!. cat e ar.d procure more information for substantiating that those.srtsas ist question were in fact included in Outage Area Superviser walkdewns".
B.
The following items worc c an.itously recommended for approval.
No unreviewed safety question involved.
90318-C, Rev. 3 (SAFEGUARDS) 91104-0, Rev. 8
" Duties of the OSC Manager" 91602-C, Rev. 7
" Emergency Drills and Exercises" TCP-18038-1-10-90-1
" Operation From Remote Shutdown Panels" s-~r TCP-18038-2-5-90 1
" Operation From Remote shutdown Panels" 18038-1, Rev. 11
" Operation From Remote Shutdown Panels" 18038-2, Rev. 6
" Operation From Remots Shutdown Panels" DCP 89-V1N0251, Rev. C To provide a means of sampling Steam Generators fol. lowing an Auxiliarv Feedwater start.
DCP 89-V2E0111, Rev. O To install floor drain in Auxiliary Building RA-99 91401-C, Rev. 6
" Assembly and Accountability" Egla:
This procedure was tabled at previous meeting.
4 To resolve the concerns from that meeting, J. N. Roberts reworded section 5.4.3.1 to allow ERO Managers to have option on sending individuals 1
'~'
for safety and Health Evaluations.
1 PRD 90-76 P;ga 3 of 4 c.
The following items wero cranimum,1y recommended for approval with comment.
No unrevieL es safoty question involved.
19020-C, Rev. 5 "E-2 Faulted Steam Generator Isolation" Attachment A, page 6 of 6 - Verify panel location for SG 1 "1ACQPCD" - should be
/
"1ACOPCP".
- Correctise ic'. ions for Site Area Emergency
).
Second para;!resh - change " calibration problems" to
(
" calibration techniques".
Letter to NRC - Request t: revice Technical Specification 4.8.1.1 (6) (c) Additional Infernation (ELV-01725).
Third
- paragra, reword as follows:
" Isolation valves will be positio.
per revised plant c.perating procedures.
These procedures will require indapericont verification signoff of valve position restoration".
D.
The board reviewed '
il Repcit 1-90-005, " Manual Reactor Trip Resulting From Main raod Eey. Sating Va3ve Closure", with the
~
following comment.
Verify CSCS signed original Trip Report (Page 19 of 29 of Event Report).
E.
The board reviewed and ccumrred with Record Correction Notices for the Security procedures noted below.
These RCN's were to 7-s document the correction u. ads to Section 6 of the Procedure Review Request Form, and to establish that PRB comments were resolved.
The resolution of the PRE comannts did not inpact commitment tracking or the safety evaluation review.
The affected procedures are as follows:
90001-C, Rev. 15 90166-C, Rev. 4 90004-C, Rev. 12 90205-C, Rev. 11 90005-C, Rev. 15 90313-C, Rev. 4 90011-C, Rev. 5 90318-C, Rev. 2 90015-C, Rev. 8 90320-C, Rev. 0 901G6-C Rev. 3 3
F.
The board unanimously cen";nrced with the report.'.ility determinatiors for the following Deficiency Cardt.
2-90-0051 1-90-254 2-90-0053 1-90-255 1-90-252 1-90-256 1-90-253 1-90-258 G.
The board tabled LDcR FS iO-07.4, to revise FSAR sections 1.9.75.2 and 8.3.1.4.6 to allow splices ir raceway when evaluated and approved by Engineering.
The cear.ent is that this is a reduction in QA program by allowing splices in raceway.
SONOPCO nneds to clarify what the intent of TSAR verding is.
l H.
The board tabled procebire 00(10-C, Rev.
5,
" Control of Computer Software".
Additional lar!fication needed en categories.
e
PRB 90-76 Paga 4 of 4 1.
The board unanime,esiy (
- t. 00 1 90-244, "Operatione proced2re 14210-1 not p : ' r: r ~ '. v : pc *.etratic nr. 5, 50, and 90 during 1F2", is not i ep; c'. -;.V.
This le based on information supplied by M.
B.
Lac}.e; m.i e t e -tia t h,g that t.hese areas werc includcd in out.ge A : ': M r r.',cor v.=.1kdowns.
