ML20196A637

From kanterella
Revision as of 11:17, 13 November 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 19 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) & 73.21
ML20196A637
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 06/15/1999
From: Blind A
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9906220269
Download: ML20196A637 (2)


Text

p

. A. Alan Blind ves Pree.oent Consolidated Edison Company of New Y&k. inc.

indan Pod State 8'

% 'd*g'ny 9 'dt ^****

Telephone (914) 734-534o Re: Indian Point Unit No.1 and No. 2 h*2Mega s Docket No. 50-03 and No. 50-247 l l

Document Control Desk US Nuclear Regulatory Commission Mail Station Pl-137 Washington, DC 20555

SUBJECT:

Indian Point Units No. I and 2 Physical Security Plan - Revision 19 l

Pursuant to the provisions of 10 CFR 50.54(p)(2), enclosed are pages for controlled copies of Revision No.19 to the Indian Point Units No. I and 2 Physical Security Plan.

We have determined that the changes do not decrease the safeguards effectiveness of the Physical Security Plan for Indian Point Unit I and Unit 2. i in accordance with 10 CFR Sections 2.790(d) and 73.21, correspondence and reports to and from the NRC that identify a licensee's control of and detailed security measures for, the physical protection of a licensed facility are exempt t~ rom public disclosure. We understand, therefore, that the enclosure to this letter will not be placed in the Public Document Room and will receive limited distribution.

Should you or your staff have any questions regarding this matter, please contact Mr. John McCann, Manager, Nuclear Safety and Licensing.

Very truly yours, i

4/

Enclosure

.A 9906220269 990615 PDR ADOCK 05000003 F PDR l N(

@ l ENCLOSURE CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION Tills PAGE IS DECONTROLLED

p-cc: Mr. Hubert J. Miller Regional Administrator- Region i US Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector US Nuclear Regulatory Commission l PO Box 38 Buchanan,NY 10511 Mr. Jefferey F. Harold, Project Manager (w/o enclosure)

Project Directorate 1-1 Division of Reactor Projects I/II l

US Nuclear Regulatory Commission Mail Stop 14B 2 l Washington, DC 20555 l 1

l i

l l

l i

ENCLOSURE CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED