Forwards Volumes 1-12 to Final Survey Rept for Groups A,B,C Rev 1,D Rev 1,E,F Rev 1 & G-J for NRC Approval in Support of Forthcoming Request for Termination of Fsv 10CFR50 License
ML20134G599
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/30/1996
From: Borst F
Public Service Enterprise Group
To: Weber M
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20134G601 List:
References
NUDOCS 9611130291
Download: ML20134G599 (6)


Text

- .. .-

i. .

i l

O rubiic  ::.: = -

16805 WCR service' 191/2; Platteville, Colorado 80651 October 30,1996 ,

Fort St. Vrain P-96090 t U.S. Nuclear Regulatory Commission l ATTN: Document Control Desk Washington, D.C. 20555 i

ATTN: Mr. Michael F. Weber, Chief Decommissioning and Regulatory Issues Branch ,

Docket No. 50-267

REFERENCES:

1. PSCo Letter, Borst to Weber, dated May 31,1996 (P- i 96041) Initial Final Surwy Report
2. PSCO Ietter, Borst to Weber, dated August 9,1996 (P-96061) Final Surwy Report - Submittal of Second Report
3. PSCo I2tter, Borst to Weber, dated September 11, 1996 (P-96068) Proposed Sampling and Surwy Planfor Efluent i

Pathway Si. dCT: Final Survey Report - Submittal of Third and Final Report

Dear Mr. Weber:

This letter submits for NRC approval the last of three reports that document the final radiological condition of the Fort St. Vrain Generating Station (FSV), in support of a forthcoming request for termination of the FSV 10 CFR Part 50 license. The first two phases of this FSV Final Survey Report were submitted via References 1 and 2.

3 Completion of Final Survey 4

lg

a. With completion of the Final Survey, as documented in all three submittals, Public

- Service Company of Colorado (PSCo) considers that, as required by 10 CFR 50.82(f):

-ac 1. Decommissioning activities have been carried out in accordance with the approved FSV Decommissioning Plan and decommissioning order, and

A/ Ale At tLL 4 I #

h

't , - 2 120005 Ti: FI/e(3dv ne &< .

9 4 l

f P-96090 ,

L October 30,1996 j

Page 2  ;
2. 'Ihe Final Survey Report and associated documentation thoroughly demonstrate that the FSV facility and site are suitable for release for >

. unrestricted use. l

,8 Final survey activities were performed in acevidiir,ce with the FSV Final Survey Plan and

. implementing procedures. Survey measurements, instrumentation, personnel training, i data analysis, quality control measurements, and documentation were all performed by

, our decommissioning contractor, the Westinghouse Team / Scientific Ecology Group, Inc.  ;

- (SEG), in accordance with approved program requirements, with one exception. In the  ;

. liquid effluent pathway, soil samples and survey measurements were ta k eni n accordance j with a specifically developed survey plan, that allows survey efforts to be more focused  !

i in areas where contamination is most likely to be found. PSCo requested NRC approval [

j of the effluent pathway survey plan in our letter of September 11,1996 (Reference 3). l

PSCo recognizes that effluent pathway survey data collected in advance of NRC approval

!- is subject to revision, based on NRC comments that may be forthcoming. However, we i consider that the effluent pathway survey plan is appropriate for the FSV Final Survey, l and believe that any comments can and will be satisfactorily resolved.

Quality Assurance Ovendght t

! As described in the previous two final survey reports, PSCo performed significant quality assurance and oversight activities, including audits and monitorings of selected survey

activities, to provide further confidence in the report results. This effort involved field

' observations, calculation verifications, and documera reviews. In addition, we retained

a third party to perform ir "+;-:+ht verification surveys. All of these efforts are
documented in the enclosed report.

i I Resubmittal of Infonnation From Mrst Two Reports i

This final submittal of the FSV Final Survey Report provides survey results for all remaining surfaces and structures, systems, open land areas, and the liquid effluent pathway. Information from the first two submittals is, in general, not re-submitted.

4 However, a small amount of material in the enclosure to this letter is intended to replace material from previous submittals, with the following explanation:

  • Replacement material is included in Binder 3 of 32 in the enclosure to this letter.

2 This binder is distinguishable from the others by a neon green cover insert, entitled " Replacement Sections for Previously Submitted Reports."

h *- Binder 3 includes introductory material for the three Survey Groups that were '

only partially submitted previously, Groups C, D, and F (Volumes 4, 5, and 7, o- , n - ,- - n- , _ , .-.. . , , , , ,y __._.n._._,___ __,

-- - . . . - - . . ~ - . . - - - . . . _ . - . . - . -.. .- _.

i

.;. . r I

P-96090 j October 30,1996 t Page 4 I Volume 2 Final Surwy Repon for Gmup A. This volume was submittal 'n its {

entirety with the first phase report, Reference 1, and is NOT included  ;

l' herewith. Volume 2 contains the survey results and Release Records for - l j Buildings and Areas Outside the Restricted Area. The report for the 11  !

i Group A Survey Areas is included in 2 books. I i

i Volume 3 Final Surwy Repon for Gmup B. This volume was submitted in its ,

i L entirety with the first phase report, Reference 1, and is NOT included l

herewith. Volume 3 contains the survey results and Release Records for .

Buildings and Areas Inside the Restricted Area. The report for the 17  !

l Group B Survey Areas is included in 2 books. l Volume 4 Final Surwy Reponfor Gmup C, Revision 1. This volume contains a l summary of survey results and the Release Records for the Turbine  !

