Forwards Insp Repts 50-313/88-01 & 50-368/88-01 on 880120- 0221 & Notice of Violation
ML20196H795
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/07/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20196H801 List:
References
NUDOCS 8803140063
Download: ML20196H795 (2)


See also: IR 05000313/1988001

Text

._

.

.

,

.

.

'

In Reply Refer To:

Dockets: 50-313/88-01 t&R 7 lggg

50-368/88-01

Arkansas Power & Light Company

ATTN: Gene Campbell, Vice President -

Nuclear Operations

P.O. Box 551 \

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. W. D. Johnson and

C. C. Harbuck of this office during the period January 20 through February 21,

1988, of activities authorized by NRC Operating Licenses OPR-51 and NPF-6 for

Arkansas Nuclear One, Units 1 and 2, and to the discussion of our findings with

Mr. S. M. Quennoz and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included operational safety verification, i

maintenance, surveillance, followup on a previously identified item, followup 1

on TMI Action Plan Item, and followup on generic letters. Within these areas, '

the inspection consisted of selective examination of procedures and

representative records, irterviews with personnel, and observations by the NRC

inspectors. The findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of yuur activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the s,.)cifics contained in the

Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

RIV:D / SRI DRP/A(Acting) ORP%

WDJohpson:gb PEFarrell LJCallan

3//p/88 ]/p88 /q/88

8803140063 680307

FDR ADOCK 05000313

O DCD \

_

,. .

'

4

' Arkansas Power & Light Company -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

L. J. allan, Director

Divis n of Reactor Projects

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-313/88-01

50-368/88-01

cc w/ enclosures:

Arkansas Nuclear One

ATTN: J. M. Levine, Executive Director

ANO Site Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec to DMB (IE01)

r

bec distrib. by RIV:

  • RRI Robert D. Martin, RA

RPSB-DRSS *Section Chief (DRP/A) ,

  • Lisa Shea, RM/ALF *RIV File
  • 0PR * MIS System
  • RSTS Operator * Project Engineer, DRP/A

'

  • G. Dick, NRR Project Manager *R. Hall

"0RS *TSS

  • w/766