Additionally LER 1-SC c;; 1.
vit! : wn from any further PEB review.
J.
PRD Action Jtem 89-124-C1 c i O *. e d.
O.
P.
Stinespring.itated that the training on t% g.11 wi an (spcc, Rev. 4? has been completed.
Meeting Adjourned j
l
VEGP PLANT Ri./!i.W bO/.hD MEETING MINUTES
'ETING NO.
6 DATE p
PAGE 1
OF 5
m t1EETING CONVENED 1:10 AM/PM M.CrING ADJOURNED 2:40 AM/PM
(
- VIA TELECON)
THIS MEETING CHAIRED BY:
( ) CHAIRMAN (X) VICE CHAIRMAN M i
VOTING MEMBERS PRESENT:
H. M. Hard.rirryr J.
G, Aufdenkatapo
=._
PRS SECRE N.Y C.
Cross Tynan
.~
NON-VOTING MEMBERS PRESENT:
G. R. Frederick C.
P. Stinespring J. L. Beasley VOTING ALTERNATES PRESENT:
J. P. Cash FOR
- 2. E. Swart 2 Welder R. L. Mansfield FOR M. W. Horton
..m.--..--
n m u=a, N-VOTING ALTERNATES PRESENT:
P. A. Cure FOR R. L. LeGrand FOR FOR FOR FOR GUESTS / TECHNICAL ADVISORS:
T. E. Webb G. S.
Lee
..m-m.-
PRB ACTION ITEMS OPENED:
None PRB ACTION ITEMS CLOSED:
P R D - 9 0 - 6 0,- C.1 PRB MINUTES APPROVED 90-76, X-,
- c.
0,
.0-79, r.0-so
~._.._.. _ -
. ~... u.. m - m..=.,e.
CC: NRC RESIDENT INSPECTOR (FORM NAME*-PRBAGEND)
PRB 90-81 PCg3 2 Of 5
^
PRD MEErJNC ling"'s E '.;F.TWJATION GREET l
A.
Meeting Minuter. 90
'f, 7,
E-7F, 90-79 and 90-80 were unanimously apprcved er prerented.
j 1
B.
The following items wm ' r.u.incunty re crended for approval.
No unrevi w t' nan.ty q.testion involved.
TCP 13202-1-5-90-1
" Gaseous Releases" TCP 18010*C-7-90-3
" Loss of Residual Heat Removal" TCP 18038-1-10-90-2
" Operation From Remote Shutdown Panels" TCP 18038-2-5-90-2
" Operation From Remote Shutdown Panels" TCP 19241-C-7-90-2 "FR-P.1 Response To Imminent Pressurized i
Thermal Shock condition" TCP 19232-C-3-90-2 "PR-H.2 Response to Steam Generator overpressure" 19232-C, Rev. 4 "FR-H.2 Response to Steam Generator Overpressure" TCP 83503-1-1-90-1
" Unit Operation During Secondary Plant Performance Test" 83503-1, Rev. 2
" Unit Operation During Secondary Plant Performance Test" Special Report 1-90-04
" Valid Diesel Generator Failure" (NOTS-00403)
DCP 90-V1N0015, Rev. O To eliminate the possibility of the ARV's stalling at some uncontrolled position after several strokes TER 90-004, Rev. O
" Turbine-Generator Torsional Test" (Results).
ISI-P-014, Rev.' 3 l
l
PRB 90-81 FCg3 3 of 5 r~~
LER 2-90-01, Rev. 1
" Misleading Task Sheet Imads to inadequate Technical Specification Surveillances".
C.
The following items wer: unar ir.:usly recommended for approval with comment.
N: unreviewed safety question involved.
i' i
93020-C, Rev. 5
" Technical Inspection of i
New Fuel".
Section 3.0 -
should include precaution on use of HP requirements /RWP.
Step j
4.1.14 - should Rad.
Materials shipping Form and/or DOE 741 Form be included here?
DCP 90-VlE0157, Rev. O To reduce nuisance tripping of the Diesel Generator Fuel Oil Transfer Pumps on thermal j
overload and stop leakage of fuel oil around pump base.
functioShould specify nal test requirements via Data Sheet 12.
