Forwards Safety Insp Rept 50-352/88-08 on 880311-0430 & Notice of Violation.Temporary Procedure Change That Could Have Resulted in Delay in Emergency Diesel Generator D-14 Operation Categorized by 10CFR2,App C Severity Level
ML20154F672
Person / Time
Site: Limerick Constellation icon.png
Issue date: 05/11/1988
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20154F676 List:
References
NUDOCS 8805240022
Download: ML20154F672 (2)


See also: IR 05000352/1988008

Text

-

,,

.

.

.

11MAY E8

Docket No. 50-352

Philadelphia Electric Company

ATIN:

Mr. C. A. McNeill

Executive Vice President-Nuclear

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Inspection 50-352/88-08

This letter transmits the routine resident safety inspection by Messrs. T.

Kenny and L. Scholl from March 11, 1988 - April 30, 1988 at the Limerick

Generating Station, Limerick, Pennsylvania.

The inspection consisted of

document reviews, interviews, and observation of activities.

The results have

been discussed with Mr. Graham Leitch of your staf f.

The inspec'. ors identified a concern with regard to procedure changes. Two

examples are identified in section 2 of this report (stram solenoid valves

section 2.3 and HPCI operation section 2.2.1).

Changes were mide to procedures

for a specific purpose but after the fact the operators did not fully appreciate

why the procedures were changed nor did the operators recognize the problem

which caused the procedures to be changed.

This area should be reviewed by

plant management in order to correct the concern.

Based on our inspection, a violation of administrative controls resulted in a

temporary procedure change not being entered in a special event procedure.

This error could have caused a delay in operating the D-14 emergency diesel

generator in the local mode.

This violation has been categorized by severity

level according to 10 CFR Part 2, Appendix C (Enforcement Policy).

You are

required to respond to this violation and in preparing your response you

should follow the instructions in Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the Public Docu-ent Roem.

The response directed by this

letter and the acccmpanying notice are not subject to the clearance procedures

of the Office of Management and Budget as rcquired by the Paperwork Reduction

Act of 1930, PL 96-511.

Your cooperation is appreciated.

Sincerely,

SDY* h[

Edward C. Wen:inger, Chief

Projects Branch No. 2

Division of Reactor Projects

OFFICIAL RECORD CCPY

IR LIM 1 88-03 - 0001.0.0

05/11/88

8805240022 880511

d

a i l

PDR

ADOCK 05000352

'

OI '

O

DCD

-

.

.

.

e

Philadelphia Electric Company

-2-

11 MAY 1988

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region ! Inspection Report 50-352/83-08

cc w/ encl:

John S. Kemper, Sr., Senior Vice President-Nuclear Services

G. M. Leitch, Vice President, Limerick Generating Station

Troy B. Conner, Jr. , Esquire

Eugene J. Bradley, Esquire, Assistant General Counsel

W. M. Alden, Director, Licensing Section

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

Region ! Docket Room (with con.urrences)

Management Assistant, DRMA (a/o encl)

Jim Linville, Section Chief, DRP

Brent Clayton, EDO Office

Dick Clark, NRR Project Manager

Tom Johnson, SRI, Peach Bottom

Bob Gramm, SRI, Limerick 2

J. H. Williams, Project Engineer

3

j

RI:DRPGhR

Rh RP

z?

P

.{1Wenzinger

Williaks/rh1

Linvillw

1

5/jf/SS

5/(/88

5/tl/ES

OFFICIAL RECORD COPY

IR LIM 1 88-08 - 0002.0.0

05/06/S8

.