Category:INSPECTION REPORT
MONTHYEARIR 05000352/19990051999-09-16016 September 1999 Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000352/19990041999-08-10010 August 1999 Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Engineering & Maint IR 05000352/19990031999-06-24024 June 1999 Insp Repts 50-352/99-03 & 50-353/99-03 on 990413-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Inspected, Radiological Protection,Security & Inservice Insp IR 05000352/19990021999-05-0707 May 1999 Insp Repts 50-352/99-02 & 50-353/99-02 on 990302-0412. Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000352/19990011999-03-26026 March 1999 Insp Repts 50-352/99-01 & 50-353/99-01 on 990112-0301. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20199C6641999-01-0606 January 1999 Insp Repts 50-352/98-09 & 50-353/98-09 on 981018-1130. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196C3371998-11-23023 November 1998 Insp Repts 50-352/98-08 & 50-353/98-08 on 980901-1017.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support.Security & Safeguards Activities Were Conducted in Manner That Protected Public Health IR 05000352/19980071998-09-25025 September 1998 Insp Repts 50-352/98-07 & 50-353/98-07 on 980707-0831.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000352/19980051998-08-0707 August 1998 Insp Repts 50-352/98-05 & 50-353/98-05 on 980601-24. Violations Noted.Major Areas Inspected:Backlogged Engineering Activities IR 05000352/19980041998-08-0505 August 1998 Insp Repts 50-352/98-04 & 50-353/98-04 on 980519-0706. Violations Noted.Major Areas Inspected:Aspects of PECO Energy Operations,Engineering & Maint IR 05000352/19980031998-06-18018 June 1998 Insp Repts 50-352/98-03 & 50-353/98-03 on 980317-0518. Violations Noted.Major Areas Inspected:Aspects of PECO Energy Operations,Engineering,Maint & Plant Support ML20247J2451998-05-11011 May 1998 Insp Repts 50-352/98-02 & 50-353/98-02 on 980120-0316. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000353/19970091998-03-11011 March 1998 Insp Rept 50-353/97-09 on 971010-980116.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20203G9211998-02-23023 February 1998 Insp Repts 50-352/97-10 & 50-353/97-10 on 971118-980119. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000352/19970081997-12-0808 December 1997 Insp Repts 50-352/97-08 & 50-353/97-08 on 970916-1117.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198N1771997-10-27027 October 1997 Insp Repts 50-352/97-07 & 50-353/97-07 on 970722-0915. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000352/19970061997-08-13013 August 1997 Insp Repts 50-352/97-06 & 50-353/97-06 on 970528-0721. Violations Noted.Major Areas Inspected:Peco Energy Operations,Engineering,Maintenance & Plant Support IR 05000352/19970051997-07-31031 July 1997 Insp Repts 50-352/97-05 & 50-353/97-05 on 970623-26.No Violations Noted.Major Areas Inspected:Licensee Performance During Biennial full-participation EP Exercise IR 05000352/19970031997-07-11011 July 1997 Insp Repts 50-352/97-03 & 50-353/97-03 on 970330-0527. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000352/19970011997-05-0707 May 1997 Insp Repts 50-352/97-01 & 50-353/97-01 on 970204-0329. Violations Noted.Major Areas Inspected:Operations, Engineering,Plant Support & Maintenance ML20136C0951997-03-0606 March 1997 Insp Repts 50-352/96-10 & 50-353/96-10 on 961217-970203. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20133H7391997-01-0909 January 1997 Insp Repts 50-352/96-09 & 50-353/96-09 on 961022-1216. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20132G4901996-12-20020 December 1996 Insp Repts 50-277/96-11,50-278/96-11,50-352/96-08 & 50-353/96-08 on 961003-1127.No Violations Noted.Major Areas Inspected:Documentations Containing Safeguards Info IR 05000352/19960071996-11-15015 November 1996 Insp Repts 50-352/96-07 & 50-353/96-07 on 960827-1021. Violations Noted.Major Areas Inspected:Conduct of Operations,Operational Status of Facilities & Equipment & Operations Procedures & Documentation IR 05000352/19950191996-02-0909 February 1996 Insp Repts 50-352/95-19 & 50-353/95-19 on 951120-1201. No Violations Noted.Major Areas Inspected:Program Implementation,Status & Scope,Operating Sizing & Settings IR 05000352/19940231994-11-10010 November 1994 Insp Repts 50-352/94-23 & 50-353/94-23 on 940927-1031. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance,Engineering,Plant Support & Safety Assessment & Quality Verification IR 05000352/19930311993-12-30030 December 1993 Insp Repts 50-352/93-31 & 50-353/93-31 on 931201.No Violations Noted.Major Areas Inspected:Protected Area Physical Barriers & Detection Aids IR 05000352/19930291993-12-22022 December 1993 Insp Repts 50-352/93-29 & 50-353/93-29 on 931102-1213.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering,Plant Support & Review of Licensee Event & Routine Repts IR 05000352/19930271993-11-29029 November 1993 Insp Repts 50-352/93-27 & 50-353/93-27 on 931101-05.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training Program IR 05000352/19930261993-11-19019 November 1993 Insp Repts 50-352/93-26 & 50-353/93-26 on 931004-08.No Violations Noted.Major Areas Inspected:Review of Licensee Corrective Actions of Nine Previously Identified Edsfi Findings Including Escalated Enforcement Item IR 05000352/19930191993-11-10010 November 1993 Insp Repts 50-352/93-19 & 50-353/93-19 on 930928-30.No Weaknesses Noted.Major Areas Inspected:Annual full- Participation Emergency Preparedness Exercise IR 05000352/19930251993-11-0808 November 1993 Insp Repts 50-352/93-25 & 50-353/93-25 on 930926-1101. Enforcement Discretion Exercised Re Missed Firewatch.Major Areas Inspected:Plant Operations,Maint,Surveillance,Plant Support & LER Re Missed Firewatch IR 05000352/19930241993-11-0101 November 1993 Insp Repts 50-352/93-24 & 50-353/93-24 on 930908-14.No Violations Noted.Major Areas Inspected:Reviewed Causes Leading to Loss of One Offsite Electrical Power Source & Subsequent Reactor Scram at Plant IR 05000352/19930231993-10-25025 October 1993 Insp Repts 50-352/93-23 & 50-353/93-23 on 930907-14. No Violations Noted.Major Areas Inspected:Radiological Controls Program Enhancements,Qa Oversight Activities & Contamination Control Program IR 05000352/19930221993-10-13013 October 1993 Insp Repts 50-352/93-22 & 50-353/93-22 on 930817-0925. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance & Engineering & Technical Support IR 05000352/19930201993-09-0909 September 1993 Insp Repts 50-352/93-20 & 50-353/93-20 on 930816-20.No Violations Noted.Major Areas Inspected:Technical Support of Plant Operations,Configuration Mgt,Pep,Esw & Residual Improvement Programs IR 05000352/19930111993-08-27027 August 1993 Insp Repts 50-352/93-11 & 50-353/93-11 on 930524-27.No Violations Noted.Major Areas Inspected:Changes to Emergency Plan & Implementing Procedures;Emergency Facilities, Equipment,Instrumentation & Supplies IR 05000352/19930101993-08-13013 August 1993 Erratum to Insp Repts 50-352/93-10 & 50-353/93-10 IR 05000352/19930171993-08-0202 August 1993 Insp Repts 50-352/93-17 & 50-353/93-17 on 930706-09.Two Unresolved Items Identified.Major Areas Inspected:Storage, Radioactive Waste Handling,Processing & Transportation Programs IR 05000352/19930011993-02-0404 February 1993 Insp Repts 50-352/93-01 & 50-353/93-01 on 930111-15.No Violations Noted.Major Areas Inspected:Radiological & non-radiological Chemistry Programs,Including Confirmatory Measurements IR 05000352/19920291993-01-27027 January 1993 Insp Repts 50-352/92-29 & 50-353/92-29 on 921115-930102. Noncited Violations Noted.Major Areas inspected:921204 Reactor Trip & Maint Efforts to Return Unit to Svc IR 05000352/19920301992-12-30030 December 1992 Insp Repts 50-352/92-30 & 50-353/92-30 on 921130-1204.No Violations Noted.Major Areas Inspected:Design Mods, Experience & Professional Proficiency of Engineering Staff Engaged in Design Mods IR 05000277/19920331992-12-11011 December 1992 Corrected Insp Repts 50-277/92-33,50-278/92-33,50-352/92-28 50-353/92-28 on 921123-25.Previously Missing Line from Page 8 of Original Rept Appears at Top of Page 9 ML20127F2831992-12-11011 December 1992 Insp Repts 50-277/92-33,50-278/92-33,50-352/92-28 & 50-353/92-28 on 921123-25.No Violations Noted.Major Areas Inspected:Annual partial-participation Exercise Conducted on 921124 IR 05000352/19920271992-12-0707 December 1992 Insp Repts 50-352/92-27 & 50-353/92-27 on 921004-1114. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Maintenance,Engineering & Technical Support & Safety Assessment & Quality Verification IR 05000352/19920811992-12-0404 December 1992 Edsfi Repts 50-352/92-81 & 50-353/92-81 on Stated Date. Violations Noted.Major Areas Inspected:Review of Functionality of Electrical Distribution Sys IR 05000352/19920141992-05-0606 May 1992 Insp Repts 50-352/92-14 & 50-353/92-14 on 920420-24. Violations Noted.Major Areas Inspected:Review of Status of Radioactive Material,Staffing & Qualifications of Contractor Technicians,Alara & Tours of Radiological Controls Area IR 05000352/19900211990-11-15015 November 1990 Insp Repts 50-352/90-21 & 50-353/90-20 on 900827-31.No Violations Noted.Major Areas Inspected:Emeergency Preparedness Program IR 05000352/19900241990-10-26026 October 1990 Radiological Safety Insp Rept 50-352/90-24 & 50-353/90-23 on 901001-05.No Violations Noted.Major Areas Inspected: Radiological Safety Insp of Licensee Radiological Controls Program IR 05000352/19900221990-10-18018 October 1990 Insp Repts 50-352/90-22 & 50-353/90-21 on 900912-19.No Violations Noted.Major Areas Inspected:Engineering Organization,Staffing,Communications,Mgt Support,Design Changes & Mod Process 1999-09-16