Question 2 mil packing reduction appropriateness when problem may be corrected by installing vertical pump.
Revise / markup transmittal letter to correctly reflect package and return.
D.
The board unanimously concurred with the reportability determination for tho fci; cuing Deficiency cards.
1-89-1579 1-90-260 1-90-261 1-90-262 1-90-264
PR"3 90-81 P2g3 C Gr S
~
L.
The board tabled proccou r 00663-C, Rev.
O, " Fitness-For-Duty", with the follovir.g comment.
2 Step 4.1.3 - Change to Vogtle - Southern Company Section 3.0 - Respcncibilities of individuals and/or groups offsite (not ro. rotting to GMNP) should be put in another part of procedt:e ar Appendix or such.
Step 3.7 - Change "at ecch plant site" to "at Plant Vogtle" Conf')nntiality compromised for self referrals (sim e p approves return to work)
W131 9rieving empicye2a be paid?
Section 8.3 - Currently esccrts are not trained in Aberrant Behavicr - only Supervisors get aberrant behavior training.
Alcohol (positive) testing doesn't recaire VP approval for return to work (self referral vs. for cause).
F.
The board tabled TOP 2se:A-C-7-90-1, " Loss of Instrument
~
Air".
Operatirns v311 r 7172.i the TCP to determine if the TCP is valid c; should L; vuidea.
The board expressed n concern relative to thc preposed deletions.
G.
PRB Action Item 90-65-05 was reviewed.
W. F. Kitchens responded to a request by the PRB that the Trip Reduction Committee re-evaluate Trap Hazards Labeling.
This resulted from the boards' review of LER 2-90-011.
The response stated that the Trip Reduc. tion Committee'has initiated a review of labeling / signs fer critical components.
The Trip Reduction Committee is not re-evaluating Single point trips, and does not intend to at this time.
The Committee is looking at several specific trip reduction issues.
It was stated that last year, the Trip Reduction Committee reviewed and concurred with e.n Engincering Support recommendation tc stop spending resourcen or. the Single point trip studies, but rather on specific trip reduction measure.
Based on this recptnt-PRD Action Item 90-66-01 was closed.
H.
The board reviewed a lotter from the General Manager -
Nuclear plant to PRB and 3R3 Members concerning the reportability review of Deficiency Card 1-90-003, and the boards' split decision that the item was not reportable.
This deficiency involved c. potential violation of a license condition, specifically thr reactor power limit of 3411 MW.
The letter states thLt ha ad en additional reviews that were completed, it was ver'fied that. t.he item was not reportable.
The board concurred ii'.? this position, and the letter is being mado an attachment. to the ninutes for this PRB Meeting.
PRB 90-81 Pigo 5 of D s to why the revision was warrantec' and requested revised wording on the diesel start section.
The Lra rovision 1 was previously reviewed and approved b3 the PPS on May 8, 1990 and forwarded to corporate at thLt time.
The board decided to table the proposed Icn ravision presented so that the entire i
LER could be updated and returned to the PRB at a future meeting.
G. R. Frederi6r nd$ed that he felt the diesel i
start numbers in the eriginal LIR were incorrectly included because of various problems / confusion with the curveillance j
and operator logs and the trer. ding information recorded by Engineering Support.
i J.
J. G. Aufdenkampe addre sed t}' board on a previous reportability issue for a pro:
ed LER involving a potentially misced surveillance on Containment Penetrations.
The PRB concurred that the D0 vas not reportable at PRB-90-76.
J.
G. Aufde.nkan.pn stated that he had spoken with the NRC' Residents and.ttiat they had concurred with the PRB's de :nion after they were prcvid J with the information fror h
os
.e and Planning (which th2 FAB utilized in making the r%. tability deterr inatien).
J.
G. Aufdenkampe informed the board that the Vice Fresident, C.
K. McCoy stated that the item should not te rarcr:ed because of the installed blind flanges but he felt that an inadvertent compliance issue may preside in thic ircue.
J. G.
Aufdenkampe took *hr action to discues this Jtet. with the General Manager and would report back to the toard only if a change in reportability would be a}Ttopriate and the proposed LER was required to be submitted by Corporate.
