Text
_ _ _ _ _ _
s4
[4 KEog*q UNITED STATES
~'g NUCLEAR REGULATORY COMMISSION o
- E WASHINGTON, D. C. 20555 March 21. 1988 Docket Nos.: 50-321 50-366 50-424 50-425 LICENSEE:
Georgia Power Company FACILITIES:
Hatch Units 1 and 2 and Vogtle Units 1 and 2
SUBJECT:
SUMMARY
OF MEETING HELD MARCH 15, in88, TO DISCUSS STATUS OF HATCH AND V0GTLE LICENSING ACTIONS On March 15, 1988, the staff met with representatives of the Georgia Power Company at the Region II offices in Atlanta to discuss the status of licensing actions and activities for the Hatch and Vogtle Nuclear Plants.
Participants are listed in Enclosure 1. outlines the topics discussed during the meeting.
There are several outstanding licensing submittals for the Hatch units that are of particular importance to the licensee.
These are listed in Enclosure 3.
All except the requested change to a 40-year life from OL issuance are currently in various stages of review by the staff and should be issued within the next two or three months. also provides a listing of new amendment requests that the licensee probably will be submitting within the next few months, and a listing of meetings and inspections tentatively scheduled for the next few months.
The status of the Hatch Units as of the date of the meeting was discussed briefly. An outline of the status is provided in Enclosure 4.
At the time of the meeting, Hatch Unit I was operating at 100% power and Unit 2 was completing its 7th refueling outage. Enclosure 4 also lists the major activities accomplished during the outage.
A 1.isting of the discussion topics regarding Vogtle Unit 1 is presented in.
The plant has had two trips since the first of the year, both caused by equipment failure, with a resultant low capacity factor for the first two months.
The capacity factor for 1987 was 70.7%. also outlines the results of the Vogtle Unit 1 January 1988 maintenance outage and the plan for the 1988 refueling outage originally scheduled to begin in mid-September. This outage may slip several weeks due to the plant downtime earlier this year.
It appears that overlapping outages between the Vogtle and Hatch Units do not cause problems e.v. cept for a possibility of competing demands on the time of the ISI technicians who come from Southern Companv Services.
8803240217 880321 "
PDR ADOCK 05000321 P
4
~, also presents a listing of upcoming meetings ~ regarding Vogtle Unit 1, submittals now under review by the staff and additional sebmittals scheduled for the near future, as well as issues that are pending.
The status of.Vogtle Unit 2 construction was discussed briefly, but without getting into particular detail.
It was agreed that the next quarterly meeting should be held at one of the-plant sites. The date and place will be detennined later.
Lawrence P. Crocker, Sr. Project Manager Project Directorate II-3 Division of Reactor Projects-I/II
/c/
Jon B. Hopkins, Project Manager Project Directorate 11-3 Division of Reactor Projects-I/II c
DISTRIBUTION:
D0 u t k F R E-LOCAL PDR NRC PDR SVarga Glainas l
OGC-WF EJordan JPartlow ACRS (10) j PD II-3 Reading File l
HATCH PLANT FILE L
V0GTLE PLANT FILE I
1.Crocker l
JHopkins MSinkule CPatterson LTrocine JPenning i
l JRogge JHeidt SBethay JBailey i
PD II 3
[II-3 LCrocker I iJHopkins 03/)6/88
/
03/p/88
1
. Enclosure 1 ATTENDEES HATCH AND V0GTLE OllARTERLY Varch 15, 1988 Georgia' Power Company Southern Company Services Jim Heidt Jim Bailev Steve Rethay Bill Burns NRC Marvin Sinkule Charles.'atterson Leigh Ti"; cine John-Henning John Rogge Jon-Hopkins Larry Crocker r
l l
l l
l i-t
_ __ _. _.._...._,___.._,,...... _ ____ - _... _.,,..,, _._. _ _,,., _,. ~,.__,.,,,
ble /onve 1
3 NRC GPC Quarterly Meeting.
10:30
' Outstanding Submittals Hatch Plant Status Hatch Upcoming Submittals Hatch Upcomir.g Meetings-Hatch 11:30 Outstanding Submittals Vogtle Plant Status Vogtle Upcoming Submittals Vogtle Upcoming Meetings Vogtle l
l t
{
l l.
