MONTHYEARML20209G6971999-07-16016 July 1999 Summary of 990624 Meeting with Util in Rockville,Md to Discuss Plant License Renewal Program.List of Meeting Attendees & Presentation Matls Discussed at Meeting Encl ML20153H4941998-09-24024 September 1998 Summary of 980818 Meeting with Util in Rockville,Md to Discuss Plant Hatch License Renewal Process.List of Meeting Attendees & Copy of Presentation Matl Discussed at Meeting, Encl ML20249A6381998-06-15015 June 1998 Summary of 980604 Meeting W/Listed Attendees in Rockville,Md to Discuss Containment Analysis for Extended Power Uprate for Plant,Units 1 & 2.Licensee Slides Encl ML20203B4761998-02-11011 February 1998 Summary of 980128 Meeting W/Util in Rockville,Md Re Licensee Application for License Amend .List of Attendees & Licensee Response to Questions Encl ML20198Q5881997-10-31031 October 1997 Summary of 970910 Meeting W/Util in Rockville,Md Re Status of BWR Power Uprate Program.List of Attendees,Agenda & Handouts Encl IR 05000424/19970991997-10-0202 October 1997 Summary of 970924 Meeting to Discuss NRC SALP Repts 50-424/97-99 & 50-425/97-99,dtd 970915 for Facility.List of Attendees,Summary of Matls Used & Presentation Encl ML20211C9021997-09-11011 September 1997 Summary of 970904 Meeting W/Util to Discuss Licensee Plans to Establish ISFSI Installation at Hatch Npp.List of Meeting Attendees & Overhead Slides Presented by Licensee Encl ML20217L8701997-08-14014 August 1997 Summary of 970731 Meeting W/Southern Nuclear Operating Co, Inc in Birmingham,Al Re Plant Status,Major Problems & Other Topics at Farley,Hatch & Vogtle Nuclear Plants.List of Attendees & Presentation Handouts Encl ML20141J7391997-08-12012 August 1997 Summary of 970811 Meeting W/Util Re Radiological Controls at Plant.List of Meeting Attendees Encl ML20138G4691997-05-0505 May 1997 Summary of 970409 & 10 Meeting W/Util in Baxley,Ga to Discuss Analysis & Design Features of Unit 1 & Unit 2 SFPs & Associated Cooling Sys.List of Attendees Encl ML20059D5301993-12-29029 December 1993 Summary of 931210 Meeting W/Gpc & Consultants in Rockville, MD Re Request to Delete TS for Msivlcs & to Increase MSIV Leakage Rate for Plant,Unit 2.List of Attendees Encl ML20058M9451993-09-29029 September 1993 Summary of 930908-09 Meeting W/Util in Rockville,Md Re Status of Current Licensing Activities for Plants ML20058M1861993-09-22022 September 1993 Summary of Operating Reactors Events Meeting 93-35 on 930915 ML20057B6051993-09-16016 September 1993 Summary of 930831 Meeting W/Util in Rockville,Md Re Two Potential Mod Currently Being Considered to Enhance Util Electric Power Sys ML20056F8171993-08-0909 August 1993 Summary of Operating Reactors Events Meeting 93-29 on 930804.List of Attendees & Viewgraphs Encl ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20126F7631992-12-21021 December 1992 Summary of 921116 Meeting W/Util in Rockville,Md to Discuss Licensee Plan & Conclusion Re Degraded Grid Voltage Setpoints at Plant ML20129F5871990-07-12012 July 1990 Summary of 900712 VEGP Plant Review Board Meeting 90-96 Re Listed Procedures Including Procedure 00663-C,Rev 0, Fitness-For-Duty Program ML20055F7341990-07-11011 July 1990 Summary of 900628 Interface Meeting W/Util in Birmingham,Al Re Potential Issues Affecting Both NRC & Licensee Organizations.Next Interface Meeting Tentatively Set for Dec 1990 or Jan 1991.Agenda Encl ML20129H0511990-06-21021 June 1990 Summary of 900621 Plant Review Board Meeting 90-84.Items Unanimously Recommended for Approval,Listed ML20129H0401990-05-10010 May 1990 Minutes of 900510 Plant Review Board Meeting 90-67.Submits List of Items That Were Unanimously Recommended for Approval W/Comments ML20129F5541990-04-19019 April 1990 Summary of 900419 VEGP Plant Review Board Meeting 90-60 to Discuss Proposed Rev to Software Controls Program ML20129F5321990-04-12012 April 1990 Summary of 900412 VEGP Plant Review Board Meeting 90-57 to Discuss Listed Items,Unanimously Recommended for Approval ML20058K1251989-11-24024 November 1989 Summary of CRGR Meeting 172 on 891025 Re Listed