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000352/19990051999-09-16016 September 1999 Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000352/19990041999-08-10010 August 1999 Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Engineering & Maint IR 05000352/19990031999-06-24024 June 1999 Insp Repts 50-352/99-03 & 50-353/99-03 on 990413-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Inspected, Radiological Protection,Security & Inservice Insp IR 05000352/19990021999-05-0707 May 1999 Insp Repts 50-352/99-02 & 50-353/99-02 on 990302-0412. Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000352/19990011999-03-26026 March 1999 Insp Repts 50-352/99-01 & 50-353/99-01 on 990112-0301. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20199C6641999-01-0606 January 1999 Insp Repts 50-352/98-09 & 50-353/98-09 on 981018-1130. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196C3371998-11-23023 November 1998 Insp Repts 50-352/98-08 & 50-353/98-08 on 980901-1017.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support.Security & Safeguards Activities Were Conducted in Manner That Protected Public Health IR 05000352/19980071998-09-25025 September 1998 Insp Repts 50-352/98-07 & 50-353/98-07 on 980707-0831.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000352/19980051998-08-0707 August 1998 Insp Repts 50-352/98-05 & 50-353/98-05 on 980601-24. Violations Noted.Major Areas Inspected:Backlogged Engineering Activities IR 05000352/19980041998-08-0505 August 1998 Insp Repts 50-352/98-04 & 50-353/98-04 on 980519-0706. Violations Noted.Major Areas Inspected:Aspects of PECO Energy Operations,Engineering & Maint IR 05000352/19980031998-06-18018 June 1998 Insp Repts 50-352/98-03 & 50-353/98-03 on 980317-0518. Violations Noted.Major Areas Inspected:Aspects of PECO Energy Operations,Engineering,Maint & Plant Support ML20247J2451998-05-11011 May 1998 Insp Repts 50-352/98-02 & 50-353/98-02 on 980120-0316. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000353/19970091998-03-11011 March 1998 Insp Rept 50-353/97-09 on 971010-980116.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20203G9211998-02-23023 February 1998 Insp Repts 50-352/97-10 & 50-353/97-10 on 971118-980119. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000352/19970081997-12-0808 December 1997 Insp Repts 50-352/97-08 & 50-353/97-08 on 970916-1117.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198N1771997-10-27027 October 1997 Insp Repts 50-352/97-07 & 50-353/97-07 on 970722-0915. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000352/19970061997-08-13013 August 1997 Insp Repts 50-352/97-06 & 50-353/97-06 on 970528-0721. Violations Noted.Major Areas Inspected:Peco Energy Operations,Engineering,Maintenance & Plant Support IR 05000352/19970051997-07-31031 July 1997 Insp Repts 50-352/97-05 & 50-353/97-05 on 970623-26.No Violations Noted.Major Areas Inspected:Licensee Performance During Biennial full-participation EP Exercise IR 05000352/19970031997-07-11011 July 1997 Insp Repts 50-352/97-03 & 50-353/97-03 on 970330-0527. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000352/19970011997-05-0707 May 1997 Insp Repts 50-352/97-01 & 50-353/97-01 on 970204-0329. Violations Noted.Major Areas Inspected:Operations, Engineering,Plant Support & Maintenance ML20136C0951997-03-0606 March 1997 Insp Repts 50-352/96-10 & 50-353/96-10 on 961217-970203. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20133H7391997-01-0909 January 1997 Insp Repts 50-352/96-09 & 50-353/96-09 on 961022-1216. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20132G4901996-12-20020 December 1996 Insp Repts 50-277/96-11,50-278/96-11,50-352/96-08 & 50-353/96-08 on 961003-1127.No Violations Noted.Major Areas Inspected:Documentations Containing Safeguards Info IR 05000352/19960071996-11-15015 November 1996 Insp Repts 50-352/96-07 & 50-353/96-07 on 960827-1021. Violations Noted.Major Areas Inspected:Conduct of Operations,Operational Status of Facilities & Equipment & Operations Procedures & Documentation IR 05000352/19950191996-02-0909 February 1996 Insp Repts 50-352/95-19 & 50-353/95-19 on 951120-1201. No Violations Noted.Major Areas Inspected:Program Implementation,Status & Scope,Operating Sizing & Settings IR 05000352/19940231994-11-10010 November 1994 Insp Repts 50-352/94-23 & 50-353/94-23 on 940927-1031. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance,Engineering,Plant Support & Safety Assessment & Quality Verification IR 05000352/19930311993-12-30030 December 1993 Insp Repts 50-352/93-31 & 50-353/93-31 on 931201.No Violations Noted.Major Areas Inspected:Protected Area Physical Barriers & Detection Aids IR 05000352/19930291993-12-22022 December 1993 Insp Repts 50-352/93-29 & 50-353/93-29 on 931102-1213.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering,Plant Support & Review of Licensee Event & Routine Repts IR 05000352/19930271993-11-29029 November 1993 Insp Repts 50-352/93-27 & 50-353/93-27 on 931101-05.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training Program IR 05000352/19930261993-11-19019 November 1993 Insp Repts 50-352/93-26 & 50-353/93-26 on 931004-08.No Violations Noted.Major Areas Inspected:Review of Licensee Corrective Actions of Nine Previously Identified Edsfi Findings Including Escalated Enforcement Item IR 05000352/19930191993-11-10010 November 1993 Insp Repts 50-352/93-19 & 50-353/93-19 on 930928-30.No Weaknesses Noted.Major Areas Inspected:Annual full- Participation Emergency Preparedness Exercise IR 05000352/19930251993-11-0808 November 1993 Insp Repts 50-352/93-25 & 50-353/93-25 on 930926-1101. Enforcement Discretion Exercised Re Missed Firewatch.Major Areas Inspected:Plant Operations,Maint,Surveillance,Plant Support & LER Re Missed Firewatch IR 05000352/19930241993-11-0101 November 1993 Insp Repts 50-352/93-24 & 50-353/93-24 on 930908-14.No Violations Noted.Major Areas Inspected:Reviewed Causes Leading to Loss of One Offsite Electrical Power Source & Subsequent Reactor Scram at Plant IR 05000352/19930231993-10-25025 October 1993 Insp Repts 50-352/93-23 & 50-353/93-23 on 930907-14. No Violations Noted.Major Areas Inspected:Radiological Controls Program Enhancements,Qa Oversight Activities & Contamination Control Program IR 05000352/19930221993-10-13013 October 1993 Insp Repts 50-352/93-22 & 50-353/93-22 on 930817-0925. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance & Engineering & Technical Support IR 05000352/19930201993-09-0909 September 1993 Insp Repts 50-352/93-20 & 50-353/93-20 on 930816-20.No Violations Noted.Major Areas Inspected:Technical Support of Plant Operations,Configuration Mgt,Pep,Esw & Residual Improvement Programs IR 05000352/19930111993-08-27027 August 1993 Insp Repts 50-352/93-11 & 50-353/93-11 on 930524-27.No Violations Noted.Major Areas Inspected:Changes to Emergency Plan & Implementing Procedures;Emergency Facilities, Equipment,Instrumentation & Supplies IR 05000352/19930101993-08-13013 August 1993 Erratum to Insp Repts 50-352/93-10 & 50-353/93-10 IR 05000352/19930171993-08-0202 August 1993 Insp Repts 50-352/93-17 & 50-353/93-17 on 930706-09.Two Unresolved Items Identified.Major Areas Inspected:Storage, Radioactive Waste Handling,Processing & Transportation Programs IR 05000352/19930011993-02-0404 February 1993 Insp Repts 50-352/93-01 & 50-353/93-01 on 930111-15.No Violations Noted.Major Areas Inspected:Radiological & non-radiological Chemistry Programs,Including Confirmatory Measurements IR 05000352/19920291993-01-27027 January 1993 Insp Repts 50-352/92-29 & 50-353/92-29 on 921115-930102. Noncited Violations Noted.Major Areas inspected:921204 Reactor Trip & Maint Efforts to Return Unit to Svc IR 05000352/19920301992-12-30030 December 1992 Insp Repts 50-352/92-30 & 50-353/92-30 on 921130-1204.No Violations Noted.Major Areas Inspected:Design Mods, Experience & Professional Proficiency of Engineering Staff Engaged in Design Mods IR 05000277/19920331992-12-11011 December 1992 Corrected Insp Repts 50-277/92-33,50-278/92-33,50-352/92-28 50-353/92-28 on 921123-25.Previously Missing Line from Page 8 of Original Rept Appears at Top of Page 9 ML20127F2831992-12-11011 December 1992 Insp Repts 50-277/92-33,50-278/92-33,50-352/92-28 & 50-353/92-28 on 921123-25.No Violations Noted.Major Areas Inspected:Annual partial-participation Exercise Conducted on 921124 IR 05000352/19920271992-12-0707 December 1992 Insp Repts 50-352/92-27 & 50-353/92-27 on 921004-1114. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Maintenance,Engineering & Technical Support & Safety Assessment & Quality Verification IR 05000352/19920811992-12-0404 December 1992 Edsfi Repts 50-352/92-81 & 50-353/92-81 on Stated Date. Violations Noted.Major Areas Inspected:Review of Functionality of Electrical Distribution Sys IR 05000352/19920141992-05-0606 May 1992 Insp Repts 50-352/92-14 & 50-353/92-14 on 920420-24. Violations Noted.Major Areas Inspected:Review of Status of Radioactive Material,Staffing & Qualifications of Contractor Technicians,Alara & Tours of Radiological Controls Area IR 05000352/19900211990-11-15015 November 1990 Insp Repts 50-352/90-21 & 50-353/90-20 on 900827-31.No Violations Noted.Major Areas Inspected:Emeergency Preparedness Program IR 05000352/19900241990-10-26026 October 1990 Radiological Safety Insp Rept 50-352/90-24 & 50-353/90-23 on 901001-05.No Violations Noted.Major Areas Inspected: Radiological Safety Insp of Licensee Radiological Controls Program IR 05000352/19900221990-10-18018 October 1990 Insp Repts 50-352/90-22 & 50-353/90-21 on 900912-19.No Violations Noted.Major Areas Inspected:Engineering Organization,Staffing,Communications,Mgt Support,Design Changes & Mod Process 1999-09-16
