1 T}ylp+ %5
- vq
& on 3 g
UNITED STATES g
j NUCLEAR REGULATORY COMMISSION o
e WASHINGTON, D.C. 20055-4001 8
%,..... f September 15, 1998 Mr. Brian A. McIntyre, Manager Advanced Plant Safety and Licensing Energy Systems Business Unit Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355
SUBJECT:
REQUEST FOR WITHHOLDING PROPRIETARY INFORMATION -WCAP-14135, " FINAL TEST REPORT FOR PCS LARGE-SCALE TESTS, PHASE 2 AND PHASE 3"
Dear Mr. McIntyre:
By letter dated July 20,1998, the staff requested that Westinghouse review its claim and to notify the staff with regard to what portions of WCAP-14135. Revisions 1, Westinghouse considered company proprietary. The basis for this request was that the staff was unable to determine what information was considered proprietary and in some cases why it was considered proprietary due to an inconsistency in, or lack of, proprietary markings. The nonproprietary version of the document revealed information that was marked as proprietary; the nonproprietary and proprietary versions of the documents indicated different reasons for the proprietary claim; and the drawings contained in WCAP-14135 Revision 1, were marked as proprietary, however, the reasons the drawings were considered proprietary was not indicated.
By letter dated August 21,1998, Westinghouse provided a consistent rationale for their proprietary claim and established the reasons for maintaining the drawings included in WCAP-14135 as proprietary. Also, in a letter dated August 26,1998, Westinghouse agreed to remove the proprietary claim from the information presented in WCAP-14135, Revision 1, Sections 1 and 2, and to provide revised pages for sections 1 and 2 of WCAP-14135, Revision 1, and WCAP-14138 with the proprietary markings removed. On the basis of this commitment, the staff has decided to accept the claim that the information in WCAP-14135, Revision 1, is proprietary and will be withheld from public disclosure.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You should also understand that the NRC ko l4 I
9809170091 980915 PDR ADOCK 05200003 9\\
P PDR
~
l 4
,139 E W MfA M
l Mr. Brian A. McIntyre
-2'--
September 15, 1998 5
may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request included your information. In all review situations, if the NRC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, original signed by:
Dino C. Scaletti, Project Manager i
Standardizatio' P niect Directorate Division of Rea-Program Management Office of Nuclear Reactor Regulation Docket No.52-003 cc: See ne t page DISTRIBUTION-Docket File PDST R/F TQuay PUBLIC TKenyon WHuffman JSebrosky DScaletti JNWilson ACRS (11)
JMoore,0-15 B18 MPSiemien,0-15 B18 i
l DOCUMENT NAME: A: PROP-W 27A
. To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with r ttachment/ enclosure "N" = No copy l
OFFICE PM:PDST:DRPM,l OGC n l0 PDST:DRPM l l
j NAME DCScaletti:sdh MPSiemien@7 TRQuay P 09/%/98 09/6 /98 DATE 09/f/98 OFFICIAL RECORD COPY i
l i
i l
1 e*
Mr. Brian A. McIntyre Docket No.52-003 l
Westinghouse Electric Corporation AP600 l
l cc:
Mr. H. A. Sepp Mr. Russ Bell Advanced Plant Safcty & Licensing Senior Project Manager, Programs Westinghouse Electric Corporation Nuclear Energy Institute Energy Systems Business Unit 1776 i Street, NW P.O. Box 355 Suite 300 Pittsburgh, PA 15230 Washington, DC 20006-3706 Ms. Susan Fanto Ms. Lynn Connor Advanced Plant Safety & Licensing Doc-Search Associates Westinghouse Electric Corporation Post Office Box 34 Energy Systems Business Unit Cabin John, MD 20818 P.O. Box 355 Pittsburgh, PA 15230 Dr. Craig D. Sawyer, Manager Advanced Reactor Programs Mr. Sding Franks GE Nuclear Energy U.^. Department of Energy 175 Curtner Avenue, MC-754 NE-50 San Jose, CA 95125 19901 Germantown Road Germantown, MD 20874 Mr. Robert H. Buchholz GE Nuclear Energy Mr. Frank A. Ross 175 Curtner Avenue, MC-781 U.S. Department of Energy, NE-42 San Jose, CA 95125 Office of LWR Safety and Technology 19901 Germantown Road Barton Z. Cowan, Esq.
Germantown, MD 20874 Eckert Seamans Cherin & Mehott 600 Grant Street 42nd Floor Mr. Charles Thompson, Nuclear Engineer Pittsburgh, PA 15219 AP600 Certification NE-50 Mr. Ed Rodwell, Manager 19901 Germantown Road PWR Design Certification Germantown, MD 20874 Electric Power Research Institute 3412 Hillview Avenue Mr. Robert Maiers, P.E.
Palo alto, CA 94303 Pennsylvania Department of Environmental Protection Bureau of Radiation Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469