4 Meeting Adjourned 4
p**'%
a 4
b
Pr n e c -t.I NtITiM5 Ni*.au j
GeorgiaPower d intstof fica Correspond:neo r,
i OATE:
June 4, 1990 RE:
Reportability Dete-4evior for Deficiency Card 1-90 003 Log: NOTS-00383 FROM:
G. Bockhold, Jr.
70:
PRB Members ar.d SRP Ma-bers On January 5,1990, the P% net to review the reportability of
eficiency Card 1-90-003. This deficiency involved a potential violation of a licence condito-specifically the reactor power limit of 3411 MW was not re h. The board dett TrncJ
- r. a split de:ision that the item rtable.
Subsequently, I requested th:t more infomation be obtained during additional reviews to verify tr.st the item was not reportable.
Mr. J. G. Aufdenkampe, c.' hnuary 10, 1990, issued a minority opinion questioning the recomendation o' the PRB. My decision not to repcrt this item on Janury 5, 1990, was based upon the majority recommendation and my belief h t mere information would be expeditiously provided by Mr. Aufdenkampe and his Technical Support Department.
The additional reviews were em41eted and verified that the item i
was not reportable.
If you has e sny questions or require additional information, please let me knew.
b
.Q GB/chd xc:
NORMS r.
- n
VEGP PLANT i< i.V I E W BOARD MEETING MINUTES
- ETING NO.
6 DATE M
PAGE 1
OF 4
,dEETING CONVENED 2:00 AN/FM;
.dfNG ADJOURNED 4:40 AM/PM
(
- VIA TELECON)
THIS MEETING CHAIRED BY:
(x) CHAIRMAN
( ) VICE CHAIRMAN VOTING MEMBERS PRESENT:
H. M. Han-1.M ng nr J.
G.
Aufdenkampe R.
L.
LeGrand PRB SECRETARY C.
Cross Tynan X%-VOTING MEMBERS PT.ESENT:
G. R. Frederick C.
P. Stinenpring J.
B.
Beasley VOTING ALTERNATES PRESENT:
J. P. Cash POR J.
E.
Swartzwelder R.
L. Mansfield FOR M. W. Horton N-VOTING ALTERNATES PRESENT:
FOR FOR FOR FOR i
FOR
_---w,.:----
GUESTS / TECHNICAL ADVISORS:
T. E. Webb M. W. Horton P. M. Kochery m.-
..a_--..-.
PRD ACTION ITEMS OPEP'..':
90-82-1 PRB ACTION ITEMS CLOSED:
None PRB MINUTES APPROVED None
-a..
-m-M..
t
.d d d k 7..# 8
=
a PRB SECRETARY PRB CHAIRMAN CC: NRC RESIDENT INSPECTOR (FORM NAME=PREAGENN
(
PRB 90-82 Pega 2 of 4 PRB MEETING MINUTES CONTINUATION 8NEET n
The following items were u-ani-.uzly recommended for approval.
A.
No unreviewed safety questien involved.
91705-C, Rev. 4
" Inventory and Testing of Emergency Preparedness Material / Equipment Which Are Not Part of the Emergency Kits" Generic Letter 90-04 Responna
" Status of the Implementation of Generic Safety Issues" (ELV-01726)
B.
The following items were unani.oasly recommended for approval with comment.
No unrevieved safety question involved.
19241-C, Rev.'8 "I'P.-F.1 Response to Imminent Pressurized Thermal Shock".
Safety Evaluation needs to be improved to at least specify why responses are stated, i.e.
references, FSAR Sections reviewed, Tech. Specs.
,_s 13202-1, Rev. 6
" Gaseous Releases". Step 3.4 -
Head to include Unit 2 consideration in this step (Include both units Haste Gas Systems).
13202-2, Rev. 1
" Gaseous Releases". Step 3.3 -
Need to include Unit 1 consideration in this step (Include both units Waste Gas Systems).
Unit 2 Cycle 1 Coastdown Comment:
Original Safety Safety Evaluation (ELV-01709)
Evaluation needs signatures from Site personnel (GPC).
Letter to NRC - Request For Terporary Waiver of Compliance (ELV-01775).