Items, Including Proposed Rev 3 to Reg Guide 1.35 & Std Format for Backfit Discussions to Be Included in Future Generic Ltrs & Bulletins.W/O Stated Encls ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246B2351989-06-30030 June 1989 Summary of Onsite Meeting W/Licensee on 890523-25 Re Mar 1989 Check Valve Leaks at Plant ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram ML20245F2221989-06-0808 June 1989 Summary of Operating Reactors Events Meeting 89-21 on 890531.List of Attendees & Related Info Encl ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247J6991989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl ML20247J7051989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl. Record Copy ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20246P8231989-05-16016 May 1989 Summary of 890405 Meeting W/Util in Rockville,Md Re Issues Concerning Two Relief Requests for Facilities.Relief Requests Cover Hydrostatic Test of Main Steam Line Between Outboard MSIV & Turbine Stop Valve & IGSCC Insp of Welds ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20245A8761989-04-19019 April 1989 Summary of 890417 Meeting W/Util in Bethesda,Md Re Criteria Used to Classify Operating Events as Safety Sys Failures in Performance Indicator Program ML20248K3761989-04-10010 April 1989 Summary of Operating Reactors Events Meeting 89-014 on 890405.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams for Wk Ending 890402 Encl 1999-07-16
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20209G6971999-07-16016 July 1999 Summary of 990624 Meeting with Util in Rockville,Md to Discuss Plant License Renewal Program.List of Meeting Attendees & Presentation Matls Discussed at Meeting Encl ML20153H4941998-09-24024 September 1998 Summary of 980818 Meeting with Util in Rockville,Md to Discuss Plant Hatch License Renewal Process.List of Meeting Attendees & Copy of Presentation Matl Discussed at Meeting, Encl ML20249A6381998-06-15015 June 1998 Summary of 980604 Meeting W/Listed Attendees in Rockville,Md to Discuss Containment Analysis for Extended Power Uprate for Plant,Units 1 & 2.Licensee Slides Encl ML20203B4761998-02-11011 February 1998 Summary of 980128 Meeting W/Util in Rockville,Md Re Licensee Application for License Amend .List of Attendees & Licensee Response to Questions Encl ML20198Q5881997-10-31031 October 1997 Summary of 970910 Meeting W/Util in Rockville,Md Re Status of BWR Power Uprate Program.List of Attendees,Agenda & Handouts Encl IR 05000424/19970991997-10-0202 October 1997 Summary of 970924 Meeting to Discuss NRC SALP Repts 50-424/97-99 & 50-425/97-99,dtd 970915 for Facility.List of Attendees,Summary of Matls Used & Presentation Encl ML20211C9021997-09-11011 September 1997 Summary of 970904 Meeting W/Util to Discuss Licensee Plans to Establish ISFSI Installation at Hatch Npp.List of Meeting Attendees & Overhead Slides Presented by Licensee Encl ML20217L8701997-08-14014 August 1997 Summary of 970731 Meeting W/Southern Nuclear Operating Co, Inc in Birmingham,Al Re Plant Status,Major Problems & Other Topics at Farley,Hatch & Vogtle Nuclear Plants.List of Attendees & Presentation Handouts Encl ML20141J7391997-08-12012 August 1997 Summary of 970811 Meeting W/Util Re Radiological Controls at Plant.List of Meeting Attendees Encl ML20138G4691997-05-0505 May 1997 Summary of 970409 & 10 Meeting W/Util in Baxley,Ga to Discuss Analysis & Design Features of Unit 1 & Unit 2 SFPs & Associated Cooling Sys.List of Attendees Encl ML20059D5301993-12-29029 December 1993 Summary of 931210 Meeting W/Gpc & Consultants in Rockville, MD Re Request to Delete TS for Msivlcs & to Increase MSIV Leakage Rate for Plant,Unit 2.List of Attendees Encl ML20058M9451993-09-29029 September 1993 Summary of 930908-09 Meeting W/Util in Rockville,Md Re Status of Current Licensing Activities for Plants ML20058M1861993-09-22022 September 1993 Summary of Operating Reactors Events Meeting 93-35 on 930915 ML20057B6051993-09-16016 September 1993 Summary of 930831 Meeting W/Util in Rockville,Md Re Two Potential Mod Currently Being