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000352/19990051999-09-16016 September 1999 Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000352/19990041999-08-10010 August 1999 Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Engineering & Maint IR 05000352/19990031999-06-24024 June 1999 Insp Repts 50-352/99-03 & 50-353/99-03 on 990413-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Inspected, Radiological Protection,Security & Inservice Insp IR 05000352/19990021999-05-0707 May 1999 Insp Repts 50-352/99-02 & 50-353/99-02 on 990302-0412. Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000352/19990011999-03-26026 March 1999 Insp Repts 50-352/99-01 & 50-353/99-01 on 990112-0301. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20199C6641999-01-0606 January 1999 Insp Repts 50-352/98-09 & 50-353/98-09 on 981018-1130. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196C3371998-11-23023 November 1998 Insp Repts 50-352/98-08 & 50-353/98-08 on 980901-1017.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support.Security & Safeguards Activities Were Conducted in Manner That Protected Public Health IR 05000352/19980071998-09-25025 September 1998 Insp Repts 50-352/98-07 & 50-353/98-07 on 980707-0831.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000352/19980051998-08-0707 August 1998 Insp Repts 50-352/98-05 & 50-353/98-05 on 980601-24. Violations Noted.Major Areas Inspected:Backlogged Engineering Activities IR 05000352/19980041998-08-0505 August 1998 Insp Repts 50-352/98-04 & 50-353/98-04 on 980519-0706. Violations Noted.Major Areas Inspected:Aspects of PECO Energy Operations,Engineering & Maint IR 05000352/19980031998-06-18018 June 1998 Insp Repts 50-352/98-03 & 50-353/98-03 on 980317-0518. Violations Noted.Major Areas Inspected:Aspects of PECO Energy Operations,Engineering,Maint & Plant Support ML20247J2451998-05-11011 May 1998 Insp Repts 50-352/98-02 & 50-353/98-02 on 980120-0316. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000353/19970091998-03-11011 March 1998 Insp Rept 50-353/97-09 on 971010-980116.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20203G9211998-02-23023 February 1998 Insp Repts 50-352/97-10 & 50-353/97-10 on 971118-980119. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000352/19970081997-12-0808 December 1997 Insp Repts 50-352/97-08 & 50-353/97-08 on 970916-1117.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198N1771997-10-27027 October 1997 Insp Repts 50-352/97-07 & 50-353/97-07 on 970722-0915. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000352/19970061997-08-13013 August 1997 Insp Repts 50-352/97-06 & 50-353/97-06 on 970528-0721. Violations Noted.Major Areas Inspected:Peco Energy Operations,Engineering,Maintenance & Plant Support IR 05000352/19970051997-07-31031 July 1997 Insp Repts 50-352/97-05 & 50-353/97-05 on 970623-26.No Violations Noted.Major Areas Inspected:Licensee Performance During Biennial full-participation EP Exercise IR 05000352/19970031997-07-11011 July 1997 Insp Repts 50-352/97-03 & 50-353/97-03 on 970330-0527. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000352/19970011997-05-0707 May 1997 Insp Repts 50-352/97-01 & 50-353/97-01 on 970204-0329. Violations Noted.Major Areas Inspected:Operations, Engineering,Plant Support & Maintenance ML20136C0951997-03-0606 March 1997 Insp Repts 50-352/96-10 & 50-353/96-10 on 961217-970203. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20133H7391997-01-0909 January 1997 Insp Repts 50-352/96-09 & 50-353/96-09 on 961022-1216. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20132G4901996-12-20020 December 1996 Insp Repts 50-277/96-11,50-278/96-11,50-352/96-08 & 50-353/96-08 on 961003-1127.No Violations Noted.Major Areas Inspected:Documentations Containing Safeguards Info IR 05000352/19960071996-11-15015 November 1996 Insp Repts 50-352/96-07 & 50-353/96-07 on 960827-1021. Violations Noted.Major Areas Inspected:Conduct of Operations,Operational Status of Facilities & Equipment & Operations Procedures & Documentation IR 05000352/19950191996-02-0909 February 1996 Insp Repts 50-352/95-19 & 50-353/95-19 on 951120-1201. No Violations Noted.Major Areas Inspected:Program Implementation,Status & Scope,Operating Sizing & Settings IR 05000352/19940231994-11-10010 November 1994 Insp Repts 50-352/94-23 & 50-353/94-23 on 940927-1031. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance,Engineering,Plant Support & Safety Assessment & Quality Verification IR 05000352/19930311993-12-30030 December 1993 Insp Repts 50-352/93-31 & 50-353/93-31 on 931201.No Violations Noted.Major Areas Inspected:Protected Area Physical Barriers & Detection Aids IR 05000352/19930291993-12-22022 December 1993 Insp Repts 50-352/93-29 & 50-353/93-29 on 931102-1213.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering,Plant Support & Review of Licensee Event & Routine Repts IR 05000352/19930271993-11-29029 November 1993 Insp Repts 50-352/93-27 & 50-353/93-27 on 931101-05.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training Program IR 05000352/19930261993-11-19019 November 1993 Insp Repts 50-352/93-26 & 50-353/93-26 on 931004-08.No Violations Noted.Major Areas Inspected:Review of Licensee Corrective Actions of Nine Previously Identified Edsfi Findings Including Escalated Enforcement Item IR 05000352/19930191993-11-10010 November 1993 Insp Repts 50-352/93-19 & 50-353/93-19 on 930928-30.No Weaknesses Noted.Major Areas Inspected:Annual full- Participation Emergency Preparedness Exercise IR 05000352/19930251993-11-0808 November 1993 Insp Repts 50-352/93-25 & 50-353/93-25 on 930926-1101. Enforcement Discretion Exercised Re Missed Firewatch.Major Areas Inspected:Plant Operations,Maint,Surveillance,Plant Support & LER Re Missed Firewatch IR 05000352/19930241993-11-0101 November 1993 Insp Repts 50-352/93-24 & 50-353/93-24 on 930908-14.No Violations Noted.Major Areas Inspected:Reviewed Causes Leading to Loss of One Offsite Electrical Power Source & Subsequent Reactor Scram at Plant IR 05000352/19930231993-10-25025 October 1993 Insp Repts 50-352/93-23 & 50-353/93-23 on 930907-14. No Violations Noted.Major Areas Inspected:Radiological Controls Program Enhancements,Qa Oversight Activities & Contamination Control Program IR 05000352/19930221993-10-13013 October 1993 Insp Repts 50-352/93-22 & 50-353/93-22 on 930817-0925. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance & Engineering & Technical Support IR 05000352/19930201993-09-0909 September 1993 Insp Repts 50-352/93-20 & 50-353/93-20 on 930816-20.No Violations Noted.Major Areas Inspected:Technical Support of Plant Operations,Configuration Mgt,Pep,Esw & Residual Improvement Programs IR 05000352/19930111993-08-27027 August 1993 Insp Repts 50-352/93-11 & 50-353/93-11 on 930524-27.No Violations Noted.Major Areas Inspected:Changes to Emergency Plan & Implementing Procedures;Emergency Facilities, Equipment,Instrumentation & Supplies IR 05000352/19930101993-08-13013 August 1993 Erratum to Insp Repts 50-352/93-10 & 50-353/93-10 IR 05000352/19930171993-08-0202 August 1993 Insp Repts 50-352/93-17 & 50-353/93-17 on 930706-09.Two Unresolved Items Identified.Major Areas Inspected:Storage, Radioactive Waste Handling,Processing & Transportation Programs IR 05000352/19930011993-02-0404 February 1993 Insp Repts 50-352/93-01 & 50-353/93-01 on 930111-15.No Violations Noted.Major Areas Inspected:Radiological & non-radiological Chemistry Programs,Including Confirmatory Measurements IR 05000352/19920291993-01-27027 January 1993 Insp Repts 50-352/92-29 & 50-353/92-29 on 921115-930102. Noncited Violations Noted.Major Areas inspected:921204 Reactor Trip & Maint Efforts to Return Unit to Svc IR 05000352/19920301992-12-30030 December 1992 Insp Repts 50-352/92-30 & 50-353/92-30 on 921130-1204.No Violations Noted.Major Areas Inspected:Design Mods, Experience & Professional Proficiency of Engineering Staff Engaged in Design Mods IR 05000277/19920331992-12-11011 December 1992 Corrected Insp Repts 50-277/92-33,50-278/92-33,50-352/92-28 50-353/92-28 on 921123-25.Previously Missing Line from Page 8 of Original Rept Appears at Top of Page 9 ML20127F2831992-12-11011 December 1992 Insp Repts 50-277/92-33,50-278/92-33,50-352/92-28 & 50-353/92-28 on 921123-25.No Violations Noted.Major Areas Inspected:Annual partial-participation Exercise Conducted on 921124 IR 05000352/19920271992-12-0707 December 1992 Insp Repts 50-352/92-27 & 50-353/92-27 on 921004-1114. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Maintenance,Engineering & Technical Support & Safety Assessment & Quality Verification IR 05000352/19920811992-12-0404 December 1992 Edsfi Repts 50-352/92-81 & 50-353/92-81 on Stated Date. Violations Noted.Major Areas Inspected:Review of Functionality of Electrical Distribution Sys IR 05000352/19920141992-05-0606 May 1992 Insp Repts 50-352/92-14 & 50-353/92-14 on 920420-24. Violations Noted.Major Areas Inspected:Review of Status of Radioactive Material,Staffing & Qualifications of Contractor Technicians,Alara & Tours of Radiological Controls Area IR 05000352/19900211990-11-15015 November 1990 Insp Repts 50-352/90-21 & 50-353/90-20 on 900827-31.No Violations Noted.Major Areas Inspected:Emeergency Preparedness Program IR 05000352/19900241990-10-26026 October 1990 Radiological Safety Insp Rept 50-352/90-24 & 50-353/90-23 on 901001-05.No Violations Noted.Major Areas Inspected: Radiological Safety Insp of Licensee Radiological Controls Program IR 05000352/19900221990-10-18018 October 1990 Insp Repts 50-352/90-22 & 50-353/90-21 on 900912-19.No Violations Noted.Major Areas Inspected:Engineering Organization,Staffing,Communications,Mgt Support,Design Changes & Mod Process 1999-09-16
[Table view] Category:UTILITY
MONTHYEARIR 05000352/19900211990-11-15015 November 1990 Insp Repts 50-352/90-21 & 50-353/90-20 on 900827-31.No Violations Noted.Major Areas Inspected:Emeergency Preparedness Program IR 05000352/19900221990-10-18018 October 1990 Insp Repts 50-352/90-22 & 50-353/90-21 on 900912-19.No Violations Noted.Major Areas Inspected:Engineering Organization,Staffing,Communications,Mgt Support,Design Changes & Mod Process IR 05000352/19900201990-10-12012 October 1990 Insp Repts 50-352/90-20 & 50-353/90-19 on 900813-0916.No Violations Noted.Major Areas Inspected:Plant Operations, Radiation Protection,Surveillance & Maint,Emergency Preparedness & Security IR 05000352/19900191990-08-0303 August 1990 Insp Repts 50-352/90-19 & 50-353/90-18 on 900709-13.No Violations Noted.Major Areas Inspected:Radiological Control Program,Including Organization & Staffing,Training & Qualification of Personnel & Applied Health Physics IR 05000352/19900171990-08-0303 August 1990 Insp Repts 50-352/90-17 & 50-353/90-16 on 900522-0701. Violations Noted.Major Areas Inspected:Plant Operations, Radiation Protection,Surveillance & Maint,Emergency Preparedness,Security,Engineering & Technical Support ML20055F5621990-06-25025 June 1990 Insp Repts 50-352/90-80 & 50-353/90-80 on 900521-25.Plant Transient Response Implementing Plan (Trip) Procedures Technically Acceptable.Major Areas Inspected:Comparison of Trip Procedures W/Specific Technical Guidelines IR 05000352/19900031990-02-11011 February 1990 Insp Repts 50-352/90-03 & 50-353/90-03 on 900116-19.No Violations Noted.Major Areas Inspected:Design & Surveillance Program for Compliance W/Atws as Described in 10CFR50.62 & NUREG-0991,SSER 9 IR 05000353/19890811989-09-27027 September 1989 Insp Rept 50-353/89-81 on 890731-0804.Violation Noted.Major Areas Inspected:Readiness of Licensee to Safely Conduct Power Operations at Facility Considering near-term Full Power Licensing IR 05000352/19890151989-09-22022 September 1989 Insp Repts 50-352/89-15 & 50-353/89-24 on 890626-0730.No Violations Noted.Major Areas Inspected:Maint & Surveillance Testing,Review of LERs & Periodic Repts & Operational Events.Viewgraphs from 890724 Meeting Encl IR 05000352/19890171989-09-0707 September 1989 Insp Repts 50-352/89-17 & 50-353/89-25 on 890724-27.No Violations Noted.Major Areas Inspected:Effectiveness of Training Conducted to Correct Inability of Operators to Properly Classify Events in Escalating Emergency IR 05000352/19890161989-09-0505 September 1989 Insp Rept 50-352/89-16 on 890807-11.No Violations Noted. Major Areas Inspected:Corporate Engineering Group & Support Provided to Facility & Mods Performed During Plant Second Refueling Outage IR 05000353/19892011989-08-0808 August 1989 Corrective Action Insp Rept 50-353/89-201 on 890424-28. Plant Design Meets Licensing Commitments.Major Areas Inspected:Mechanical Sys,Verification of Nonstandard Computer Codes & Incorrect Nameplate for RHR Pump Motor IR 05000352/19890121989-07-28028 July 1989 Insp Repts 50-352/89-12 & 50-353/89-19 on 890529-0625. Violations Noted.Major Areas Inspected:Maint & Surveillance Testing,Review of Lers,Periodic Repts & Operational Events & Sys Walkdowns IR 05000352/19890141989-07-20020 July 1989 Enforcement Conference Rept 50-352/89-14 on 890717.Major Items Discussed:Findings of NRC Insp Rept 50-352/89-14 Re Shipment of Seavan to Vendor Site in Oakridge,Tn IR 05000353/19890201989-07-13013 July 1989 Preoperational Safety Insp Rept 50-353/89-20 on 890530-0621. Programs Adequate to Support Testing & Startup.Major Areas Inspected:Control of Radioactive Matl & Contamination, Surveys & Monitoring,Facilities & Equipment & ALARA ML20246K5771989-07-0707 July 1989 Reactive Insp Rept 50-352/89-14 on 890629.Violation Noted. Major Areas Inspected:Circumstances Surrounding Shipment of Seavan to Quadrex Recycle Ctr IR 05000353/19890211989-07-0505 July 1989 Insp Rept 50-353/89-21 on 890530-0602.No Violations or Deviations Noted.Major Areas Inspected:Licensee Activities Re NRC Bulletin 79-14 Concerning Pipe Supports & Preservice Insp of Piping & Components IR 05000352/19890111989-06-19019 June 1989 Insp Repts 50-352/89-11 & 50-353/89-17 on 890522-26 & 0607. Violations Noted.Major Areas Inspected:Changes to Emergency Preparedness Program,Emergency Facilities,Equipment, Instrumentation & Supplies IR 05000353/19890231989-06-15015 June 1989 Insp Rept 50-353/89-23 on 890605-07.No Violation Noted.Major Areas Inspected:Licensee Liquid & Gaseous Radioactive Effluent Control Programs & Solid Radwaste Program Including Installations,Testings & Calibr IR 05000353/19890181989-05-17017 May 1989 Insp Rept 50-353/89-18 on 890429-0506.No Violations Noted. Major Areas Inspected:Structural Integrity Test Procedures & Implementation & Qa/Qc Involvement W/Integrity Test Procedures IR 05000353/19892001989-05-12012 May 1989 Independent Const Assessment Insp Rept 50-353/89-200 on 890330-31.No Violations Noted.Major Areas Inspected:Final S&W Independent Const Assessment Rept & Licensee Action Re Deficiencies & Issues Identified During Overview IR 05000352/19890091989-05-11011 May 1989 Insp Repts 50-352/89-09 & 50-353/89-15 on 880329-0423. Violations Noted.Major Areas Inspected:Operations, Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security & Engineer/Technical Support IR 05000353/19890131989-04-19019 April 1989 Insp Rept 50-353/89-13 on 890227-0316.No Violations Noted. Major Areas Inspected:Preoperational Test Program Implementation,Preoperational Test Procedures,Preoperational Test Results & Qa/Qc Involvement in Test Program IR 05000352/19890081989-04-14014 April 1989 Partially Withheld Physical Security Insp Repts 50-352/89-08 & 50-353/89-14 on 890307-09 & 20-23 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Action on Previously Identified Items & Security Program Plans IR 05000353/19890111989-04-0707 April 1989 Insp Rept 50-353/89-11 on 890213-0326.No Violations Noted. Major Areas Inspected:Work Activities,Security Implementation,Environ Qualification of Equipment & Proposed Tech Specs IR 05000352/19890031989-04-0707 April 1989 Insp Rept 50-352/89-03 on 890227-0326.No Violations Noted. Major Areas Inspected:Routine Daytime & Backshift Operations,Including Plant Tours,Observations of Maint & Surveillance Testing & Review of Lers & Periodic Repts IR 05000353/19890071989-04-0303 April 1989 Insp Rept 50-353/89-07 on 890126-0203.No Violations, Deviations or Unresolved Items Noted.Major Areas Inspected: Licensee Programs That Identify & Control Specific Differences in Design & Const of Both Units ML20244D4891989-04-0303 April 1989 Insp Rept 50-352/89-07 on 890306-10.No Violations Noted. Major Areas Inspected:Inservice Insp Activities to Ascertain Activities Conducted Per Applicable ASME Code & Regulatory Requirements & Licensee Response to Generic Ltr 88-01 IR 05000352/19880241989-03-31031 March 1989 Insp Rept 50-352/88-24 on 881107-1218.No Apparent Vulnerabilities in Balance of Plant Found Which Have,To Date,Contributed to Reactor Challenges,I.E.,Recurrent Scrams.Major Areas inspected:balance-of-plant Sys IR 05000353/19882031989-03-23023 March 1989 Insp Rept 50-353/88-203 on 890103-06.No Violations Noted. Major Areas Inspected:S&W Evaluation of Closed Action Items, Observation Repts to Reflect Action Item Unresolved Issues & Status of Compliance W/Previous Insp IR 05000353/19890121989-03-22022 March 1989 Insp Rept 50-353/89-12 on 890224-0303.