This letter involv.td the response time measurement for the Control Room Emergency Filtration System (CREFS) not including the diesel generater sequencer loading delays.
This supplemental letter requesta a tarporary waiver of compliance from TS Surveillance Require 'nt 4.3.2 for the CREFS until the next entry into Mode 5 for cach unit.
PRb 90-02 POg3 3 of 4 Commentst Page 1 & 2, Paragraph T./3
' eld to be more definitive "would appeur tu rtquire", Delete
" appear to".
Paragraph 4 - Operating tht? fans doesn't necessarily always deplete the charcoal.
I* <!ci.<3ndo on what's in the air.
Change to "... is subject te toing depleted due to the contaminants in the air".
Page 1 - Paragraph 1, Iczt aintence - Change " limits" to "within expected values" Page 1 - Plant Engineeri:0 rust verify the correctness of the last sentence of first paragraph PayL 2, Paragraph 1 - Conaldcr including times and margin numbers" Page 2, Paragraph 3 - Deinte " card" prior to "cequencer" Page 2, Paragraph 3 - Reference Generic Letter 89-07 at the end of last sentence Page 3, Paragraph 6 - Change " approved" to " concurs with" Page 1, Paragraph 2 - Rewce' d per attached markup C.
The board recommended approve.2 ef procedure 18028-C, Rev.
8,
" Loss of Instrument Air", with cor.nont.
No unreviewed safety question involved.
The vote was 4:0.
Hats:
H. M. Handfinger abstained from the vote.
C_omnent:
A.6, Page 5, A/ER and RNO - Change 65 psig to 70 psig.
B.5 - Check cyster.: r.or.ber on valves in this step.
H212:
This procedure change does not incorporate a TCP.
TCP 18028-C-7-90-1 was voided.
This TCP was tabled at a previous PRB meeting.
D.
P. M. Kochery returned DCP 90-vie 0157, Rev. 0 (previously approved with comment at PRR-7 9-81) to discuss deletion of the PRB comment relative to specifying the functional test requirements via Data Sheet 12.
The board stated that the comment should remain as steted and the approval status of the DCP remains as stated.
E.
LER 1-90-12, " Inadequate Testing Lceds to Inadequately Performed surveillance", was tabled to alles additional review time for PRB members.
" Loss or effsite Power Leads to Site Area Emergency", was tabled.
The LEn will be revised entirely to include Calcon switches and the NUREG.
k i
PRB 90-82 pig 3 4 Cf 4 C.
PRB Action Item 90-82-01 !sv.ie? for M.
W.
IIorton to review procedural controls fer Tamporary Modifications.
Consider the following during this review.
1)
Does the Temp. Mod. procedere adequately address administrative centro 19 :: t prccedure changes to be put in place or removed?
2)
Are we using the systen d!!.forently than intended by allowing Temp. Mods. to remain active fer extended periods?
Due date is 8/17/90.
~
Meeting Adjourned
\\
+
k d
l-.
j 4
4 4
1;.- 3-1993 10:15tw1 m m e i c r. i r
04. Tra 95.a9 P.23 VEGP PLANT REVIEW BOAED MEETING MINUTES ETING NO.
M DATE PAGE 1
OF 4
AM/P!5 MIETING AIVOURNED 3:20 AM/PM MEETING CONVENED 1: 00
( o VIA TELECON)
THIS MEETING CHAIRED BY:
(X) CHAIRMAN
( ) VICE CHAIR!'AN VOTING MEMBERS PRESENT:
J. E.SvarEteelder J.
G. Aufdenhampe PRB SECRETARY C.
Cross Tynan
-,_,,z,..-.
NON-VOTING MEMBERS PRESENT:
...-u_...._..,__.
VOTING ALTERNATES PRESENT:
M. L. Hobbc FOR H. M. Handfinger I.
A. Kochery TOR R.
L. LeGrand
._,m..
N-VOTING ALTERNATES PRESENT:
R. E.
Folker FOR G.
R.
Frederick FOR FOR FOR FOR
.m.
._,..m._m.
GUESTS / TECHNICAL ADVISORS:
R. A. Moye T. E. Wabb H.
L.