Building. The remaining 21 of 57 Survey Areas that were not included  !

j with the first or second phase report submittals, and the updated Sections  ;

1 through 5 as discussed above, are included herewith. The entire  ;

}

Volume 4 consists of 7 books. l
i' s
Volume 5 Final Surwy Reponfor Gmup D, Revision 1. This volume contains a summary of survey results and the Release Records for Unaffected Plant  ;

i Systems. The remaining 13 of 21 Survey Areas that were not included j with the first or second phase report submittals, and the updated Sections j

1 through 5, are included herewith. The entire Volume 5 consists of 3 l books. )

l Volume 6 Final Surry Reponfor Gmup E. This volume contains a summary of  !

survey results and the Release Records for the Effluent Discharge Flow
Path, Basins / Ponds / Lagoons, and Surrounding Grounds. All 14 Group E Survey Areas are included, in 2 books.

I Volume 7 Final Surwy Reponfor Group F, Revision 1. This volume contains a summary of survey results and the Release Records for the Reactor '

I Building. The remaining 105 of 156 Survey Areas that were not included

, with the first or second phase report submittals, and the updated Sections

! I through 5, are included herewith. The entire Volume 7 consists of 19

books.

Volume 8 Final Surwy Reponfor Gmup G. This volume contains a summary of survey results and the Release Records for Affected Plant Systems (External to the PCRV). All 10 Group G Survey Areas are included, in i 2 books.

i

1 .

l P-96090 'i October 30,1996 Page 3 respectively). The introductory material is included in Sections 1 through 5 in-the first book of each Survey Group, and includes descriptions of activities and .

a summary of the survey _ statistics, for that specific Group. This information '

was revised to include the additional activities described in this final submittal.

  • Binder 3 also includes replacement cover and spine inserts for all of the books in Volumes 4, 5, and 7, since the total number of bucks in these volumes changed  ;

with this submittal. These replacement inserts reflect the fact that Volume 4 now i includes 7 books versus the original 4; Volune 5 new ir,cludes 3 books versus the  ;

original 1; and Volume 7 now includes 19 books versus the original 5. l t

  • Holders of previous copies of Volumes 4,5, and 7 are requested to replace the i material in Sections 1 through 5, Revision 0, in the first book of each volume l with the material included herewith in Sections 1 through 5, Revision 1. Also, j please replace the binder cover inserts and spine with those provided in this  !

submittal.

  • Binder 3 also includes the Repower Area Final Survey Report, for completeness.  !

This report was previously approved by the NRC on July 17, 1995.

Maal Survey Report Overview i The following is an overview of each of the 12 Volumes, encompassing a total of 46 i binders, that constitute the FSV Final Survey Report:

l l

Volume 1 FinalSunty, Description andResults, Revision 2. This submittal includes l i a complete replacement of the summary report, and is contained in two )

books. Volume 1 provides an overview of facility decommissioning and  ;

dismantlement activities, survey methodologies, and survey results.

l Volume 1 also includes two attachments: l

  • Attachment 1, Supplement 2 describes PSCo's Final Site Survey  ;
- Quality Assurance and Oversight Activitics subsequent to the second phase report (Reference 2); descriptions of previous Quality Assurance and Oversight Activities were provided with References j j 1 and 2. )

i

!

  • Attachment 2, Supplement 2 consists of an Independent -

i Verification Survey Report, documenting survey activities 1 i performed for PSCo by GPU Nuclear subsequent to the second I

phase report (Reference 2); descriptions of previous GPU Nuclear survey activities were provided with References 1 and 2.

i 1

I l

l

l P-96090

October 30,1996 l Page 5 l i l Volume 9 Final Surwy Reponfor Givy H. 'Ihis volume contains a summary of l l survey results and the Release Records for PCRV Internal Surfaces and l l' Embedded Piping. All 7 Group H Survey Areas are included, in 2 books.  ;

i 1

! Volume 10 Mnal Surwy Reponfor Group I. This volume contains a summary of j survey results and the Release Records for Open Imd Areas, .

Miscellaneous Buildings and Systems. All 15 Group I Survey Areas are  !

included, in 3 books.  ;

i

! Volume 11 Final Surwy Reponfor Grey J. This volume contains a summary of (

survey results and the Release Records for Penetrations. All 4 Group J i Survey Areas are included, in 1 book.  ;

t i

Volume 12 Final Surwy Reponfor the Repower Area. This report was previously i approved by the NRC on July 17,1995, and is included for completeness.

i As discussed above, this report is included in a binder entitled e

! " Replacement Sections for Previously Submitted Reports." A separate l 3

cover insert and spine are also included for Volume 12. j I Conclusion  ;

i

! PSCo has thoroughly reviewed the attached information and affirms that it represents the  ;

final as-surveyed condition of the FSV facility, and plant configuration as of this date.  ;

4 To support confirmatory survey and review activities by the NRC, survey locations will  ;

be maintained for the areas covered by this report for at least 30 days. If you desire a  !

longer confirmatory survey and review period, please contact us before the end of this j l Period.  ;

If you have any questions regarding this information, please contact Mr. M. H. Holmes

at (303) 620-1701, i

) Sincerely, j i

$$ 'd- -

Frederic Borst  ;

Decommissioning Program Director

, e

FJB/SWC  ;

i  !

i l Enclosure