Proposed Tech Specs Ensuring That 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility
ML20154G560
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/07/1998
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20154G550 List:
References
NUDOCS 9810130225
Download: ML20154G560 (3)


Text

'

',

  • NPL 98-0766 Attachment 4 .

EDITED TECHNICAL SPECIFICATION PAGES TECHNICAL SPECIFICATION CHANGE REOUEST 207 LIMITING CONDITIONS FOR OPERATION UNDERVOLTAGE REACTOR TRIP POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 l

9810130225.981007 N PDR ADOCK 05000266; P PDR g3.

~: . -

2) Cold Shutdown The reactor is in the cold shutdown condition when the reactor has a shutdown margin of at least 1 percent Ak/k and reactor coolant temper-ature is s200*F.
3) ~ Refueling Shutdown L The reactor is.in the refueling shutdown condition when the reactor is subcritical'by at least 5 percent Ak/k and T,., is $140*F. A refueling shutdown refers to a shutdown to move fuel to and from the reactor Core.
4) Shutdown Margin '

Shutdown margin is the instantaneous amount of reactivity by which the reactor core would be subcritical if all withdrawn control rods were tripped into the core but the highest worth withdrawn RCCA remains fully withdrawn. If the reactor is shut down from a power condition, the hot shutdown temperature should be assumed. In other cases, no change in temperature should be assumed. .

h. -Power Ooeration '

j -The reactor is in power operating condition when the reactor is critical and l

the. average neutron flux of the power range instrumentation indicates '

greater than 2 percent of rated power.

i. Refuelina Ooeration-Refueling operation is any operation involving movement of core components (those that could affect the reactivity of the core) within the containment when the vessel head is removed.
j. Rated Power

. Rated power is here defined as a steady state reactor core output of 1518.5 MWT."

k. Thermal Power Thermal power is defined as the total core heat transferred from the fuel to the coolant.

l fcr Unit 2. If the ";;;ter C0:ltr.t Sy:ter r:e me::ured t t:1 flew rete is

<174,000 gpm but 1150,500 gpm, Vait 2 tha11 be 14=ited to 598% rat:d p;w;r. -

l

! Unit 1 . Amendment No. tbEE- 15.1-4 Novembo 17, 13;;

Unit 2 - Amendment No.. %9-

TABLE 15.3.5-2(continued) .

1 2 3 4-TOTAL NO. 0F MINIMUM PERMISSIBLE.

NO. OF CHANNELS OPERABLE BYPASS OPERATOR ACTION IF CONDITIONS k FUNCTIONAL UNIT CHANNELS TO TRIP CHANNELS CONDITIONS OF COLUMN 3 CANNOT BE MET Hi Pressurizer 3 2 2" Be in hot shutdown in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />

, Water Level

. Low Reactor Coolant System Flow

a. Low Flow in One Loop 3/ loop 2/ loop 2/ loop"

(>50% full power) Be in hot shutdown in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (any loop)

b. Low Flow in Both Loops 3/ loop 2/ loop 2/ loop" Be in hot' shutdown in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (10-50% full power) .(both loops)

. Turbine Trips

a. Turbine Autostop 3 2 2" Be <50% of rated power Oil Pressure within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 4
b. Turbir.e Stop Valve 2 2 2" Be <50% of rated power Position within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />

. Steam Flow-Feedwater 2/ loop 1/ loop 1/ loop Be in hot shutdown in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Flow Mismatch

. Lo Lo Steam Generator 3/ loop 2/ loop 2/ loop" Be in hot shutdown in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Water Level (input to reactor trip) 4KV Bus (A01 and A02)

a. Undervoltage (input 2/each- 1/each _1/eac Be in hot shutdown in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to reactor trip) bus bus bus
b. Underfrequency 2/each 1/each 1/each Be in hot shutdown in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />

, bus bus bus Unit 1 - Amendment No. -t&f- Page 2 of 3 Unit 2 - Amendment No. -HEF Occc.;Lcr 0,1000

_ _ - _ _ _ _ - _ - - - _ _ _ _ _ _ _ _ - - _ _ _ - _ _ _ - - _ _ - _ _ - _ - _ _ _ . _ . - _ _ - _