Considered to Enhance Util Electric Power Sys ML20056F8171993-08-0909 August 1993 Summary of Operating Reactors Events Meeting 93-29 on 930804.List of Attendees & Viewgraphs Encl ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20126F7631992-12-21021 December 1992 Summary of 921116 Meeting W/Util in Rockville,Md to Discuss Licensee Plan & Conclusion Re Degraded Grid Voltage Setpoints at Plant ML20129F5871990-07-12012 July 1990 Summary of 900712 VEGP Plant Review Board Meeting 90-96 Re Listed Procedures Including Procedure 00663-C,Rev 0, Fitness-For-Duty Program ML20055F7341990-07-11011 July 1990 Summary of 900628 Interface Meeting W/Util in Birmingham,Al Re Potential Issues Affecting Both NRC & Licensee Organizations.Next Interface Meeting Tentatively Set for Dec 1990 or Jan 1991.Agenda Encl ML20129H0511990-06-21021 June 1990 Summary of 900621 Plant Review Board Meeting 90-84.Items Unanimously Recommended for Approval,Listed ML20129H0401990-05-10010 May 1990 Minutes of 900510 Plant Review Board Meeting 90-67.Submits List of Items That Were Unanimously Recommended for Approval W/Comments ML20129F5541990-04-19019 April 1990 Summary of 900419 VEGP Plant Review Board Meeting 90-60 to Discuss Proposed Rev to Software Controls Program ML20129F5321990-04-12012 April 1990 Summary of 900412 VEGP Plant Review Board Meeting 90-57 to Discuss Listed Items,Unanimously Recommended for Approval ML20058K1251989-11-24024 November 1989 Summary of CRGR Meeting 172 on 891025 Re Listed Items, Including Proposed Rev 3 to Reg Guide 1.35 & Std Format for Backfit Discussions to Be Included in Future Generic Ltrs & Bulletins.W/O Stated Encls ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246B2351989-06-30030 June 1989 Summary of Onsite Meeting W/Licensee on 890523-25 Re Mar 1989 Check Valve Leaks at Plant ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram ML20245F2221989-06-0808 June 1989 Summary of Operating Reactors Events Meeting 89-21 on 890531.List of Attendees & Related Info Encl ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247J7051989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl. Record Copy ML20247J6991989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246P8231989-05-16016 May 1989 Summary of 890405 Meeting W/Util in Rockville,Md Re Issues Concerning Two Relief Requests for Facilities.Relief Requests Cover Hydrostatic Test of Main Steam Line Between Outboard MSIV & Turbine Stop Valve & IGSCC Insp of Welds ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20245A8761989-04-19019 April 1989 Summary of 890417 Meeting W/Util in Bethesda,Md Re Criteria Used to Classify Operating Events as Safety Sys Failures in Performance Indicator Program ML20248K3761989-04-10010 April 1989 Summary of Operating Reactors Events Meeting 89-014 on 890405.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams for Wk Ending 890402 Encl ML20248K1641989-04-0606 April 1989 Summary of 890330 Meeting W/Util in Rockville,Md Re Issues on Suppression Pool Temps for Plant 1999-07-16
[Table view] |
Text
-_-- _ _ _ - _ - _ _ - _ - _ _ _ _ _-
i n
- l. August 3, 1989
.4' Docket Nos. 50-321, 50-366 50-424, 50-425
' LICENSEE: Georgia' Power Company FACILITY: Plant Vogtle, Units 1 and 2 Plant Hatch, Units 1 and 2
SUBJECT:
SUMMARY
OF JULY 25, 1989 GPC/FRC INTERFACE MEETING On July 25, 1989, the NRC staff (including NRR Project Managers, Region II personnel, and resident inspectors for both Hatch and Vogtle plants; met with representatives of the Georgia Power Company (GPC) in Birminghan, Alabama to discuss the SON 0PC0/GPC corporate organization including generic activities and ]
initiatives involving the Vogtle and Hatch plants. This interface meeting was proposed by the NRC staff and was the first of its kind with GPC. Sub sequent 'l meetings are expected to be held on a bimonthly basis to discuss issues that have potential for impacting both NRC and GPC organizations. The intent of these meetings is to foster an open communication and information exchange and I
in this regard the meeting was a success.