i i
1968C
Enelosu,,; '3 Outstanding Licensing Submittals o
PROPCSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION PERMIT o
CHANGE TO TECHNICAL SPECIFICATIONS - RIVER LEVEL o
PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS ELECTRICAL SURVEILLANCE INTERVAL o
PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS MAIN STEAM ISOLATION VALVE SURVEILLANCE TESTING o
PROPOSED CHANGES TO IST PROGRAM 1982C
l e
Upcoming Hatch Submittals
' Containment Zone Definition Suppression Pool Temperature PCIS Table Administrative Changas Fuel (for ANF bundles & GE-8 at 14.4 Kw/ft)
Conformance to GL 88-01 (IGSCC)
MSIY Stroke Time (2 8 Sec. )
SLC Testing (Using Enriched Boron instead of Distilled Water)
's, RSCS/RWM (Eliminates RSCS, lowers setpoint where RWM is required)
Appendix G Surveillance Samples g.q,,
p (p G,,,
.Q uwti.-a.-p-I
< ~ N JC, Q
,u s? s at * -
l l
I 1982C
--~
1 1
Upcoming Hatch Meetings Seismic Margin 4/12
- - m M dh //d Commissioner Carr's Visit
$d/24 PRE SALP 4/28
};co Jb &3o q
' v3M M $ o~d - tw4h' I
ncon 4FL lug.
vs b th,s'~
EvycCwg LLyf OWAe 4s l%
ic P-n..
/
l 1982C
,wy r
,,-+meee,
-+es, r,
we
.v-,,w
.-wrve,-e-av es-ve-...2,
+,----v-
s'.
Ek h>u n +-
i PLANI E. i. HATCH PLANT STATUS a.3 0F MARCH 14.1988 UN!T ONE
- CN UNE AT 100% POWER.
- NO MAJOR OPERATIONAL PROBLEMS.
14 CONSECUTIVE DAYS ON UNE FOLLOWING SCRAM ON 2/26/85.
SCRAM WAS DUE TO MAN GENERATOR GROUND FAULT DETECTION AND SUBSEQUENT TURSINE TR!P.
UNIT I'#0-
- IN COLD SHUTDOWN FOR THE SEVENTH REFUEUNG OUTAGE.
- DAY 610F A SCHEDULED 65 DAY OUTAGE.
- SCHEDULED OUTAGE COMPLETION DATE 3/17/88.
L
Pt/.NT HATCH UNIT TWO SEium ntrVEuNG OUT+GE 5vMW.Rr M/,jCR VIORK ACIMiiE3
- cEPJEL!NO
+ ALL R'EL REMOVED FROM THE CCRE #1D S!PPED.
A !! LEAXERS !0ENT! RED.
S.E.nJEL FOR !6 M0!EH CYCLE 184 NE# AJEL BUNDLES AND 4 a
LTAe WEPE INSTALLE0
- INCORE/UNDERVESSEL WORK
+ REPLACED 12 CONTROL ROD ORIVES,6 LPRMs,4 CONTROL ROD 5 LADES. 6 SHROUD HEAD 50LT5, AND 1 eET PUMP EEAM.
- INSERVICE liiSPECii0ii RFV INTERNAL 5 (INCLUDING SHROUD 3UFRORT PLATE MAMVA'rs).
+
+ RPV LEAKAGE TEST.
+ LOCAL LEAX PATE EST'"O t OK TOTAL TESTS; 32 FA LURES lNCLUDlNG 2 f,!SP!s.
J u. -
- TURE!NE/ GENERATOR WORK
+ GENE?AL INSPECT!ON AND MAINTEN.ANCE
- REGULATORY COMMITNENTS
+ IE9 85 03 TESilNG ON 23 HPCI & RCIC VALVES.
+ OVER 300 E.O. PROGRAM ACTMTIES.
+ COMPLETED ATVis MODFICAii0ns.
Myrf#4 M * "O ~<* 6- -
u.RMr R#L ?EFERENCE LEG iH5bTiON (GL 54 23) t
- MAJOR MODiFiCATi0M5
+ UVE LO/D PACKING ON APPR0XIVATELY 20 '#LVES.
+ mSTALLATi0tl CF NE# CR(WELL COOLER.
