ML20154R103

From kanterella
Revision as of 08:15, 22 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Temporary Exemption Granting Relief from 10CFR50.54(w)(5)(i),requiring Licensees to Obtain Insurance Policies That Prioritize Insurance Proceeds Re Stabilization & Decontamination After Accident
ML20154R103
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/29/1988
From: Lo R
Office of Nuclear Reactor Regulation
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20154R106 List:
References
NUDOCS 8810040163
Download: ML20154R103 (3)


Text

_ _ _ _ _ _ _

DISTRIBUTION Docket file NRC POR September 29, 1988 r/

T. Murley/J. Sniezek (12G18)

D. Crutchfield (12G18)

S. Varga (14E4)

Docket No. 50-261 G. Lainas E. Adensam R. Lo P. Anderson Mr. E. E. Utley OGC Senior Executive Vice President E. Jordan (MNBB3302)

Power Supply and Engineering & B. Grimes (SA2)

Construction T. Barnhart (4) (P1-37)

Carolina Power & Light Company ACRS (10)

Post Office Box 1551 GPA/PA Raleigh, North Carolina 27602 ARH/LFliB

Dear Mr. Utley:

SUBJECT:

H. B. ROBINSON STE/Ji ELECTRIC PLANT, UNIT NO. 2 - TEMPORARY EXEMPTION FROM THE SCHEDULAR REQUIREMENTS OF THE PROPERTY INSURANCE RULE EFFECTIVE OCTOBER 4, 1988 (10 CFR 50.54(w)(5)(i))

The Cormission has issued the enclosed temporary exemption from the schecular requircrrents of the property insurance rule effective October 4, 1988 (10 CFR 50.54(w)(5)(i)) for H. B. Rcbinson Steam Electric Plant, Unit No. 2. This part of the rule requires licensees to obtain insurance policies that prioritize insurance proceeds for stabilization and decontamination after an accident and provide for payment of proceeds to an independent trustee who would disburse funds for decontamination and cleanup before any other purpose. [

The Commissionschedule the implctentation has prcposed for 18 a revision months (53of FR1036338, CFR 50.54(w)(5)(i)

September 19, extending 1988 ).

However, because it is unlikely that this rulemaking action will be completed by October 4,1988, the Cornission is issuing a temporary exemption from the requirements of 10 CFR 50.54(w)(5)(i) until completion of the pending rulemaking extending the irplementation date specified in 10 CFR 50.54(w)(5)(1), but not later than April 1,1%9. Upon completion of such rulenaking, the licensee shall ccrrply with the provisions of such rule.

grants a temporary extnption The from Connission, the schedularpursuant to 10ofCFR requirements 50.12(a),

10 CFR 50.54(w)hereby(5)(1).

This temporary exerrption is valid until April 1,1969 or until such time as action on this rulemaking is completed, in granting the exenption, the staff has determined that this action is authoriztd by law and will not endanger life or property or the coercr. defense and security and is othenvise in the public interest.

0Foi 8810040163 800929 1 PDR ADOCK ObO ,

r

6

  • f tr. E. E. Utley .E-A copy of this exerption is being forwarded to the Office of Federal Register for publication.

Sincerely, Original signed by L. L. Kintner for Ronnie H. Lo, Senior Project Manager Project Directorate II.1 Division of Reactor Projects 1/I!

Enclosure:

As stated cc w/ enclosure:

See next page i

, /.

'DFC  :  : RPR :  :  :  :

LA:FD3

. :f . .: .(:0RPR:D:

'021 :

.....:....hj.

NAME : pan L ;.RLo:ch sfnsam  :  :  :  :

1 .....:...........;{............:...........:............:............:............:...........

DATE : 9/f7/88 a 9/1l/88  : 9/) 88  :  :  :  :

/[

OFFICIAL RECORD COPY y , ,- .- .

Hr. E. E. Utley Carolina Power & Light Company H. B. Robinson 2 j cc:

Mr. R. E. Jones, General Counsel Mr. Dwayne H. Brown, Chief Carolina Power & Light Company Radiation Protection Branch i P. O. Box 1551 Divisicn of Facility Services  :

Raleigh, North Carolina 27602 Department of Human Resourc.es L 701 Barbour Drive Mr. licCuen Morrell, Chairman r i Darlington County Board of Supervisors Mr. Robert P. Gruber J

County Courthouse Executive Director  :

Darlington, South Carolina 29535 Public Staff - NCUC P.O. Box 29520 ,

I Mr. H. A. Cole Raleigh, North Carolina 27626-0520 Special Deputy Attorney General  !

State of North Carolina Mr. C. R. Dietz >

P.O. Box 629 Manager, Robtrson Nuclear Project Raleigh, North Carolina 27602 Department i H. B. Robinson Steam Electric Plant Mr. D. E. Hollar P. O. Box 790 Associete General Counsel Hartsville, South Carolina 29550 3 Caroline Pcwer and Light Ccrpany .

P.O. Box 1551 Raleigh, North Carolina 27602

U.S. Nuclear Regulatory Connission i Resident Inspector's Office i

, H. B. Robinson Steam Electric Plant  ?

Route 5 Box 413

! Hartsville,SouthCarolina 29550

) Regional Acministrator, Region 11  !

! U.S. Nuclear Regulatory Commission i 101 Marietta Street l Suite 2900 Atlanta, Georgia 30323

! (

Mr. R. Morgan i Ge wral Manager  !

! H. B. Robinson Steam Electric Plant f Post Office Box 790 <

Hartsville, South Carolina 29550 t Mr. Avery Upc'hurch, Chaircan Triangle J Council of Covernments i 100 Park Drive Post Office Box 12276 l

, Research Triangle Park, NC 27709 l l

(

L _. _ _ _ _ _ _ _ _ _ ____ _ _ _ _ _ _ __ _ _ _ _ ._ _ _. __ _,__a