Messrs. G. Hairston, T. Beckham, K. McCoy, L. Long, and K. McCracken provided an overview of the current SON 0PC0 (still pending SEC approval) corporate structure, responsibilities, and interface with the Hatch and Vogtle plants.
Essentially, the SONOPCO organization including its support role for the Hatch and Vogtle plants remains unchanged from previous GPC presentations to the staff.
The afterncon session consisted of separate breakout meetings for the Hatch and Vogtle projects wherein upcoming priority issues were discussed. Meeting participants are listed in Enclosure 1. The slides presented by GPC are
, provided in. Enclosure 2. The next GPC/NRC interface meeting is tentatively l scheduled for. October at the Vogtle plant.
Original signed by:
Timothy A. Reed, Project Manager Project Directorate 11-3 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Enclosures:
As stated l< OfC'!
cc w/ enc 1: '
l - See next page I g Distribution:
l$8 Docket Filer J. Partlow L. Crocker L. Trocine
,@8 'NRC '& l'ocal ~PDRs S. Varga OGC (info. only) W. Scott
! PD 11-3 Reading D. Matthews E. Jordan ACRS (10) 8d T. Murley T. Reed G. Lainas R. Borchardt gg J. Sniezek J. Hopkins A. Herdt ime '
(@ [V0GTLE MTG SUMMAF; /25/89]
l$
I ma.a. /(AM:PD II-3 L PM:PD 11-3 JHop kins D:P 11-3
/p. DMatthews N Treed:sa /
I
\ 9/ 2 /89 g/g/89 y ?/9/89 j j
L e , .
+
4 l
L,
~
cc:
G. F._Trowbridge, Esq. Mr. R. P. Mcdonald Shaw, Pittman, Potts and Trowbridge Executive Vice President -
2300 N Street, N. W. Nuclear Operations Washington, D.C. 20037 Georgia Power Company P.O. Box 1295 Mr. L. T. Gucwa Birmingham, Alabama 35201 Engineering Department Georgia Power Company Mr. Alan R. Herdt, Chief P. O. Box 129E Project Branch #3 Birmingham, Alabama 35201 U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Nuclear Safety and' Compliance Manager Atlanta, Georgia 30323 Edwin I. Hatch Nuclear Plant Georgia Power Company J. A. Bailey P. O. Box 442 Manager - Licensing Baxley, Georgia 31513 Georgia Power Company P.O. Box 1295 Mr. Louis B. Long Birmingham, Alabama 35201 Southern Company Services, Inc.
P. O. Box 1295 Bruce W. Churchill, Esq.
l- Birmingham, Alabama 35201 Thaw, Pittman, Potts and Trowbridge Resident Inspector s i g on .C. 5037 U.S. Nuclear Regulatory Commission Route 1, Box 725 Mr. G. Bockhold, Jr.
! Baxley, Georgia 31513 Geneen1 Manager, Nuclear Operations Georgia Power Company Fegional Administrator, Region 11 P.O. Box 1600 U.S. Nuclear Regulatory Commission Waynesboro, Georgia 30830 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Office of the County Commissioner Burke County Commission Mr. Charles H. Badger Waynesboro, Georgia 30830 Office of Planning and Budget Room 610 Office of Planning and Budget 270 Washington Street, S.W. Room 615B Atlanta, Georgia 30334 270 Washington Street, S.W.
Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Director Environmental Protection Division Mr. C. K. McCoy Department of Natural Resources Vice President - Nuclear EC5 Dutler Street, S.E., Suite 1252 Georgia Power Company Atlanta, Georgia 30334 P.O. Box 1295 Birmingham, Alabama 35201 Chairman Appling County Commissioners County Courthouse Baxley, Georgia 31513
n .
- . , ~.
- .
3.
- ; .i '
_y_
CC:'
. Resident Inspector
'_" Nuclear. Regulatory Conmission P.O. Box 572 Waynesboro, Georgia .30830 James E Joiner, Esq.
Troutinen, Sanders, Lockerman,
-A'Ashmore-1400 Candler Building.