Emhou<e s PLANT V0GTLE DISCUSSION TOPICS 0
PLANT PERFORMANCE W. E. BURNS 0
PLANT OUTAGES W. E. BURNS 0
UPCOMING MEETINGS W. E. BURNS 0
SUBMITTALS UNDER REVIEU W. E. BURNS 0
UPCOMING SUBMITTALS W. E. BURNS 0
OTHER PENDING ISSUES W. E. BURNS 0
UNIT 2 OPERATING LICENSE ISSUES J. A. BAILEY i
1 PLANT V0GTLE PERFORMANCE o
REACTOR TRIP DUE TO RCP DISTANCE RELAY FAILURE 0,1 JANUARY 17, 1988 0
RETURNED TO POWER OPERATIONS FOLLOWING JANUARY MAINTENANCE OUTAGE ON FEBRUARY 10, 1988 0
REACTOR TRIP FROM FULL POWER DUE TO EXCITER TRIP ON FEBRUARY 15, 1988 0
RETURNED TO POWER OPERATIONS ON FEBRUARY 17, 1988 0
PLANT CAPACITY FACTOR COMMERCIAL OPS THROUGH FEBRUARY:
67.2%
1988 THROUGH FEBRUARY:
52.8%
1987:
70.7%
G0AL:
67.6%
0 PLANT FORCED OUTAGE RATE COMMERCIAL OPS THROUGH FEBRUARY:
24%
1988 THROUGH FEBRUARY:
42%
1987:
19.4%
G0AL:
11%
4 s
PLANT V0GTLE OUTAGES JANUARY 1988 OUTAGE o
96% PLANNED FORCE OUTAGE SCHEDULE COMPLETED 0
250 OUTAGE MW0'S WORKED 0
9 SIGNIFICANT LLRTS COMPLETED 0
MAJOR OUTAGE ISSUES KD-10 RELAYS T/G HYDR 0 GEN LEAK REPAIRS CRACKED WELD ON PRESSURIZER SAFETY VALVE LINE DRAIN RCP #1 PHASE "C" OVERCURRENT RELAY REPAIR RHR CROSS CONNECT VALVE 1HV-8716 A&B MOTOR REPAIR 1988 REFUELING OUTAGE o
START SCHEDULED FOR MID-SEPTEMBER 0
CRITICAL PATH APPROXIMATELY FIFTY DAYS 0
750 PM MWOS, 600 CM MWOS, 25 DCPS 0
MAJOR OUTAGE ITEMS REFUELING ATWS/AMSAC COMBINE U1/U2 CONTROL ROOMS ALTERNATE RADWASTE FACILITY VENT EXHAUST HEPA FILTERS T/G INSPECTIONS D/G INSPECTIONS ROUTINE INSPECTIONS:
APP. J, ISI, Ei, SNUBBERS, ETC.
PREVENTATIVE MAINTENANCE
PLANT V0GTLE UPCOMING MEETINGS 0
MAJOR TEAM' AUDIT ON EQUIPMENT QUALIFICATION, MARCH 21-25, 1988 0
PROPOSED MANAGEMENT MEETING ON SECURITY ISSUES, MARCH 29 OR 30, 1988 0
PROPOSED PRE-SALP MANAGEMENT, AUGUST 1988 0
PROPOSED AD-H0C MEETINGS ON TECHNICAL SPECIFICATIONS (UNIT 1/2 COMBINED T.S. & U1 OUTAGE RELATED T.S.
REVISIONS), T.B.D.
l
e 4*
PLANT V0GTLE SUBMITTALS UNDER REVIEW AT NRC 0
TECH SPEC CHANGE - CHLORINE DETECTOR SETP0 INT (SL-2603, 8/25/87) 0 TECH SPEC CHANGE - CORPORATE AND SITE ORGANIZATIONS (SL-3874, 12/28/87) 0 TECH SPEC CHANGE - AUX FEEDWATER SYSTEM SURVEILLANCE (SL-3831, 2/4/88) 0 TECH SPEC CHANGE - SPRAY ADDITIVE TANK, CONTROL BUILDING SUMP TANK RADIATION MONITOR (SL-3777, 2/4/88) 0 EXEMPTION REQUEST - FSAR ANNUAL UPDATE SCHEDULE (SL-3976, 1/15/88) o ENFORCEMENT ACTION RESPONSE - EA 87-115 RESPONSE 10/5/87 l
l l
l l
PLANT V0GTLE UPCOMING SUBMITTALS 0
3 LERS, 4 P0TENTIAL LER SUPPLEMENTS, 1 SLER, 2 POTENTIAL SPECIAL REPORTS 0
2 RFAI (AMSAC ISOLATORS & GL-83-28 2.2.1) 0 1 IER A8-06 (4 POTENTIAL IERS) 0 5 TECH SPEC CHANGE PACKAGES CONTROL ROOM HVAC*
PMTC*
- ORGANIZATION CHARTS F / CONTAINMENT SPRAY Q
- EXTENSIVE NRC REVIEW EFFORT REQUIRED: CRITICAL 0
NUMEROUS ROUTINE PERIODIC REPORTS 0
SECURITY PLAN REVISIONS FOR UNIT 2 0
EMERGENCY PLAN REVISIONS FOR UNIT 2 0
ISI/IST PLAN REVISIONS 0
POTENTIAL 10 CFR 21 REPORTS
a OTHER PLANT V0GTLE PENDING ISSUES 0
INTERPRETATION OF REG. GUIDE 1.108 DIESEL GENERATOR REPORTING REQUIREMENTS 0
REPORTABILITY POSITION PAPERS FOR 10 CFR 50.73 REPORTS 0
APPLICATION OF GRACE PERIODS FOR TECH SPEC SURVEILLANCES 0
RELIEF FROM UNIT 1 CONTROL ROOM PRESSURIZATION REQUIREMENTS DURING UNIT 2 HVAC TESTING 0837M l