Beacher F. J.
Ealick A.
S.
Parton W.
C.
Guthrie
.n -,.-,...w w PRB ACTION ITEMS OPENED:
None PRB ACTION ITEMS CLOSED:
None PRB MINUTES APPROVED 90-81, 90-82
- - I
+
-4.e
' f" ANT se -
.*=
e--
e -e w
M O"
N.I-A.*
. ?m.
._-..,w-.
CC: NRC RESIDENT INSPECTOR (FORM. NAME=PRBAGEND)
_ _ _ _ -. - -.~
~. _ - -
d-us-1991, 10:le-o up. w 1LE :.,is 706 "W 9"48 P.24 PR3 90-84 Page 2 of 4
+.
PRB MEETING MINU'iLS CONTINUATION SHERT A.
Meeting Minutes 90-81 and 90-C2 W re unanimously approved as presented.
B.
The following items were unsuin.ausly recommended for approval.
No unreviewed safety quocticn involved.
19010-C, Rev. 8 "E-1 Loss of Reactor or Secondary Coolant" i
19223-C, Rev. 4 "FR-C.3 Response to Saturated i
Core Cooling" TCP 18019-C-7-90-4
" Loss of Residual Heat Removal" 00700-C, Rev. 9
" General Employee Training" LER 1-90-013
" Improper Application of Grace Period to Containment Air Lock Surveillance"
/
LDCR FS90-026 Modify PSAR 3.11 - Revise current VECP position on s
Environmental Qualification (EQ) of safety-related equipment located in mild environments.
LDCR FS90-027 Fevise FSAR 8.3.1, 9.5 and Tables 9.2.1-2 and 9.5.5.-2 to allow bypassing of High Jacket Water Diesel Trip Unit 1 Cycle 3 Startup Feport
. NOTS-00420 LDCR TS89-022 Revise Tech. Spec. 3.5.3.2 and associated bases to allow SlP's to be operable in Modes 5 & 6 for reduced inventory conditions.
Letter to NRC - Detailed ContrC Rocn Design Review -
ELV-01.599 Responses to NRC Regulatory hffec'.iveness Review (RER) findings 93041-C, Rev. 1 "Dsvelopment and Implementation of the Fuel Shuttle Sequence Plan"
1I.H-1993 10:1641 Uct e.' i a :T. c
~
'7tg 55 3 oS48 P.25 4
PRB 90-84 Page 3 of 4 J
~'
C.
The following items were unanimvusly recommended for approval with comment.
No unreviewed s'.*fety question involved.
00404-C, Rev. 14
" Surveillance Test Program".
]
Section 4.5.3 (page 21)
Reword to follow last statement in 4.5.4
~
LER 1-90-12
" Inadequate Testing Leads to Inadequately Performed Surveillance".
Add in the Abstract / Corrective Actions -
...are being prepared to test the sequencer and determine 4
response times".
92030-C, Rev. 4
" Fire Drill Program".
Step 4.3.1-Reword similar to the following:
"...should be assembled by the FPE and should include sufficient manpower from Fire Brigade Training Staff, Operations Department staff and FPE (The comment is to n21 specify the exact number of individuals).
19251-C, Rev. 4 "FR-Z.1 Rosponse to High Containment Pressure".
The Safety Evaluation should be/could be improved (wording).
13216-1, Rev. 19/
" Liquid Waste Release".
13216-2, Rev. 8 Steps 4.1.2/4.1.4 - Need consistency in referring to Waste Monitor Tank 009/09/#9/9 in the procedure and tagging in the field.
" Loss of offstte Power Leads to Site Area Emergency".
Corrective Action #4 - Change "61" valid starts to "69".
I
. - -_~ - _-
ir199~
10:. v
.6 706 554 s m P.26 l
PRB 90-84 Page 4 of 4 000bu-C, Rev. 10
" Safety and Environmental Evaluations".
Step 4.6.3 -
Reword such that Section B is i
where explanation for Yes to
'A2 should be written.
Step 4.6 - Review for including Emergency Plan 1
increase / decrease in effectiveness as Security Plan is included.
Step 2.6 -
Include preparer / reviewer definition.
