Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 4 to M-10 Re Fire Protection of Safe Shutdown Equipment.Related Correspondence
ML20198C445
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/08/1985
From: Shiffer J
PACIFIC GAS & ELECTRIC CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20198C448 List:
References
CON-#485-247 DCL-85-264, OL, NUDOCS 8511120095
Download: ML20198C445 (2)


Text

bY CoF" "" -

PACIFIC OAS AND E LE C T RIC C O M PANY /

pg 3 ,

77 BEALE STREET. SAN FR ANCISCO, C AllFOR NI A 94!06 Q t.L (4'*) 781 42:1 August 8,1985 15 AUG 16 20:46 PGandELetterNo.y0 #04;U i

BRANCH Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission, Region Y 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368

--.....m 9, .

g .v(_

Re: Docket No. 50-275, OL-DPR-80 EL-" - 3 - - -

Docket No. 50-323, OL-DPR-81 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedure Updates

Dear Mr. Martin:

In accordance with Section Y, " Implementing Procedures," of 10 CFR 50, Appendix E. PGandE is submitting one copy of the updates to the detailed Implementing Procedures (Enclosure 3) for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan. These updates are listed in Enclosure 1. Concurrently, two copies of each update are being submitted to the Document Control Desk.

Some of the updates contain privacy / proprietary information. This privacy /

proprietary information has been bracketed in accordance with NRC Generic Letter 81-27 and is identified in Enclosure 2.

Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

Sincerely, OtlGINAL SIGNED BY J. D. Shiffer Enclosures (3) cc: R. T. Dodds R. Fish Document Control Desk (2)

Service List cc w/o Enc 3: G. W. Knighton

%,tmudb .

F

PGandE Letter Ns.: DCL-85-264

)

ENCLOSURE 3 Updates to Diablo Canyon

~

Emergency Plan Implementing Procedures o

I 4

w 0502d/0005K