-x 127 Peachtree Street, N.E.
Atlanta, Georgia 30303 Attorney General Law Department '
132 Jedicial Building Atlanta, Georgia 30323 l
l f
l l
, o
-- ' c , . -
. . s, RL ' Enclosure 1 i'
ATTENDEES NAME ORGANIZATION
. Tim Reed NRR/PD 11-3
, Jon Hopkins NRR/PD 11-3 Jim Heidt GPC Ken McCracken Southern Company Services Louis Long Southern Company Services
' Jim Eailey GPC/ Manager - Licensing J.T. Beckham, Jr. GPC Wayne Scott NRR/PQEB David Matthews NRR/D:PD 11-3 Alan Herdt NRC/RII/DRP R. A. Musser NRC/RII Leigh Trocine NRC/RII John Rogge NRC/RII/SP.I Vogtle Steve Bethey GPC Steve Tipps GPC C. Ken McCoy GPC/Vice President - t!uclear L.P. Crocker NRR/PD 11-3 J.P. l'ane GPC
___._--m_ m . ___m__. _ _ . _ _ - _ .
1 .
l -'
Enclosure 2 Georgia Power /NRC~
Regulatory Compliance Interface Meeting l
JULY 25,1989 .
Vogtle and Hatch Nuclear Plants AGENDA I 8:30 AM Opening Remarks W. G. Hairston, III -
8:45 AM SONOPCO/GPC Organization 'J. T. Beckham/
and Interface with Plants C. K. McCoy/
L. B. Long 10:15 AM Break 10:30 AM GPC Generic Activities and K. W. McCracken
. Initiatives for Vogtle and Hatch 12:00 Noon Lunch 1:00 PM GPC/NRC Regulatory Activities J. D. Heidt/
Status for Vogtle and Hatch J. A. Bailey 1
3:00 PM Sumary l l
1 1
1 i
I l
i
_ .____..__m._.___
O O O O R P R C S C D E M E R E O U O E MO P O V O B O V E N R P I R MR E R I E O E D I D L G T S S WI TI O I O E E /N TN P N R N D D A A A G T E T L T D A' NN R V E S E R P U E . A RD R L L S D F C O E O O E T A J S P N V RD E .
MO E C E V C E P L O G I T N C OM U S S T 0 P M L E ME A A O P E N T P S F R N T O R O TS R O R NJ YJ E UE O O E Q MC F N I C U AT S T E R O S S S S CP WE U T A N L E Q E C R E E S U D O T R C .
A MI T R I MC C E T N E I O D E N P M R I T A P P L N S T A R Y D I N O U R O Y P O S E N O N T G C S R A I O E S Y R N MD P D M E .
I G I E R C R N N U I O G T L F U S E I P S C S
. A N
D
L
!.l
[4 ..- -
. l TABLE OF CONTENTS fEiE .
l I
l Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 NUMARC Pri ority I ssue s . . . . . . . . . . . . . . . . . . . . . . .
External Events ...................'...... 4 5
Plcnt Life Extension and License Renewal . . . . . . . . . . . . .
10CFR50.59 Safet'y Evaluations .................. 8 10 S vere Accidents . . . . . . . . . . . . . . . . . . . . . . . . .
12 Standardization and Licensing Reform . . . . . . . . . . . . . . .
14 Sai smi c I s s ue s . . . . . . . . . . . . . . . . . . . . . . . . .
16 Anticipated Regulatory Issues . . . . . . . . . . . . . . . . . . .
17 Safety Implications of Centrol Systems . . . . . . . . . . . . . .
Radiation Effects on Reactor Vessel Supports . . . . . . . . .. 19 .
Inservice Inspection of Pressure Retaining Welds 21 in the Reactor Vessel ......................
23 Bolting Degradation or Failure . . . . . . . . . . . . . . . . . .
e
-mme%____ _ _ _ _ _ _ _ _ _ _ _ _ -
x F
U N
C T
o o o I O
N
~
AA SM P GC Ub R S ET NH O N DI -
V CA PT I IS CO . . . D E OR E SC PSC O PL R P o T RN RO oE N E ET ON J C S C GR JG E I U H AA E - C A L N RC CT TL T I DT TE I C IU R MSN A NA OM A TG L -
GL W N U S
NG AD _
EI EE G I U MN RN E E P ET E MS P RE CR E O GR OI N R EF MC T T NA P U
CC AI YE NS P YS O PP U N LO AE AI CS R NN T E NT IA Q I ON U NF ND E GO S S R C T O
G O O R V D E I R N .
