Forwards First Installment of Info for Phone Call Re Response to Open RAIs
ML20117N840
Person / Time
Site: 05200003
Issue date: 05/06/1996
From: Winters J
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Kenyon T
NRC
Shared Package
ML20117N226 List:
References
NUDOCS 9606250017
Download: ML20117N840 (11)


Text

_ ..____ ._ _ _ _ _

i s FAX COVER SHEET Westinghouse W

.Y .z= NNN5}IhN~ ^ r[h5s55559 $b *i5  ?? N . z. MkNk5= 1 SENDER;iNFORMATR)Ws;!

& ECIPIENEINFORMATJONMei#~#i

..~.s. sg  ; gs, -sn , er:.:.cq

=w . .~seg p.aw : @e -1: .. vg;

. ~~~

3.,....  ; . ~.. .. ,.

~

.. s. .. . .

DATE: m ,/ oc,f99/, _

NAME: L y,m LOCATION: ENERGY CENTER .

TO:

EAST L Og .

Office:412.-??4- srpo FACS! MILE:

PHONE:

PHONE: . _ _

Facsimile: win: 284-4887 COMPANY:

outside: (412)374-4887 L/ S A//lc, LOCATION:

Cover + Pages

  • P l+10-Tho following pages are being sent from the Westinghouse Energy Center, East Tower, Munroeville, PA. If any problems occur during this transmission, please call:

WIN: 284-5125 (Janice) or Outside: (412)374-5125. _

COMMENTS:

Ilere. a [-sn+ na sis tlonut o C ide Ge Tiuesdut's pk eeIl.

Idh wall &<wis c.und 1 w RArt as noA .

Pm. 9.2.-t l M.u l a b.m [rc muse s 410 293.

Psu. 41a a 2. a s n nsn , e ~,..& I

. e c o. e w ses 38-(, A 3 B-9 arebuo Ier,-u m rn 6 40.2M or174a.J psant. -o r to.4.9- t {nn)

$ni hus a re. resse-c.1 es.-< m io re us ed.

9606250017 960613 PDR ADOCK 05200003 A PDR 0 3 DdN 01 id33 N9153G 009de Woda gg; : g gg, g ggy C((,

1 i \ W4 }"

9. A0xhary Systems n ,; a ,

)

i pmcessed in the demineralized water transfer and storage system to remove dissolved oxygen.

In addition.to supplying water for makeup of systems which require pure water, the i

demineralized water is used to sluice spent radioactive resins from the ion exchange vessels l

i in the chemical and volume control system (as described in subsection 9.3.6), the spent fuel 1 pool cooling system (as described in subsection 9.1.3), and the liquid radwaste system (as '

I described in section 11.2) to the solid radwaste system.

h denuneralized water treatment system is described in subsection 9.2.3.

9.2.4.1 Design Basis 9.2.4.1.1 Safety Design Basis h deminerahzed water transfer and storage system serves no safety-related function other than contamment isolation, and therefore has no nuclear safety-related design basis except for containment isolation. See subsection 6.2.3 for the containment isolation system.

9.2.4.1.2 Power Generation Design Basis

+ he demineralized water transfer and storage system provides deminerahzed water j i through the demineralized water storage tank to fill the condensate storage tank and to i meet required demands and usages of demincralized water in other plant systems.

  • The demineralized water transfer pumps provide adequate capacity and head for the distribunon of demineralized water.

l . De deminerahzed water storage tank supplies a source of demineralized water to the I

chenucal and volume control makeup pumps during startup and required boron dilution I

evolutions. De demineralized water transfer and storage system supplies the required I

amount of water to the chemical and volume control system for reactor water makeup.

1

  • De oxygen content of water supplied to the demineralized water distribution system from the demineralized water storage tank is 100 ppb or less.

I 1

  • Sufficient storage capacity is provided in the condensate storage tank to satisfy condenser i makeup demand based on maximum steam generator blowdown operation during a plant I startup duration.

!