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Procedure Reviews,Qa/Qc Interfaces & Tours of Facility IR 05000352/19890801989-03-21021 March 1989 Maint Team Insp Repts 50-352/89-80 & 50-353/89-80 on 890130-0210.Weaknesses Noted.Major Areas Inspected:Maint Program & Program Implementation,Including Equipment Walkdowns & Observation of Maint Work IR 05000352/19890041989-03-17017 March 1989 Insp Rept 50-352/89-04 on 890124-0226.No Violations Noted. Major Areas Inspected:Plant Tours,Observations of Maint & Surveilance Testing & Review of Lers,Periodic Repts, Operational Events & Sys Walkdowns IR 05000353/19890101989-03-10010 March 1989 Insp Rept 50-353/89-10 on 890206-16.No Violations Noted. Major Areas Inspected:Preoperational Test Program Implementation,Preoperational Test Procedures,Preoperational Test Results & Qa/Qc Involvement in Test Program IR 05000352/19890061989-03-0707 March 1989 Insp Repts 50-352/89-06 & 50-353/89-06 on 890123-27. Violation Noted.Major Areas Inspected:Safe Shutdown Capability of Plant in Event of Fire IR 05000352/19890051989-03-0202 March 1989 Safety Insp Repts 50-352/89-05 & 50-353/89-08 on 890130- 0203.No Violations Noted.Major Areas Inspected:Licensee Radiological Controls Program,Including Unit 1 Outage Activities & Changes to Health Physics Organization IR 05000353/19890091989-03-0101 March 1989 Insp Rept 50-353/89-09 on 890131-0207.No Violations Noted. Major Areas Inspected:Overall Power Ascension Program Including Training for Test Engineers.Two Unresolved Items Identified Including Limiting Control Rod Withdrawal IR 05000352/19890011989-02-22022 February 1989 Insp Rept 50-352/89-01 on 890117-20.No Violations Noted. Major Areas Inspected:Implementation of post-accident Monitoring Instrumentation in Accordance W/Reg Guide 1.97, Rev 2 IR 05000353/19890031989-02-14014 February 1989 Insp Rept 50-353/89-03 on 890109-19.No Violations Noted. Major Areas Inspected:Overall Power Ascension Program, Including Procedure Review,Qa/Qc Interfaces & Tour of Facility IR 05000353/19880251988-10-28028 October 1988 Insp Rept 50-353/88-25 on 8880912-1016.Violations Noted. Major Areas Inspected:Work Activities,Procedures,Records Re Spent Fuel Pool Racks,Preoperational Test Procedure Review, Startup Test Activities,Engineering & Deficiency Repts IR 05000353/19880221988-10-18018 October 1988 Insp Rept 50-353/88-22 on 880912-23.No Violations Noted. Major Areas Inspected:Preoperational Test Program,Including Review of Implementation Requirements,Preoperational Test Procedures & Integrated Sys Flush Test IR 05000353/19880241988-10-11011 October 1988 Insp Rept 50-353/88-24 on 880912-15.No Violations Noted. Major Areas Inspected:Installation of safety-related Instrumentation Components & Status of Previously Identified Open Items IR 05000353/19880261988-10-0606 October 1988 Insp Rept 50-353/88-26 on 880927-30.No Violations or Deviations Noted.Major Areas Inspected:Corporate Emergency Support Program,Staffing,Training,Mgt Support & Communications ML20207K8681988-10-0404 October 1988 Daytime & Backshift/Holiday Insps of 880815-0924.No Violations Noted.Major Areas Inspected:Plant Tours,Sys Walkdowns,Observations of Maint & Surveillance & Review of LERs & Periodic Repts.Supporting Info Encl IR 05000353/19880211988-09-28028 September 1988 Insp Rept 50-353/88-21 on 880808-0911.No Violations Noted. Major Areas Inspected:Work Activities,Procedures,Records Relative to Preoperational & Technical Tests,Independent Design & Const Assessment & Welding IR 05000353/19882001988-09-23023 September 1988 Insp Rept 50-353/88-200 on 880808-12.Insp Scope & Objective: Independent Design & Const Assessment Review Plans Prepared in Sufficient Technical Depth to Permit Adequate Evaluation of Design & Const of Facility IR 05000352/19880181988-09-23023 September 1988 Insp Rept 50-352/88-18 on 880816-19.No Violations Noted. Major Areas Inspected:Fire Protection/Prevention Program, Including Program Administration & Organization,Equipment Maint,Insp & Test,Qa Audits & Facility Tours IR 05000353/19880201988-09-14014 September 1988 Insp Rept 50-353/88-20 on 880808-12.No Violations Noted. Major Areas Inspected:Preoperational Test Program Implementation Requirements & Preoperational Test Procedures Activities in Qa/Qc Interface W/Preoperational Test Program IR 05000353/19880171988-09-0808 September 1988 Insp Rept 50-353/88-17 on 880725-29.No Violations Noted. Major Areas Inspected:Preoperational Test Program,Including Review of Implementation Requirements,Procedures & Test Witnessing of Emergency Diesel Generator a IR 05000353/19880191988-09-0202 September 1988 Insp Rept 50-353/88-19 on 880808-12.No Violations Noted. Major Areas Inspected:Preservice Insp Activities to Ascertain Whether Licensee Activities Conducted in Compliance W/Applicable ASME Code 1990-08-03
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-I-99-045, on 990923,operators at Limerick Generating Station Declared Unusual Event Due to Presence of Toxic Gases within Site Boundary.No Toxic Gases Were Detected within Main Cr.No Personnel Were Injured or Made Ill1999-09-24024 September 1999 PNO-I-99-045:on 990923,operators at Limerick Generating Station Declared Unusual Event Due to Presence of Toxic Gases within Site Boundary.No Toxic Gases Were Detected within Main Cr.No Personnel Were Injured or Made Ill IR 05000352/19990051999-09-16016 September 1999 Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000352/19993031999-09-0808 September 1999 Exam Repts 50-352/99-303OL & 50-353/99-303OL on 990812.Exam Results: One Reactor Operator Applicant Was Administered Retake Section B of Test & Passed IR 05000352/19990041999-08-10010 August 1999 Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Engineering & Maint IR 05000352/19993021999-08-0404 August 1999 NRC Operator Licensing Exam Repts 50-352/99-302 & 50-353/99-302 Adminsitered on 990702-14 (Administration) & 990715-22 (Grading).Six of Six Limited SROs Passed All Portions of Exams IR 05000352/19990031999-06-24024 June 1999 Insp Repts 50-352/99-03 & 50-353/99-03 on 990413-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Inspected, Radiological Protection,Security & Inservice Insp IR 05000352/19990021999-05-0707 May 1999 Insp Repts 50-352/99-02 & 50-353/99-02 on 990302-0412. Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000352/19993011999-04-30030 April 1999 NRC Operator Licensing Exam Repts 50-352/99-301 & 50-353/99-301 Administered on 990312-19 (Administration & 990322-26 (Grading).Exam Results:Five RO & Four SRO Applicants Were Administered Exam.One RO & One SRO Failed PNO-I-99-019, on 990420,Limerick Unit 1 Automatically Shutdown from 100% Power on Low Rwl Due to Loss of Mfw. Normal Feedwater Sys Has Been Restored,Which Allowed for Securing of RCIC & HPCI Systems.Licensee Issued Pr1999-04-21021 April 1999 PNO-I-99-019:on 990420,Limerick Unit 1 Automatically Shutdown from 100% Power on Low Rwl Due to Loss of Mfw. Normal Feedwater Sys Has Been Restored,Which Allowed for Securing of RCIC & HPCI Systems.Licensee Issued Pr IR 05000352/19990011999-03-26026 March 1999 Insp Repts 50-352/99-01 & 50-353/99-01 on 990112-0301. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20199C6571999-01-0606 January 1999 Notice of Violation from Insp on 981018-1130.Violation Noted:On 981105,procedure M-053-006,required by App a of Reg Guide 1.33,not Implemented as Required by Procedure A-C-079 ML20199C6641999-01-0606 January 1999 Insp Repts 50-352/98-09 & 50-353/98-09 on 981018-1130. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196C3371998-11-23023 November 1998 Insp Repts 50-352/98-08 & 50-353/98-08 on 980901-1017.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support.Security & Safeguards Activities Were Conducted in Manner That Protected Public Health IR 05000352/19980071998-09-25025 September 1998 Insp Repts 50-352/98-07 & 50-353/98-07 on 980707-0831.