Monthly Operating Repts for Oct 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2
ML20199D080
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/31/1997
From: Katz P, Olsen H
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9711200246
Download: ML20199D080 (7)


Text

. .__________ - ___ -______ _______-_ _

?

PETon E. K4Tr B:.ltimore Gr.s and Electric Company Plant G-neral Manager Calven Cliffs Nuclear Power Plant

. Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495 4101 November 14,1997 U. S. Nuclear Regulatory Commission Washington, t>J 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvt rt ClilTs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 October 1997 Onerating Data Renorts The subject reports are being sent to you as required by Technical Specification 6.6.4.

Shoula you have any questions, please contact Mr. Bruce B. Mrowca at (410) 495-3989.

Very taily yours, .

,tc~ f '

3 PEK/llOO/dtm Attachments -

cc: R. S. Fleishman, Esquire Resident inspector,NRC J. E. Silberg, Esquire R.1. McLean, DNR A. W. Dromerick, NRC J.11. Walter, PSC Director, Project Directorate 1-1, NRC

11. J. Miller, NRC P. Lewis, INPO K.N. Larson, ANI ,lj
  1. hl

_J

(

9711200246 971031 PDR ADOCK 05000317; R PDR ,

1 L A g' c r au s w .a i

l .

I QPERATING DATA REPORT

        • ................** .................. ............ ............. .............. i Docket No. 50-317 Calvert Cliffs Unit 1 November 14, 1997 Prepared by Herman O. Olsen Telephone s (410) 4 95-6734 REPORTING PERIOD OCTOBER 1997 DESIGN ELECTRICAL RATING (NET MWe) 845 MAXIMUM DEPENDABLE CAP'Y inst MWe) 835 Year- Cumulative This month to-Date to Date
1. NUMuER OF HOURS REACTOR WAS CRITICAL 715.2 6,996.6 144,292.1
2. HOURS GENERATOR ON LINE 705.9 6,939.0 141,425.9
3. UNIT RESERVE SHUTtWWN HOURS 0.0 0.0 0.0
4. NET ELECTRICAL ENERGY GENERATED (MWH) 598,143 5,894,709 114,241,901 l

inr s - .

}

UNIT SHUTDOWNS AND POWER REDUCHONS -

l

DOCKET NO.' 50-317 ,!

. UNIT NAME Calvert ClitTs - U1 '

DATE b'ovember 14.1997 COMPLETED BY liermm O. OLwn  ;

~

TELEPIIONE --(4101493-6734 _.

" REPORTING MONTH October 1997 i

NO. .DATE

TYPE DURATION REASON' MET 110D OF CAUSE/CORRECrlVEACTIONS -

F: FORCED (llOURS) . SilUTTING  !

S: SCllEDULED DOWN' ' COMMENTS  ;97-004 97/10/24 F" 39.1 B 3 An automatic reactor trip occurred at 0917 on 10/2467 due to a tur'rine trip that was caused by a loss of L condenser vacuum. Trouble shooting identiFed that the j

vacuum breaker valve had opened due to an improperly -

terminated wire in the vacuum breaker handswitch. . The handswitch was correctly reassembled. Approximately 200 additional similar connections were inspected but no simi*ar deficiencies were noted. This event was assigned as LER 97-009. ,

i i

i

+

a .

' 2 Re wn: "

Method. .

A - Equipment Failure 1 - Manual  !

B - Maintenance or Test 2 - Manual Scram. ,

C - Refueling . 3 - Autoinatic Scram 5

' D - Regulatory Restriction 4 - Continued 4

E - Operator Training & License Examina: ion 5 - Other

. F- Administrative  !

G - Operational Error j II - Other

,h y

t DOCKET NO. 50-317 - _ .

. CALVERT CLIFFS - UNIT 1

, November 14;1997

SUMMARY

OF OPERATING EXPERIENCE October 1997 1he unit began the month at 100% power.: -

- On 10/24/97 at 0917 an automatic reactor trip occurred due to 'a Main Turbine trip. The Main Turbine tripped due to a loss of condenser vacuum. Trouble shooting identiDed that a loose wire strand in the -

__ vacuum breaker valve handswitch shorted and caused the vacuum breaker valve to go fully open.

Repairs were made to the handswitch and following inspection of similar connections, the er.it was restored to critical operation. The unit was paralleled to the grid on 10/26/97 at 0026 and reached 100%

power at 1100.

The unit operated at 100% power for the remainder of the month.

1 6

A

. _a -- __ --.--,a- -- -------n------

. . ,_ _ ._ . , _ . -. __... . _ , _ _ . - . . ,_.. . . _ .- ~. _- - . _ - . .

t .'

~e*******een*****.eeeeee**eee***ee.....**************e.******s*oe***********-

? OPERATING DATA REPORT O .******,*********ee********ee............**.....e***************e..***e***ee-Docket No. 50-318 Calvert Cliffs Unit 2 -

November 14,,1997-Prepared by Herman O.~Olsen Telephone s (410) 495-6734 REPORTING PERIOD- OCTOBER 1997 i DESIGN ELECTRICAL RATING (NET MWe) 845 ,

MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 Year- Cumulative.

This month- to-Date to Date

1. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 5,684.1 135,526.r
2. HOURS -GENERATOR ON LINE 745.0 5,637.1 133,772.1
3. UNIT RESERVE SHUTDOWN HOURS 0.0 - 0. 0 0.0

' 4. NET ELECTRICAL ENERGY GENEPATED(MWH) 640,346 4,700,217 108,677,400 a

y'_

+

4 9 e f M f ~w- g- m V v c- -i--rw-# w- r,tym- - ,-

g. ,

s t - ,

,.- p' ~ . ,

-  : UNIT SHITfDOWNS AND POWER REDUCTIONS ' '- -

  • ~

MET NO.- ' [)-318 ' ' ' ~

UNIT NAME'  : Calvert ClafB-U2 - ~~

iit a. M 14.1997

^

DATEp COMPLETED BY- ' Herman O. Obeo '

- TELEPHONE ^ (410) 495-6734

. .k}l" REPORTMONTH October 199"I .-

4 i

^ .' NO. ' ' DATE. . TYPE DURATION REASON' METHOD OF- - CAUSE/ CORRECTIVE ACTIONS _,

F: FORCED- . ' (IIOURS) ' SHUTTING 2'

Si ' SCilEDULED .DOWN COMMENTS There were no significant power reductions this month.

4 1

.N' ,

i

8 '- Reason
.2

. Method:- ~

L A - Equipment Failure I - Manual B - Maintenance or Test 2 - Manual Scram. ,

Ci efueling R 3 - Automatic Scram.

j- D- Rsgulatory Restriction 4 - Continued ....

. E- Operator Training & License Examination 5 - Otlwr

{. F- Administrative

! G - Operational Error 11 - Other .

l- .

t

4 DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 November 14,1997

SUMMARY

OF OPERATING EXPERIENCE October 1997

) The unit operated at 100% for the entire month.

_____ sur