ML20151W401

From kanterella
Revision as of 13:51, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrected Page to MOR for April 1998 for Pbnp Unit 2
ML20151W401
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/30/1998
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20151W381 List:
References
NUDOCS 9809150304
Download: ML20151W401 (1)


Text

+

^

GH OPERATING DATA REPORT DOCKET NO. 50-301 '

E8 3

  • 8 E8 n

(14 OPERATING STATUS h8 U l. UNIT NAME POINT BEACil NUCLEAR PLANT - UNIT 2 NOTES

2. REPORTING PERIOD. April- 1998 be 3. LICENSED TiiERMAL POWER (MWT): 1,518.5
4. NAMFPLATING RATING (GROSS MWE): 523.8

' 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0

6. MAXIMUM DEPENDABG CAPACITY (GROSS MWE): 509.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
8. IF CllANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 TilROUGil 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WilICII RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS,(IF ANY):

NA'

  • TilIS MONTil YEAR TO DATE CUMULATIVE
11. IlOURS IN REPORTING PERIOD 719.0 2,879.0 225,696.0
12. NUMBER OFllOURS REACTOR WAS CRITICAL 719.0 1,422.9 189,307.9
13. REACTOR RESERVE S11UTDOWN IlOURS 0.0 0.0 233.9
14. IlOURS GENERATOR ONLINE 719.0 1,377.0 186,673.8
15. UNIT RESERVE SilUTDOWN llOURS 0.0 0.0 302.2 ,

'6. GROSS TIIERMAL ENERGY GENERATED (MWII) 1,090,411.0 2,042,258.0 268,218,206.0

17. GROSS ELECTRICAL ENERGY GENERATED 375,850.0 700,760.0 91,180,310.0

< 18. NET ELECTRICAL ENERGY GENERATED (MWil) 359,770.0 661,545.5 86,882,306.5 .

19. UNIT SERVICE FACTOR 100.0 % 47.8 % 82.7 %
20. UNIT AVAILABILITY FACTOR 100.0 % 47.8 % 82.8 %
21. UNIT CAPACITY FACTOR (USING MDC UET) 103.2 % 47A% 78.9 %
22. UNIT CAPACITY FACTOR (USING DER NET) 100.7 % 46.2 % 77.5 %
23. UNIT FORCED OUTAGE RATE 0.0% 52.2 % 2.4 %
24. S11UTDOWNS SCIIEDULED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACll):

Refueling 9/19/98 60 days

25. IF SilUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA  :

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEI'TEMBER 22,1977 l

._- _ _ _ _ - - _ ___ _ ________- ___ _ __- -__-____