ML20196H795
| ML20196H795 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/07/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20196H801 | List: |
| References | |
| NUDOCS 8803140063 | |
| Download: ML20196H795 (2) | |
See also: IR 05000313/1988001
Text
._
.
.
,
.
.
'
In Reply Refer To:
Dockets: 50-313/88-01
t&R
7 lggg
50-368/88-01
Arkansas Power & Light Company
ATTN:
Gene Campbell, Vice President -
Nuclear Operations
\\
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. W. D. Johnson and
C. C. Harbuck of this office during the period January 20 through February 21,
1988, of activities authorized by NRC Operating Licenses OPR-51 and NPF-6 for
Arkansas Nuclear One, Units 1 and 2, and to the discussion of our findings with
Mr. S. M. Quennoz and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included operational safety verification,
i
maintenance, surveillance, followup on a previously identified item, followup
1
on TMI Action Plan Item, and followup on generic letters. Within these areas,
'
the inspection consisted of selective examination of procedures and
representative records, irterviews with personnel, and observations by the NRC
inspectors. The findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of yuur activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the s,.)cifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
RIV:D / SRI
DRP/A(Acting)
ORP%
WDJohpson:gb
PEFarrell
LJCallan
3//p/88
]/p88
/q/88
8803140063 680307
FDR
ADOCK 05000313
\\
O
_
,.
.
'
4
' Arkansas Power & Light Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
L. J.
allan, Director
Divis n of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/88-01
50-368/88-01
cc w/ enclosures:
Arkansas Nuclear One
ATTN:
J. M. Levine, Executive Director
ANO Site Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
r
bec distrib. by RIV:
- RRI
Robert D. Martin, RA
RPSB-DRSS
- Section Chief (DRP/A)
,
- Lisa Shea, RM/ALF
- RIV File
- 0PR
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
'
- G. Dick, NRR Project Manager
- R. Hall
"0RS
- TSS
- w/766