  • De condensate storage tank provides the water supply for the startup feedwater pumps I during startup, hot standby, and shutdown conditions.
  • De condensate storage tank provides a sufficient supply of water to the startup feedwater i system to permit 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of hot standby operation, followed by an orderly plant I

cooldown from normal operating temperature to conditions which permit operation of the i

normal residual heat removal system over a pedod of approximately 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

L-Revision: 6 March 29,1996

$@ 9.2 21 200*390d 38f4 01 1833 f49IS3G 009dd WOdd 15:8 96. 9 ASW

I t NRC REQUEST FOR ADDmONAL INFORMATION eB&*#$b3 gm Ouestion 410.292 In Section 10.4.9.2.1 of the SSAR (Revision 4), Westinghouse changed the pump capacity of the stanup feedwater system to two 50-percent from two 100-percent pumps. Section 10.4.9.1.2 of the SSAR Item 11. states that two startup feedwater pumps are provided with a single pump capable of satisfying the startup feedwater system flo for decay heat removal. Justify how a single Spercent capacity pump (with one pump in standby) can satisfy th flow demand and redundancy requirements.

Response

The Stanup Feedwater Pump po: tion of SSAR subsection 10.4.9.2.2, Revision 6,is now consistent with subsection 10.4.9.1.2. Each startup feedwater pump can supply 100 percent of the required flow to the steam generators to meet decay heat requirements.

SSAR Revision: NONE w PRELIMINARY

- w 4

0 410.292-1 C00*399d OdN 01 Id3D NDI530 009dv Woda 49:8 96. 9 >Su

gr w

3. Design of Structures, Comronents, Ihulpmrt end Systems I reactor plants (which have not experienced streu corrosion cracking in the auxiliary stainless
i steel piping).

l 1 Main Steam Line and Main Feedwater Line I The rnain steam piping is constructed from ferritic steel. Stress corrosion cracking in ferritic I steels commonly result from a caustic environment. A source of a caustic environment in the I main steam piping would be moisture carryover from the steam generator. However, the I secondary side water treatment utilizes all volatile treatment. All volatile treatment effectively I precludes causticity in the steam generator bulk liquid environment. For some operating I plants prior to implementing all volatile treatment, the phosphate water treatment caused a I caustic chemical imbalance resulting in stress corrosion cracking of steam generator tubing.

I Under all volatile treatment water treatment conditions, there is no instance of caustic stress I corrosion cracking on the ferritic steam lines indicating no significant caustic carryover. De I operating secondary side chemistry precludes stress corrosion cracking on the ferritic main i steam line.

I l Stress corrosion cracking is not expected to occur in the main feedwater ime piping because 1 of control of the oxygen to very low levels. There has been no experience with stress.

I corrosion cracking in feedwater lines in operating plants of Westinghouse design. De l operating secondary side chemistry precludes stress corrosion cracking on the main feedwater I line.

1 I Based on the above discussion, stress corrosion cracking does not have an adverse effect on I the integrity of AP600 leak-before-break piping systems.

I l 38.2.3 Water Hammer 1

l Primary Loop Piping i

i ne reactor coolant loop is designed to operate at a pressure greater than the saturation 1 pressure of the coolant, thus precluding the voiding conditions necessaiy for water hammer I to occur. De reactor coolant primary system is designed for Level A, B, C. and D (normal, I upset, emergency, and faulted) service condition transients. The design requirements are I conservative relative to both the number of transients and their severity. Relief valve I actuation and the associated hydraulic transients following valve opening have been considered I in the system design. Other valve and pump actuations cause relatively slow transients with l 1 no significant effect on the system dynamic loads.

I l 1 To provide dynamic system stability, reactor coolant parameters are controlled. Temperature l l during normal operation is maintained within a narrow range by control rod positioning.

I Pressure is controlled within a narrow range for steady-state conditions by pressurizer heaters I and pressurizer spray. De flow characteristics of the system remain constant during a fuel I cycle. He operating tram.ients of the reactor coolant system primary loop piping are such

' that significant water hammer loads are not expected to occur.