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000352/19980051998-08-0707 August 1998 Insp Repts 50-352/98-05 & 50-353/98-05 on 980601-24. Violations Noted.Major Areas Inspected:Backlogged Engineering Activities ML20237A3091998-08-0707 August 1998 Notice of Violation from Insp on 980606-24.Violation Noted: Defective Equipment in Supply Circuit Breaker of Load Ctr 124B Not Identified & Corrected & on 980322 Breaker Tripped Unexpectedly & de-energized All Loads Supplied by Center ML20236X8161998-08-0505 August 1998 Notice of Violation from Insp on 980519-0706.Violation Noted:As of 980304,licensee Had Not Submitted LER for Condition Prohibited by Plant TS within 30 Days After Discovery of Event IR 05000352/19980041998-08-0505 August 1998 Insp Repts 50-352/98-04 & 50-353/98-04 on 980519-0706. Violations Noted.Major Areas Inspected:Aspects of PECO Energy Operations,Engineering & Maint ML20236M7331998-07-0707 July 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:During 970901-980121, Condition Adverse to Quality Existed Involving Inoperability of 1B RHR Min Flow Valve & No C/As Taken ML20237E4241998-07-0101 July 1998 EN-98-049:on 980707,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Two Violations Re Failure to Take Appropriate Corrective Action to Address Conditions Adverse to Quality at Facility IR 05000352/19980031998-06-18018 June 1998 Insp Repts 50-352/98-03 & 50-353/98-03 on 980317-0518. Violations Noted.Major Areas Inspected:Aspects of PECO Energy Operations,Engineering,Maint & Plant Support ML20249C1901998-06-18018 June 1998 Notice of Violation from Insp on 980317-0518.Violation Noted:Measures Established to Correct Nonconformances Re Log Entries,Identified in Violation 97-10-01,did Not Preclude Repetition of Similar Problem PNO-I-98-019, on 980603,operators Found One of Three Standby Liquid Injection Pumps Running & Injecting Into Reactor Vessel.No Alarms Identified on Redundant Reactivity Control Sys Which Provides Automatic SLC Initiation Feature1998-06-0404 June 1998 PNO-I-98-019:on 980603,operators Found One of Three Standby Liquid Injection Pumps Running & Injecting Into Reactor Vessel.No Alarms Identified on Redundant Reactivity Control Sys Which Provides Automatic SLC Initiation Feature ML20247J2401998-05-11011 May 1998 Notice of Violation from Insp on 980120-0316.Violations Noted:On 980213,significant Condition Adverse to Quality Identified & Previous C/A on Control of Locked Valves Did Not Preclude Repetition ML20247J2451998-05-11011 May 1998 Insp Repts 50-352/98-02 & 50-353/98-02 on 980120-0316. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support PNO-I-98-013, on 980417,alert Declared After Detection by Smell of Unidentified Odor,Initially Believed to Be Acetylene or Propane Gas,Resulting in Evacuation of Area. Fire Brigade Activated1998-04-17017 April 1998 PNO-I-98-013:on 980417,alert Declared After Detection by Smell of Unidentified Odor,Initially Believed to Be Acetylene or Propane Gas,Resulting in Evacuation of Area. Fire Brigade Activated IR 05000353/19970091998-03-11011 March 1998 Insp Rept 50-353/97-09 on 971010-980116.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20203G9111998-02-23023 February 1998 Notice of Violation from Insp on 971118-980119.Violation Noted:On 971206,required Narrative Log Entries in Unified Log for Safety Sys Inoperability Were Not Made ML20203G9211998-02-23023 February 1998 Insp Repts 50-352/97-10 & 50-353/97-10 on 971118-980119. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20202F9901998-02-0505 February 1998 Exam Repts 50-352/98-01 & 50-353/98-01 on 980120-23.No Violations Noted.Exam Results:Two Ro,Two Srou & Four SRO Candidates Were Administered Initial Licensing Exams. Everyone Passed All Portions of Exam IR 05000352/19970081997-12-0808 December 1997 Insp Repts 50-352/97-08 & 50-353/97-08 on 970916-1117.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198N1771997-10-27027 October 1997 Insp Repts 50-352/97-07 & 50-353/97-07 on 970722-0915. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198N1701997-10-27027 October 1997 Notice of Violation from Insp on 970722-0915.Violation Noted:Inspector Identified Valve Locking Devices Not Applied Through Valve Handwheel or Other Operating Mechanism to Restrict Operation of Valves Listed on Valve List Exhibits ML20198Q9181997-09-29029 September 1997 Notice of Violation from Insp on 970528-0721.Violation Noted:As of 960726,licensee Did Not Implement & Maintain in Effect Certain Provisions of Approved FP Program as Described in UFSAR for Facility IR 05000352/19970061997-08-13013 August 1997 Insp Repts 50-352/97-06 & 50-353/97-06 on 970528-0721. Violations Noted.Major Areas Inspected:Peco Energy Operations,Engineering,Maintenance & Plant Support ML20210N9861997-08-13013 August 1997 Notice of Violation from Insp on 970528-0721.Violation Noted:Peco Energy Did Not Submit LER within 30 Days After Discovery of an Event Which Occurred on 930316 for Condition Prohibited by Plants TS ML20210K9141997-07-31031 July 1997 EN-97-066:order Prohibiting Involvement in NRC-licensed Activities Issued on or About 970805 to Unlicensed Individual Who Formerly Worked as Primary Chemistry Manager at Limerick Generating Station,Units 1 & 2 ML20210K8841997-07-31031 July 1997 EN-97-065:on 970805,notice of Proposed Imposition of Civil Penalty in Amount of $80,000 Issued to Licensee.Action Includes Two Violations Involving Instances of Record Falsification at Limerick Generating Station IR 05000352/19970051997-07-31031 July 1997 Insp Repts 50-352/97-05 & 50-353/97-05 on 970623-26.No Violations Noted.Major Areas Inspected:Licensee Performance During Biennial full-participation EP Exercise ML20210K9771997-07-31031 July 1997 EN-97-067:order Prohibiting Involvement in NRC-licensed Activities Issued on or About 970805 to Sf Nevin Unlicensed Individual at Limerick Generating Station,Units 1 & 2.Action Based on Investigation Conducted by OI IR 05000352/19970031997-07-11011 July 1997 Insp Repts 50-352/97-03 & 50-353/97-03 on 970330-0527. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20149E1391997-07-11011 July 1997 Notice of Violation from Insp on 970330-0527.Violation Noted:Master Keys Were Not Properly Controlled & Were in Possession of Unauthorized Personnel & Temporary Change to GP12 Altered Intent of Original Procedure IR 05000352/19970991997-05-0909 May 1997 SALP Repts 50-352/97-99 & 50-353/97-99 for 950402-970329 IR 05000352/19970041997-05-0808 May 1997 Exam Repts 50-352/97-04OL & 50-353/97-04OL on 970501. Exam Results:Initial Retake Exam Administered to One RO Applicant on 970501.Applicant Passed Exam ML20148C1511997-05-0707 May 1997 Notice of Violation from Insp on 970204-0329.Violation Noted:In Jan 1997,mod Made to Unit 2 Fuel Preparation Machines That Made Info in SAR Incomplete in That Test Fixture Was Added Which Caused Fuel to Be Raised IR 05000352/19970011997-05-0707 May 1997 Insp Repts 50-352/97-01 & 50-353/97-01 on 970204-0329. Violations Noted.Major Areas Inspected:Operations, Engineering,Plant Support & Maintenance ML20136C0891997-03-0606 March 1997 Notice of Violation from Insp on 961217-970203.Violation Noted:Diesel Generator Fuel Oil Storage Tank Level Was Below TS Value & Required Actions for Inoperable Diesel Generator Was Not Performed ML20136C0951997-03-0606 March 1997 Insp Repts 50-352/96-10 & 50-353/96-10 on 961217-970203. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000352/19970021997-02-12012 February 1997 NRC Operator Licensing Exam Repts 50-352/97-02OL & 50-353/97-02OL on 970120-24.Exam Results:Good Performance Including Teamwork & Communications Was Demonstrated by Applicants.Six of Seven Applicants Passed Exam ML20134F9051997-02-0303 February 1997 Notice of Violation from Insp on 960305 & 0506 & Between 1003 & 1127.Violation Noted:Electronic Copy of Limerick Physical Security Plan,Located on PECO Nuclear Local Area Network & Document Not Under Control 1999-09-08
[Table view] |
Text
_ _ _ _ _ _ _ _ - _ _ _ _ _ . _ _ _ _ _ . _
.
.
j
'
'
.
!
t f
V,S. NUCLEAR REGULATORY COMMISSION REGION I !
'
!
Report No. 88-08 Docket N i License N NPF-39 ;
Licensee: Philadelphia Electric Company i 2301 Market Street Philadelphia, Pa 19101 i Facility Name: Limerick Generatirg Station, Unit 1 Inspection Period: March 11 - April 30, 1988 Inspectors: T. J. Kenny, Senior Resident Inspector L. L. Scholl, Resident Inspector T. P. Johnson, Senior Resident Inspector L. E. Myers, Resident Inspector Reviewed by: /'- +'k I[
j . W fi s,fhtEngineer ' Da'te ~
Approved by: t4 2Y
.
Jd's4dv le 'ief, Projects Section 2A ' Date Su mary: R ne daytime ( 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />) and backshift/ holiday (28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br />)
inspections of Unit 1 by the resident inspectors consisting of (a) plant tours, (b) observations of ' maintenance and surveillance, (c) review of LERs and periodic reports, (d) review of operational events and (e) system walkdown During this inspection period the licensee:
-
Identified a fuel cladding degradation (discussed in section 2.5 of I this report).
- Conducted an outage during which the the licensee repaired the 0 and ,
I channel intermediate range monitors, cleaned and leak tested the i main condensers, and performed electrical and roechanical maintenance '
including repacking valves to eliminate steam leaks and condenser air inleakage.
-
Conducted a plant start-up, t f
I i
O D ko Mj
- -- _-- M 5-_ -- -- -
_ . _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ .
.
.
t
.
. Submitted LERs (discussed in section 6,0), one monthly report
!
(discussed ;n section 5.0) and one security report (discussed in
<
section 2.3).
-
Conducted on site n.eetings with the NRC to discuss the new quality assurance department alignment and reactor coolant water chemistry program, including methods to control impurities in the water and i
the philosophy for operating with degraded fuel cladding. These j licensee initiatives will be assessed during future inspection One violation involving 'nadequate control of temporary procedure
.
changes 15 di ,.'?*d in section I l
I
!
'
,.
h l
. - - . .. . _
-
.
'
.