N A M T E E N
T
- l\li l l
w_.,, --r --r--m-k 5
+^
' 9
]
C 2
O
==4 O M O
Z
> 'Z O M O
. HH H
<Z M >2 M>
M m cn Mm 3
m Z
' ==4 O
m MJ M
N D
3
==4 O
-r1 "O
=
==4 O ,
W "tp
Cn m
O
==4
)
w * ,
s 0
.e e-I I I g n ?
M *" $ f*
m hI l
g
."I -l 50 g !!"
F4E ig g
II E
E El I EE
[ :5X Il" i
5!
1-
!sl
.- fra en I E
.! _iss lE-o
=3I
$b ,
I-e ,
is 1
O p.'
O e
~
s l
l '
8 j t
1 I
8
'8 r
'l Tv .a E
~
,,, E V
2 .a.
a
- I F een
, ' P S #Em
?
~
f l .A . F ;!. s e ." g i ,g Fgl
.a s -
.a -
g g..- ,.-
,g , _
sf .. g -g I-llgg
it re 2 l .j ~ =[s I-g j "
n s n I sa ,v a fu :
- s
' I i , ,
?
m rf E
ig g F .* E
.arg .f Fg r ,. -
iE f: IIs ,$ s' 5" P
e-6 h%.-__
I~- , , .
I. ,e a
A h
.=, I Pg -
Er-E e
I
- X st -
i 5 5 k
I r .
.. n
- e 75 g i
[B a
g5 7- -
s i
l E I.
g 4 -
g' 9
Ils
= -
a I l
.l R --
l i I
. J l
-l
'i' il t
e m-
- - - - - - _ _ ~ _ _ _ . _ _ _ _ _
l ..
O
.I I'1 I
, :l
- lI;-l18 li R u!
I i
l
- i, n a
!! ,i,
- ilg ill .li l,r 19 s
- l I l Ip !
I i, .=
i i i a
W L
f.
4 0
l*
d.
[
N
E .
.e
'I
=_
' " e rs E!
[g a rs ya - :s i
se
'. l5 s_[
i i _-
5 il
k -
rg g
.=. e ,e ..
I ,
I { g la !
en r
P s .'
~
PE e
.~ s em ng5g E
5-eg El go g
jll E- :2 5j j ta s : I a 1 s l::
~ 1 i
1
\
O O
e ee S
l
4 e
' I I { g a " *
'b r-
'E e ' '"
f -
k'I f g
{R !a 18
% i g g* 8
=l
la a_
I I "
"E a
'*r3 s 3 -
2
.g 'r ~!" _g g
- 3. e
!g l
'* f::
.o g esa i e- ., =
"5
'a .zM E !S I
T I
9 *g q jj ::
B ,
- - 1
.= s Es=[
' ' M $.
(2
-l g n r .~ E .s ?
d ji-Q
[,E l!l sig g g Y.= a rs r .= .
.= 8 e-!
.=.=
rI
, .= m
'I hE JE s ,
1 l
l
.,m.
t
.g I
E E h E 5
ll i
l l n W
. *8I!
5 E E Ii'.i
. l i iIj, i
1 -
8
_ _ . _ ~ _ _ _ . _ - _ _ _ - - - - .
l!l I ll E
,,, e i ls et l5 gi i i
i
.. l 3 I 1ll lll l
9
O 5 .g a l'l!..I.l ,!il I
M
'Vg Illa I
stI' "s gg Isl 1i 1
i S ei 3 E E E E l '
ll, E E E E 5
ll 13 1 9l lig!1 , s 1 91 1 1
E .. .