Revision: 7 3B-5 APril 30,1996 3 Weli$tghouli8 t' 00 ' 3 O d d ?dN 01 Id33 NOl93G 009dS WOdd e c, : 8 96. 9 wu i

3. Desip of Structures, Compon nts, Equiprnent cnd Systems

! Auxiliary Stainless Steel Piping I

I The passive core cooling system and automatic depressurization system are designed to I minimize the potential for water hammer induced dynamic loads. Design features include:

I I

  • Continuously sloping core makeup tank and passive residual heat exchanger inlet lines I to eliminate local high points 1

1 - Inlet diffusers in the core makeup tanks to preclude adverse steam and water interactions l

  • Vacuum breakers in the discharge lines of the automatic depressurization valves

! connected to the pressurizer I

l De AP600 pressurizer spray control valve is similar to what is used in the operating plants.

I nere is no history of water hammer caused by the spray control valve.

1 I The normal residual heat removal system isolation valves are slow closing valves, identical I to operating plants, and therefore would not be a source of water hammer.

I l Rese features minimize the potential of water hammer in the auxiliary stainless steel piping I system.

I i Main Feedwater Line 1

l The feedwater piping, steam generator design details, and c'.her component (.'etails in the i feedwater system are designed to minimize the potential and severity of water hanmer within I the feedwater piping. De following addresses each aspect of the design incoprated to I minimize water hammer.

I l Steam Generator Design: De AP600 steam generator design benefits from investigation of I water hammer events and the resulting design changes developed to address the events 1 (References 4 through 8).

I i

  • Top discharge feed flow through spray tubes (similar to J-tubes) from the feedring I reduces the potential of void formation when the steam generator level drops below the i feedring level. Previous steam generator feedring designs had incorporated bottom i discharge holes that permitted feedring draining whenever the steam generator level I dropped below the feedring.

I l

i

  • Feedwater nozzle design incorporates a welded thermal liner attached to the feedwater i nozzle forging to form a positive seal to limit the potential for feedring drainage and I therefore void formation within the feedring. Previous designs had included a "close fit" Revision: 7 April 30,1996 3B-6 *[ W86tingh00$6 500*390d ?dN 01 id3D N9153G 009de Wodd 89:e 96, 9 yeu

I pm i

3. Desigi of Struct:res, Cosoponerts, Eq11pment cnd Systems f

_ _J l but not a complete seal at the connection to the nozzle forging. The welded thermal  ;

I liner design has no leak paths within the steam generator through which the water can i l drain from the feedring. l l Feedwater piping design: The AP600 feedwater piping layout has incorporated features to i limit void formation and water hammer initiation.

I 1

  • A downward facing elbow is connected to the steam generator nozzle and thus complies I with industry recomrnendations to minimize the horizontal feedwater piping connected I to the steam generator. The short horizontal section minimizes amount of steam void I which can form.

I l

  • He muis feedwr.ter piping inside containment continuously rises to the steam generator I pmviding for natural venting of the steam generator in the event a steam void is formed.

I l

  • Long straight piping runs in the feedwater line are limited.

I I Component and system design selection:

I I - A major cauw of water hammer problems in pressurized water reactor feedwater systems I has been control valve instability. Rese instabilities resulted from factors such as I oversized valve, unbalanced valve trim, damage to valve components, and incompatibility I of the feedwater control valve with the rest of the feedwater system. These problems are I minimized on AP600 by the following:

1 1 -

De specification of specialized vahe trim to avoid instability i

I - ne use of variable speed feedwater pumps to reduce the demands on the control I valve requirements l

1 - Reduced contml requirements on the main feedwater control valve by the use of a l stanup feedwater line that provides feedwater flow control from either the stanup 1 feedwater pump or the main feed pump at lower feed demand (power) levels.