Note:
The training on 00056-C is to be decided by K. R.
Holmes.
~ Procedure will not be signed / approved until that-determination is made.
i i
D.
The board unanimously concurred with the following items.
Event Report 2-90-002
" Reactor Trip Due.to Loop 3 MSIV Closure" Unit 1 - 1R2 Integrated Leal: Rate Test Final Report o~
E.
The board unanimously concurred.with the reportability determination for the following Deficiency Cards.
1-90-263 1-90-271 1-90-266 1-90-272 1-90-268 1-90-273 1-90-270 F.
The board tabled DC 1-90-2C9, " Patrol checks that was '
on 6-1-90 for system problems ;seo SR #'s 4086-30 and was not done correctly".
The DC will be reviewed at a lu....
meeting when a related LER is made available for review.
G.
The board tabled procedure CC410-C, Rev.
5,
" Control of r Software", with the following comments:
- Minimize quality requiremant-for Category A sv :.> arc
- Change final approval "r:0 Acelstsnt General Manager to Department Manager fer category 3 software changes.
H.
The board discussed the prepm,ed revision to procedure 00400-C, " Plant Design Control".
A nuggestion was ". ' -
add a check sheet to list it.w required for Returr ' r " r lw and that this sheet should te 3 part of the MWo package.
M:eting Adjourned
- i
V I., 4 PLANT REVIEW BOARD MEETING MINUTES
- ETING NO.
g DATE N
PAGE 1
OF 4
MEETING CONVENEO
- 30 A!1/ PP. : MEETING ADJOURNED 3:25 AM/PM
(
- VIA TELECON)
THIS MEETING CHAIRED 3Y:
(X) CHAIRMAN
( ) VICE CHAIRMAN VOTING MEMBERS PRESENT:
M. W. Horton J. E. Swartzwelder R.
L. LeGrand H. M. Handfinger T. V.
Greene PRB SECRETARY C.
Cross Tynan NON-VOTING MEMBERS PRESENT:
C.
P.
Stir.cspring E. M. Dannomiller K. R. Holmes
__m
.n.
VOTING ALTERNATES PRESENT:
J. C. Williams FOR J. G. Aufdenkampe FOR N-VOTING ALTERNATES PRESENT:
m.
FOR FOR FOR FOR FOR GUESTS /TECHN1 CAL ADVISORS W. C. Gabbard n =_-
PRB ACTION ITEMS OPENED:
PRB-90-90-01, 02, 03 PRB ACTION ITEMS CLOSED:
None PRB MINUTES APPROVED 90-84, 90-85, 90-86, 90-87, 90-88 A
_.x b
(J A.a. v
'PRBSECR[TARY PRB CHAIRMAN
.MJ""*"
CC: NRC RESIDENT INSPECTOR (FORM NAMER-PRBAGEND)
PRD 90-90 Paga 2 of 4
.i PRB EEETING MIND 2E8 CONTINUATION SEEET A.
Hoeting Minutes 90-84, C O, c. n 90-P6, 90-87 and 90-88 were unanimously approved as presented.
B..
The following items were unanimously reconmended for approval.
No unreviewed safety question involved.
s 93300-C, Rev. 7
" Conduct of Refueling Operations" I
90167-C, Rev. 2
" Security Department Procedure Reviewer Qualifications" j
i i
91701-C, Rev. 5
" Preparation and Control of i
Emergency Planning Documents" 90010-C, Rev. 5 (SAFEGUARDS)
Inservice Inspection Summary Report - 1R2 Outage (MSV-00243) j MDD 90-V1M122, Rev. O NSCW Cooling Water Pumps and Transfer Pumps coupling guards (1-1202-P4-001 thru 008)
/
MDD 90-V2M123, Rev. O NSCW Cooling Water Pumps and Transfer Pumps. coupling guards (2-1202-P4-001 thru 008) j DCP 90-V2N0087, Rev. O Add vent valve to
'A' Train Spent Fuel Pool Cooling piping i
DCP 88-V1N0068, Rev. O To prevent inadvertent actuation of i
sprinkler system 6077 when Fire i
Zone 133A is placed in an alarm condition DCp 90-V2N0090, Rev. O To install Paul Monroe true test in place manifolds on Steam Generator hydraulic snubbers DCP 89-V2N0095, Rev. O Add a separate Acknowledge / Reset / Test pushbutton for ALB09; Add a master audible silence pushbutton for all horns.