<
DETAILS 1.0 Persons Contacted Within this report period, interviews and discussions were conducted with members of licensee management and staff as necessary to support inspection activit .0 Operational Safety Verification (71707, 70709, 71710 and 71881)
2.1 Documents Reviewed
-
Selected Operators' Logs
-
Shift Superintendent's Log
-
Temporary Circuit Alteration Log -
-
Radioactive Waste Release Permits (liquid and gaseous)
-
Selected Radiation Work Permits (RWP)
-
Selected Chemistry Logs
-
Selected Tagouts
-
Health Physics Log t
2.2 The inspector conducted routine entries into the protected areas of the plant, including the control room, reactor enclosure, fuel floor, and drywell (when access is possible). During the inspection, discussions were held with operators, techniciar.s (HP &
I&C), mechanics, security personnel, supervisors and plant management.. The inspections were conducted.in accordance with NRC .
Inspection Procedures 71707, 71709, 71710 and 71881 and affirmed the '
licensee's commitments and compliance with 10 CFR, Technical Specifications, License Conditions and Administrative Procedure One violation was identified (detail 2.4). ,
2. Engineered Safety Feature (ESF) System Walkdown: (71710)
,
The inspectors verified the operability of the selected i ESF system by performing a walkdown of accessible portions of the system to confirm that system lineup procedures
- match plant drawings and the as-built configuration. This ESF system walkdown was also conducted to identify equipment conditions that might degrade performance, to determine that instrumentation is calibrated and functioning, and to verify that valves are properly
,
positioned and locked as appropriate. The High Pressure
'
Coolant Injection system was inspected. The following
! concern was noted, i-l Information note (tag #55-17) on suppression pool return i valve F071 stated that the valve may not open when the i
m._--,.,-.,---._,...,~-__ . _ _ . - - . - _ - - . _ _ . - - - . - . - . , ,
.
. .
.
. -4-High Pressure Coolant Injection (HPCI) pump _ discharge pressure is greater than 1000 psig. Discussions with operators determined that the suppression pool mode of HPCI was used for reactor pressure control during_the September 19, 1987 scram, however, no operating procedure existed even though this is the normal met. hod of operating HPCI during routine surveillance testing. The licensee identified the procedural need and subsequently revised S.55.1.0 to include steps for this HPCI mode. The inspector verified that Rev. 5 dated February 25, 1988 included a procedure step (8.18) for this activit However, three operators interviewed were unaware of this procedure revision. During discussions with operations management and the HPCI system engineer, the inspector expressed concern that the operators interviewed were not aware of the existence of an approved procedure for the HPCI suppression pool mode of operation. The licensee stated that training was scheduled for the current requalification cycle, however, the licensee took immediate steps to ensure that operators were informed of this HPCI procedural change. The inspector had no further questions. The timeliness and adequacy of training on procedure revisions will be reviewed in a future inspectio .3 Inspector Comments / Findings (92706, 93702)
The inspector selected phases of the unit's operation to determine compliance with the NRC's regulations. The inspector determined that the areas inspected and the licenseeT actions did not constitute a health and safety hazard to the public or plant personnel. The following are noteworthy areas the inspector researched in depth:
On March 11, at 8:37 p.m., the licensee informed the NRC cf alleged cocaine transactions that took place inside of the Unit 1 protected area. The information was obtained from confidential sources. Four
- janitorial personnel were interviewed on March 11. One admitted to l
selling cocaine on site in September 1987 and his employment was l terminated. Three other personnel submitted to urinalysis and pending test results, have had their Unit 1 access droppe '
Additionally, as part o' the licensee's deterrent actions, drug detection dogs were ranc3mly deployed on site March 14 to search 2 selected site locations. An NRC Region I Safeguards Supervisor and
'
the Senior Resident Inspestor witnessed the searches. No additional findings were made. Licer see report number 88-S02 v.as reviewed by
- the inspector and the corrective actions were found to be adequate.
,
.
.
.
'
.
. -5-On March 21, Mr. Thomas J. Kenny assumed the duties of Senior Resident Inspector at Limerick Unit 1. Mr. Eugene Kelly transferred to Region I to assume the duties of Technical Support Section Chie This is Mr. Kenny's third assignment as a Senior Resident Inspecto Former assignments were Indian Point Stations Unit 2 and 3 and Salem Station Units 1 and On March 24, at 4:45 a.m., a reactor water cleanup system isolation occurred. The isolation was initiated by the steam leak detection system because of high temperature in the room. The resident inspector conducted a followup inspection including discussions with the licensee during which the licensee stated a relief valve in the regenerative heat exchanger room was leaking past its seat. The valve was replaced and the system returned to operation on March 2 Reactor coolant chemistry remained within technical specification limits during the system outag On March 26, at 2:41 a.m., a reactor enclosure isolation occurred due to low differential pressure caused by the tripping of reactor enclosure ventilation fans. The fans tripped when system dampers drifted shut due to instrument air system pressure dacreasing below the normal setpoint. A system valve lineup error during restoration from maintenance caused the decreasing air pressure. The air lineup was corrected, the isolation signal was reset, and at 2:47 a.m. the system was returned to normal. Discussions with the licensee identified that the individual involved was relatively new on the job and misunderstood the direction he was given for the valve lineup. He was counseled by the supervision on procedural awareness and the correct method to perform valve lineup On March 26, at 6:15 a.m., the reactor water cleanup (RWCU) system .
isolated on a high differential flow signa The isolation occurred during a realignment of the system to allow a slow warmup of the 'C'
, RWCU pump prior to placing it in service. The flow instruments were verified for proper operation, the isolation was reset, and the system returned to service. A modification is planned which will reduce the size of the deminerali7er bypass valve to allow better flow control and avoid such transients and the resulting isolations.
. On March 25, the licensee noted increased radiation levels at the steam jet air ejector Subsequent grab semples indicated the presence of a small fuel cladding inak. No increase in off site release was detected due to the small size of the leak. Reactor coolant dose equivalent iodine levels increased by about a factor of 10 but remained a factor of 100 below the technical specification limi For more information see paragraph 2.5 of this repor <
_ _ _ _ - _ _ _ _ . - - _ _ _ . _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ - - - - - - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - = - - - - - -
i
.
.
.
-6-On April 5, an unannounced emergency planning drill was hel The state and local counties participated in the drill and the NRC observed. For further details see NRC inspection report 50-352/88-0 On April 6, at 7:27 a.m. , a hand gun was found in an employee's personal bag as he was entering the protected area. Security personnel detected the gun with x-ray screening equipment and the individual has been denied access to the plant pending further investigation. The NRC and local police were notifie The person involved stated he forgot to remove the gun prior to entering the plant and did not intend to bring it on sit Subsequent investigations by the licensee and discussions with the resident inspectors and Region I security personnel revealed that the licensee's one hour notification was not necessary because the hand gun never was inside the protected area and testing of the individual indicated there was no intent to commit harm. The individual is working for the licensee outside the protected area and is being evaluated.to determine if he may return to his former jo On April 8, at 2:00 p.m., the licensee began to shutdown the unit for a 10 day maintenance outage. The maintenance outage was primarily to clean main condensers in order to improve plant efficienc During the shutdown, the licensee located the leaking fuel element in the fuel bundles surrounding control rod 50-23 by the manipulation of control rods. This information enabled the licensee to determine a rod pattern which will minimize power in the failed region during future operatio The reactor was not opened to remove any fuel. A refueling outage is planned for January 198 On April 9, at 4:15 a.m., the reactor scrammed from a low power leve During the shutdown the licensee had inserted a one half scram signal on Channel 81 in accordance with technical specifications because of inoperable Intermediate Range Monitors (IRMs). However, during the shutdown sequence a power increase occurred with IRM channel 'C' on range 2 resulting in a high flux scram. The power increase has been attributed to the decrease in reactor coolant temperature caused by the control rod drive water flow and heat losses to ambient. The corrective actions to prevent recurrence will be reviewed in a future repor At 3:36 p.m., while in cold shutdown with a one half scram signal inserted in A2 chanr.el, a spike was received on 'F' IRM (range 1)
causing a B1 channel trip. This was attributed to noise on the channel apparently caused by a welding machine in the area of cables coming from the 'F' IRM channel instrumen . - - .- .- -
.
. -
. .
,
-7-During the scram at 4:15 a.m. the licensee identified that neither l the scram pilot air solenoid valves nor the scram discharge volume ;
drain valves functioned as expected while resetting the !
scrar. The licensee conducted testing, using an approved procedure (SP-055 CRDH Scram System Operability Test), to determine why the I valves did not operate as expected. Testing showed that l when the one half scram signal on the 'B' channel is present the I system does not reset as expected and when the 'A' one half scram I signal is present the system resets as expected. The reason is that the path for air venting when the 'B' signal is present does not allow the solenoid diaphragms to reposition themselves due to j low air pressure. This phenomenon was subsequently found to have ;
'
been the subject of NRC Information Notice 85-95 and a GE information letter dated May 9, 1972. The licensee reviewed actions taken upon receipt of this information and noted a prior change to procedure GP 11, Reactor Protection System-Scram Rese However, while the change enabled the operators to recognize the unexpected operation of the CRDH scram system, it did not identify the reason why the system did
- not function as expected. The licensee has corrected procedure GP 11 to amplify the reason. The licensee also revisited the reasoning l
'
behind inserting the one half scram and issued PORC position 36 which clearly defines the reasons for the insertion of the one half scram and the conditions under which it is necessar It should be noted that although the licensee made changes to procedure GP-11 in response to information from the NRC and GE, and did recognize the unexpected operation of the system, the information
in the procedure was not clear enough for the operator to immediately recognize a known system idiosyncrasy as described in the above f
mentioned correspondenc On April 16, a control room chlorine detector momentarily spiked upscale causing a control room isolation. The signal was verified
'
to be spurious by an immediate check of the remaining three detection channels. The control room isolation and emergency fresh air systems functioned per design. A plant modification is planned which will eliminate spurious isolations caused by a single instrument spikin On April 16, at 7:55 p.m., a security watchman was found sleeping while on duty. The watchman was immediately relieved and removed i
from the site. A licensee conducted search of the area did not reveal any discrepancies. A licensee investigation conducted subsequent to the initial NRC notification determined that at the time of occurrence additional compensatory measures were in place due to sun glare on the closed circuit television camera . _ . __ _ ___
.