I i - Main feedwater control valve positioning during normal oper. tion is the function I of the plant control system (see subsection 7.7.l.8) using a refinement of a standard I three element control scherne. ne control scheme provides greater steam generator i level stability and thus reduces potential feedwater transients.

I I - Rapid closure of some types of feedwater check valves may potentially cause water I hammer in main feedwater lines. The controlled closure check valve specified for the

! AP600 main feedwater lines limits the magnitude of the closing loads generated by vatve I closure caused by depressurization of the feedwater line upstream of the check valve.

\

Revision: 7 3B-7 April 30,1996 3 WOEdnghouse 900'390d 3dN 01 Ad3? N9153G 009dd WOdd SG 8 96. 9 Aeu

', f t" W'~~m

3. Design of Structures, Componen?., Equipment and Systems

[

1-

)

i I

I heated feedwater is normally at least 250*F and heips teduce the possibility of water I hammer.

I l l

i l - Startup feedwater is piped directly to the steam generator. His feature helps prevent the 4

1 need to introduce cold water directly into the main feedwater and thus minimizes the l l chances of steam water counterflow or steam bubble collapse type of water hammer l 4

! events.

I

I + Rapid resumption of feedwater flow to the steam generators is accomplished in the

~

l AP600 design. Numerous options are available to maintain or restore steam generator

. I level with the feedwater system design. Based on the flow demand signal and level of

feedwater isolation either the main feedwater pump (s) or the startup feedwater pumps can I

I l adequately provide level control. If there is no engineered safeguard features feedwater i l isolation signal present, the main feedwater pumps will provide adequate steam generator 2

I inventory control. via the main feedwater line or the startup feedwater line. If a main

! I feedwater isolation signal exists then either the main feedwater pump (s) or the stanup I feedwater pump (s) provides startup feedwater flow via the startup feedwater line.

I 1 ne above design provisions make the potential for steam generator water hammer in the i feedwater line extremely low. However, with consideration for the main feedwater and steam ,

I generator design features, the susceptibility of the main feedwater line inside containment for I water hammer has been evaluated. He most common historic causes were evaluated as well l as the relevant modes of operation for susceptibility to the appropriate water hammer 1 mechanisms (Reference 4). He limiting anticipated and unanticipated events were evaluated.

I ne resuhs of the analysis demonstrate that the system is acceptable for leak before-break I application.

I I Main Steam Line i

l De steam lines are not subject to water hammer by the nature of the fluid transported. The I following system design provisions address concerns regarding steam hammer within the main i steam line and identify the significant dynamic loads included in the main steam piping i design.

I l . Design features that prevent water slug formations are included in the system design and i layout. In the main steam system, these include the use of drain pots and the proper i sloping of lines.

l l . De operating and maintenance procedures that protect against a potential occurrence of I steam hammer include system opera'ing procedures that provide for slowly heating up I (to avoid condensate formation from hotter steam on colder surfaces), operating i procedures that caution against fast closing of the main steam isolation valves except I when necessary, and operating and maintenance procedures that emphasir.e proper I draining.

Revision: 7 April 30,1996 3B-8 y Wes 4v)0086 100'390d Ddu 01 Ad3D N9153G 009de WOdd 00:6 96, 9 Aeu

3. Design of Structures, Components, Equipment End Systems [* %' 1

{

l - The stress analyses for the safety-related portion of the main steam system piping and I components include the dynamic loads from rapid valve actuations, including actuation 1 of the main steam isolation valvss and the safety vvhes 1

I Based on the above discussion, water hammer does not have an adverse effect on the integrity I of AP600 leak-before-break piping systems.

I 38.2.4 Fatigue I

l Low-Cyene Fatigue 1

I Low cycle fatigue due to normal operation and anticipated transients is accounted for in the i design of the piping system. The Class I piping systems comply with the fatigue usage I requirements of the ASME Code,Section III.

1 I A fatigue evaluation at the main feedwater nozzle equivalent to ASME Class I piping is

! performed. Also. a fatigue crack growth analysis at the main feedwater nozzle is performed.