A
PRB 90-90 FcgD 3 of 4 A
LDCR FS89-098 Madify TSAR 9.5.4-7 to correspond with new conservative value of 68,000 for Low Level Alarm (Diesel Fuel oil Storage Tank)
DCP 87-V1E0206.
T-ENG-90-26, Rev. O F.esponse Time Test of the Sequencer (Results package)
Auto / Manual Block runction, Unit 2, Train A.
T-ENG-90-27, Rev. O Response Time Test of the Sequencer (Results package)
Auto / Manual Block Function, Unit 2, Train B.
C.
The following items were unanitiour.ly recommended for approval with comment.
No unravicu 3 safety question involved.
Letter to NRC, "Steau Gerert.tcr Level Instrumentation -
Additional Information (LLV-01325)".
Comment:
Page 2, first paragraph Change "three unplanned reactor trips..." to "...two in 1989...". - Lenote the following as Note (1):
"1 inches as measured from tcp of the tubesheet".
NRC Bulleting 90-01 Response, " Loss of Fill-oil in Transmitters manufactured by Rosemount (M3V-0024 6) ".
Comments Page 3, A -
Delete " licensed operatorn for".
Page 3, B - Delete " safety" prior to " engineered".
Psge 5 - This additional wording is unnecessary and should not be included.
" Loss of Offsite Power Leads to Site Area Emergency".
Comnent:
Page 6, third paragraph, third sentence -
Delete "new", change "calibratad" to "recalibrated", change DGTA to DG1B after reviewing to ensure it is correct.
Delete ado paragraph on Part 21 - This paragraph has no affect or impa-n the LER by including this information on precsure switches.
.f Corporate maintains it nust stay, add " trip" prior to "se-s" in second to last sentence.
Corrective Action #5 - Delet and the new switches" and replace with "or recalibrated".
00400-C, Rev. 12
" Plant Design Control".
Review to ensure consistency in deleting the reference to SDCP.
Why not use one DCP for both units rather than one l
DCP for each un'it.
Step 2.2.2 -
Change "and" to "or".
No_te:
The following PRS Action Items were initiated as a result of the review of p.rocedure 00400-C.
PRB 90-90-01 M.
W.
Morton to investigate the use of one DCP for both units (for like changes) rather than one DCP for each unit.
Due 7/27/90.
e PRB 90-90 PZg3 4 of 4 t
PRB 90-90-02 M. W. Herton to review the Seismic category I versus safety related definition issue with the Corporate and Site Management.
Return the results of discussions to PRB as to change / revision to the 00 Program and/or DCP Program / definition on treatment of Seismic Category I.
Due 7/27/90 PRB 90-90-03 H. M. Handfinger to initiate a graded approach for treatment of nafety related/non-safety related items on the Secondary plant.
Be specific, i.e. a proposed revision to procedure 00400-C.
Due 7/27/90 D.
The board ansninausly cor turred with Event Report 1-90-007, "DG1B Trip of 5/23/90".
E.
The boaru unanimously concurred with the reportability determination for the folicwing Deficiency Cards.
1-90-275 1-90-279 1-90-281 1-90-282 1-90-285 2-90-0055 1-90-283 (PRB concurred with the disposition as changed to "3C -
Deficiency Not Reportable".
F.
The board tabled Revised Response to NRC Inspector Follow-t' m
50-424/87-71-01.
H. L. Dencher to provide more informatio why this testing cannot be performed.
G.
W.
F. Kitchens discussed the issue of a tiesel failure has a
potential 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> reportability.
The DC on this failure has not been submitted to the PRE nt this time for concurrence.
The board did concur that a 30-day report (LER) should be initiated for repciting non-compliance with the Tech. Spec. Action Statements on the containmer.t coolers.
This lid dienol failure involved tape on the diesel fue2 racks causin a failure to a
start.
Meeting Adjctrned
+
.#