. .
.
. -8-On April 18 the 014 diesel generator inadvertently started during troubleshooting. The start occurred when technicians were performing a continuity measurement in the control circuitry causing a relay in the starting circuit to energize. The diesel started normally and there was no equipment damage or aay other undesirable consequences. The resident inspector will review the adequacy of the-licensee's actions when the LER is issue On April 20, a plant start-up commenced following the completion of the 10 day outage in which the licensee performed main condenser cleaning and selected maintenanc Criticality was achieved at 9:55 p.m. April 20, and the plant was returned to service at 3:26 on April 22. The delay in the startup was attributed to a newly discovered steam leak on a feedwater heater drain valve. After repairs to the valve the unit power was increased to 85% where the licensee is evaluating the fuel defect and the effectiveness of the control rod pattern in minimizing reactor coolant radioactivity level .4 D-14 Emergency Diesel Generator Temporary Circuit Alteration On January 22, a temporary circuit alteration was installed to jumper a defective contact on the remote / local control switch for the D-14 emergency diesel generator. In order to operate the diesel generator in the "local" mode, the jumper must be removed. A change to procedure SE-8, Attachment D, "Safe Shutdown Method D", was issued to instruct the plant operators of this fact. During a review of the main control room copies e.f procedure SE-8 Attachment D, the inspector noted that the procedure change had not been placed in either of the controlled copie The failure to assure that procedures were properly updated to reflect the change is a violation of the requirements of Technical Specification 6.8,1 which requires that written procedures be established, implemented and maintained to control various plant activities. Step 5.6 of Administrative Procedure A-3, Procedure for Temporary Changes to Approved Procedures, requires that the proposer of the change assure that the original of the procedure be placed at the work control station, which is the main control room in this case, and/or notifying personnel affected by the change. The failure to implement this requirement resulted in SE-8 Attachment 0 not being maintained in a current conditio The licensee subsequently incorporated the change to SE-8 into the controlled copies. The licensee is preparing a change to j Administrative Procedure A-3, Procedure for Temporary Changes to ( Approved Procedures, to strengthen the control and distribution of temporary procedure changes. This change will be reviewed in a i
future report (50-352/88-08-01).
I
l
.
. -
. ,
.
. -9-2.5 Fuel Leak As discussed in section 2.3 of this report the licensee identified evidence of a fuel leak on March 25. Since the initial identification of the leak, additional sampling has been performed to more closely monitor the magnitude of the leakage and to minimize any effects of the high radioactivity levels in the reactor coolan Areas which have been subjected to additional sampling are the reactor coolant, main condenser off gas, stack airborne releases, and in plant airborne activity. Although the samples have shown increased radioactivity levels, all have been significantly below the technical specification limit The cause of the fuel leak has not been determined. One possible cause which has been experienced at other boiling water reactors is crud induced localized corrosion (CILC). Further evaluation will be performed during the next refueling outag During the plant shutdown for main condenser cleaning, numerous steam leaks were repaired resulting in reduced in plant airborne radioactivity levels. Additionally, to minimize the effects of the fuel leak, a control rod pattern has been established which will suppress the power in the area of the core where the defects have been identified. Reactor coolant radioactivity levels were monitored closely as the plant power was increased following the outage. Power is being held at 85% for additional evaluation. The resident inspectors are continuing to monitor licensee action .0 Surveillance Observations (61726)
,
'
During this inspection period, the inspector reviewed in progrets surveillance testing as well as completed surveillance packages. The inspector verified that surveillances were performed in accordance with licensee approved procedures and NRC regulation The inspector also terified that instruments used were within calibration tolerances and lr. hat qualified technicians performed the surveillance :
phefollowingsurveillanceswerereviewed:
fit-6-107-590-1 Daily Surveillance Log
- iT-6-092-311-1 Monthly 0-11 Diesel Run 3T-6-092-314-1 Monthly 0-14 Diesel Run 25T-3-107-790-1 Control Rod Scram Tests j5T-5-070-885-1 Isotopic Offgas Analysis Uo violations were identifie .
. .
.
. -10-4.0 Maintenance Observations (62703)
The inspector reviewed the following safety related maintenance activities to verify that repairs were made in accordance with approved procedures and in compliance with NRC .vgulations and recognized codes and standards. The inspector also verified that the replacement parts and quality control utilized on the repairs were in compliance with the licensee's QA progra Work Order Number Description 8800544 D-14 Diesel generator remote / local switch troubleshooting 8801811 D-14 Remote / local switch repair 8801385 Hydraulic control unit wiring inspections 8802156 Hydraulic control unit wiring repairs 4.1 Scram Pilot Valve Wiring During an inspection of the Unit 2 hydraulic control units (HCUs),
deficiencies were found in the scram pilot valve junction box wirin The types of problems found were:
-
improper crimping of lugs
-
broken wire strands
-
water tight seals on conduit missing Based on this finding the Unit 1 scram pilot valve junction boxes were inspected and similar problems were identified. The licensee prepared a safety evaluation to determine if the wiring problems adversely affected the safe operation of Unit 1. The safety evaluation concluded that short circuits or open circuits caused by the wiring problems would, in the worst case, result in the scram pilot valves deenergizing, thus fully inserting the control ro Based on this conclusion and a determination that the wiring problems could not affect the ability of the reactor protection system to automatically scram all of the control rods the licensee determined that Unit I could operate safely until the wiring problems are fully evaluated and correcte The inspector identified a concern that in the event of an inadvertent single rod scram with the plant at full power, prompt operator action may be necessary to ensure technical specification thermal limit requirements are not violated. The licensee revised procedure ON-104, Control Rod Problems, to clarify the immediate operator actions to be taken in the event of a scrammed ro .
. .
.
.
-11-During the April 8-22 outage, the wiring for 20 HCUs was reworke The remainder will be corrected at a future dat No violations were identifie .0 Review of Periodic and Special Reports (90713)
Upon receipt, the inspector reviewed periodic and special reports. The review included the followi19: inclusion of information required by the NRC; test results and/or supporting information consistent with design predictions and performance specifications; planned corrective action for resolution of problems, and reportability and validity of report informatio The following periodic report was reviewed:
-
Unit 1 Monthly Operating Report - March 1988 The inspector had no questions concerning this repor *
6.0 Licensee Event Report Followup (90712, 92700)
The inspector reviewed the following LERs to determine that reportability requirements were fulfilled, immediate corrective action was taken, and corrective action to prevent recurrence was accomplished in accordance with technical specification This LER discusses a component failure that rendered the High Pressure Coolant Injection (HPCI) system inoperable for 31 hours3.587963e-4 days <br />0.00861 hours <br />5.125661e-5 weeks <br />1.17955e-5 months <br /> and 21 minutes. The failed component, tte discharge pressure transmitter, was discovered while conducting quarterly surveillance test ST-6-055-230-1 (HPCI Pump, Valve and Flow Test). The cause of the failure was attributed to the failure of an internal amplifier boar The transmitter was n placed a by another of the same model and was tested satisfactorily. Other safety related systems were operable and if required, the HPCI system could have been used without the benefit of a minimum flow valve which was affected by the failed pressure transmitte The inspector had no further questions regarding this matte This LER discusses the discovery of missing fire rated internal seals in electrical conduit penetrating several fire barriers separating safe shutdown fire area Upon discovery, the licensee posted fire watches and patrolled the areas until proper fire seals were installed 23 days late The licensee has su sequently conducted additional investigations that have not turned up any l additional missing seals. Investigations are continuing into the l reason for the missing seals which the licensee will report in a supplement to this LER.
'
The LER supplement will be reviewed in a subsequent inspection.
l t
. . - . -. - _ . . _ , . . .__ .
.. .
. .
.
.. -12-88-009
,
This'LER discusses a reactor water cleanup. system isolation as discussed in section 2.3 of this report (March 24). The licensee replaced the relief valve and is investigating the reason'for the lifting of the origina The inspector had no further question ,
This LER discusses a reactor closure isolation as discussed in section 2.3 of this report (March 26). The inspector had no further question This LER discusses a reactor water cleanup system isolation as discussed in section 2.3 of this report (March 26). -
i 7.0 Assurance of Quality i
During this assessment period there were licensee actions in support of p assurance of quality as evidenced by the followin . The licensee removed the unit from service to perform cleaning of the condensers to increase efficiency and to repair air in-leakage
known to be in the minimum flaw bypass around the main feed pump . After identification of the degraded fuel cladding, the licensee took the appropriate action by first assessing the off gas limits and technical specification limits for radioactive releases. ' ben by
, reducing power to limit off gas releases and power per line foot :
'
of fuel, and finally by control rod manipulations to ident fy the location of the degraded fue . During the plant restart the licensee was very sensitive to limiting power increases and control rod configurations in order co keep the degraded fuel at a lower power level in accordance with 1E
- guidelines for operating with degraded fue .0 Exit Interview (30703)
The NRC resident inspectors discussed the issues in this report
,
throughout the inspection period and summarized the findings at an exit
- meeting held with the Vice President, Limerick Generating Station, on April 28, 1988. No written inspection material was provided to licensee representatives during the inspection period.