11 lipIl 1
l1 51 -
i 9
a
l s;
. (' .s*
l~e ' ,$ '
up ..
bl 4
g 1
I Il IDI g
I II O
___m._.____._._._._______ . _ _ _ _ . _ . . _ _ _ _ _ . _ _ . _ .__ ._ _ . . . _ _ . . _ _ _ _ _ . . _ _ . _ _ _ _ _ . . _ _ _ _ . _ _ . _ . . _ . _ _ _ . . _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ . - _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ . _ . _ _ _ _ _ _ _ _
l
~ '
{
V0GTLE PROJECT >
LICENSING SUBMITTALS AWAITING NRC ACTION ,
REQUESTED GPC LETTER GPC LETTER RESPONSE SUBJECT NO. DATE DATE
- 1. Tech Spec Change Request - YL-76 11/7/88 None Containment Hydrogen Monitors ELV-00041 12/8/88 ELV-00516 5/19/89
- 2. Tech Spec Change Request - Diesel YL-110 11/7/88 None Action Requirements ELV-00517 5/19/89
- 3. Tech Spec Change Request - Deletion ELV-00302 4/5/89 None of Temporarty Footnotes 4 Tech Spec Change Request - Unit 1 ELV-00390 4/6/89 None CCP Flow
- 5. Tech Spec Change Request - Low PR7 ELV-00284 5/8/89 None Pressure TA,'I
- 6. Tech Spec Change Request - EL 00400 5/9/89 7/14/89 Containment Structural Integrity
- 7. Revision 3 to Unit 1 ISI Program MSV-00033 5/10/89 None
- 8. Q. A. Changes ELV-00518 5/18/89 None ELV-00594 6/8/89
- 9. Tech Spec Change Request - Control ELY-00491 5/19/89 None Room HVAC Exception to 3.0.4
- 10. Tech Spec Change Request - Reload ELV-00511 6/12/89 10/1/89 Fuel Enrichment
- 11. Settlement Monitoring Program ELV-00650 6/23/89 None
V0GTLE PROJECT LICENSING SUBMITTALS ANTICIPATED IN NEXT 12 MONTHS ESTIMATED ESTIMATED SUBMITTAL NEED SUBJECT DATE DATE
- 1. Revision c/ VEGP-1 IST Program 07/21/89 09/29/89
- 2. Revision of VEGP-2 IST Program 07/24/89 10/02/89
- 3. Revised Tech Spec Change Request Containment Structural Integrity 07/28/89 08/15/89
~
- 4. Tech Spec Change tc Heat Up and 07/31/89 N. A.
Cool Down Curves S. RAI cn Proposed 08/01/89 N. A.
Change To RTB Maintenance Frequency
- 6. Revision of VEGP-2 ISI Program 08/04/89 11/03/89
- 7. Tech Spec Changas to Mitigate 08/05/89 N. A.
Control Rod Wear
- 8. Security Plan An.endnent 13 - 10 CFR 50.54(p) 08/25/89 N.A.
Change Incorporating Alternate PESB.
9.- GMR-1 Cannister Exemption Request; also 09/15/89 12/01/89 Request to Change Circuit A to Circuit l C Storage
- 10. Tech Spec Change to Unit 2 Unit 2 Moderator Temperature Coefficient 09/15/89 Cycle 2
- 11. Mild Environmental Qualification Position 11/01/89 Before Paper Refueling
- 12. Results of First Vessel Capsule 11/10/89 Surveillance
- 13. Tech Spec Change to End-of-Life 11/15/89 N. A.
MTC l
l L - _----__- - - _ _-- _ ____ _ _ _ _ _ _ _
7 r.,'
e-i
.,o e.
t YOGTLE PROJECT 1 LICENSING SUBMITTALS ANTICIPATED IN NEXT 12 MONTHS (CONTINUED)
-]
ESTIMATED ESTIMATED i
Sl4BMITTAL NEED SUBJECT DATE DATE
- 14. Tech Spec Change to Incorporate 12/15/89 N. A. l Standard Westinghouse Precaution I for Fuel Assembly Reconstitution {
1S. Response to Generic Letter on M0V's 01 /01 /9 0 03/01/90
- 16. Tech S'pec Change to Base Shutdown Unavailable N. A.
Margin Curves on Critical Boron ;
Concentration
- 17. Tech Spec Change to Remove Specific Unavailable N. A.
References to Grid Locations for Fxy Surveillance Exclusion
- 18. Tech Spec Change Concerning Unavailable Spring Temporary Opening of Locked 1990 Valves in Mode 6
- 19. RTD Bypass Removal 01/15/90 06/15/90 i
LICENSING SUBMITTALS ANTICIPATED BEYOND NEXT YEAR l i
- 1. Re-analyses and Tech Spec Changes 09/15/90 10/15/90 4 Associated With VANTAGE 5 Fuel )