I l Due to the nature of operating parameters, main steam line piping systems are not subjected I to any significant transients to cause low-cycle fatigue.

I l Based on the above discussion, lo w-cycle fatigue is not a concem of AP600 leak-before-break l piping systems.

1 I High-Cycle Fatigue i i i High-cycle fatigue loads in the system result primarily from pump vibrations. He steam I generator is designed so that flow induced vibrations in the tubes are avoided (see I subsection 5.4.2). The loads from reactor coolant pump vibrations are minimized by criteria l for pump shaft vibrations during hot functional testing and operation. During operation, an I alarm signals when the reactor coolant pump vibration is greater than the limits.

J I

l Main feedwater pump vibration is isolated from the leak before-break feedwater line inside  ;

I I containment via the piping and equipment supports.

l i

I With these precautions taken, the likelihood of leakage due to fatigue in piping systems i evaluated for leak before-break is very small.

I i 3B.2.5 Thermal Aging i

l Stainless Steel Piping 1

I Piping used in the reactor coolant loop and other auxiliary lines are wrought stainless steel I materials, rather than cast materials, so that thermal aging concems are not expected for the i AP600 piping and fittings. The welds used in the assembly of the AP600 are gas tungsten I arc welds (GTAW). Dese welds are essentially as resistant to the effects of thermal aging Revision: 7 3B-9 Airil 30,1996 T Westinghouse 800*39ed ?dt4 01 183D tJ91530 009dd WOdd 00:6 96. 9 Aell l l

The Main Feedwater Line portion of SSAR Appendix 3B, subsection 3B.2.3, Revision 7, provides a more detailed discussion of the AP600 design features for mininuzing water hammer. includmg piping layout features. As indicated in SSAR subsection 5.4.2.2, the starup feedwater piping layout includes the same feamres as the main feedwater piping layout. As indicated thoughout SSAR subsection 10.4.9, the startup feedwater system is sized, operated and has water sources consistent with mimminng the potential for water hammer.

SSAR Revision: None

  1. k tf ,

pse/

r*

l 600'30ed DdN 01 id3:' NDIS3G 009de WOdd 10:6 96. 9 J.e u i

l

f 1 l

l In Revision 6 of the SSAR, sections 10.4.9.2.1 and 10.4.9.2.2 have been revised to be consistent with the first bullet of section 10.4.9.1.2. 'Ihe main feedwater system and the startup feedwater i system are parallel systems. The main feedwater system draws water from the deserator' tank and delivers it to the main feed rings within the steam generators. The startup feedwater system draws l water from the enr*nme storage tank and delivers it to the startup feedwater nozzle on the steam I

generators. They have a manual cross-connect between their respective pumps and control valves.

This will allow the main feed pumps to supply water from the deaerator tank to the stattup feedwater nozzles on the steam generators. A check valve (in addition to the normally closed isolation valve) in the cross-connect prevents the stanup feedwater pumps from supplying water from the condensate storage tanks to the main feed header and steam generator main feed rings.

SSAR Rev: None f'$

l So",A v'w }C l

OIO*390d 3dt1 01 id3? ff 9I53G 009dd WOdd 20 6 96. 9 Aeu

~

SSAR subsectiom 10.4J.1.1 and 10.4.9.1.1, Revision 7, include a more consistent description of safety related functions of the main and startup feedwater control and isolation valves. Subsection 10.4.7.1.1 discusses only main feedwater system functions and components. Subsection 10.4.9.1.1 discusses only startup feedwater functions and components. Bullet sections of subsection 10A.9.1.1 are imW to reenforce the first paragraph of the subsection. Startup feedwater isolation valves close on any of comainmmt isolation, steam generator isolation or feedwater isolation signals. They can also be closed by a remote manual signat SSAR Revision: None h e%' p $ 0 2.9 3 v2' I10 396d 3dtt og d33 N9153G 009de WOdd -