NSD-NRC-98-5748, Forwards Rev 24 of AP600 Ssar.Revised Tables of Contents, Change Page Instructions,List of Effective Pages,Document Cover Sheet & Change Roadmap Outlining Changes in Each Section Also Encl.Rev Submitted Under Encl Oath

From kanterella
Jump to navigation Jump to search
Forwards Rev 24 of AP600 Ssar.Revised Tables of Contents, Change Page Instructions,List of Effective Pages,Document Cover Sheet & Change Roadmap Outlining Changes in Each Section Also Encl.Rev Submitted Under Encl Oath
ML20197B956
Person / Time
Site: 05200003
Issue date: 08/07/1998
From: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Quay T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20197B960 List:
References
NSD-NRC-98-5748, NUDOCS 9809030045
Download: ML20197B956 (3)


Text

_ - -

- ?,

Westinghouse Energy Systems Basss Electric Corporation Pittsburgh Pennsylvama 15730 03th DCP/NRCl404 NSD-NRC-98-5748 Docket No.: 52-003 August 7,1998 Document Control Desk i U.S. Nuclear Regulatory Commission Wr.shington, DC 20555 ATTENTION: T. R. QUAY i SUlijECT: REVISION 24 OF Tile AP600 STANDARD SAFETY ANAL.YSIS P.EPORT

Dear Mr. Quay:

linclosed is Revision 24 of the AP600 Standard Safety Analysis Repori(SSAR). Also enclosed are the j revised tables of contents, change page instructions, list of clTectis e pages, document cover sheet, and a I change roadmap outlining the changes in each section. Page changes are in the fonn of replacement l pages. The document cover sheet should be inserted in the front of Volume 1; the original document l cover sheets should not be discarded. Twenty five copies of this update are beic; sent to Joe Sebrocky for distribution to the NRC stafT. As discussed with your staff, copies are being sent directly to NRC subcontractors.

The changes in this revision are the result of responses to NRC technical staff comments and AC'(S issues, c~ onsistency and ITAAC development.

All infonnation in Revision 24 of the AP600 SSAR is nonproprietary.

Pursuant to 10 CFR 5030(b), this revision is submitted under the enclosed oath or affinnation Picase contact me if you have any questions concerning this transmittal.

~-

0x /#"

lirian A. McIntyre, Manager Advanced Plant Safety and Liccasing jml Attachmeats Enclosure t

.9809030045 980807 PDR ADOCK 05200003 A PDR

~

,- . lX'PbRCl404 NSD NRC 98 5748 August 7,1998 cci Nils J. Diaz, NRC

. Tom Kenyon, NRC (w/o Enclosures)  !

Chuck Thompson, DOE ~ l M. Darger, DOE - Oakland, CA (w/o Attachments and Enclosures) l llank A. Sepp, Westinghouse (w/o Attachments and Enclosures)

Joe Sebrosky, NRC(25 Enclosures)

- Ken Quitoriano, DOE -

l l

l I

I i

l

}

UNITED STATliS OF AMiiRICA 4'

NUCLEAR REGULATORY COMMISSION in the Matter of: )

)

Westinghouse Electric Company, )'

)+

- A Division of CBS Corporation )

)

AP600 Standard Plant Design ) , Docket No. 52 003

) \'

. Final Design Approval and Design )

)

' Certification application - )

APPLICATION FOR REVIEW OF "AP600 STANDARD SAFETY' ANALYSIS REPORT" FOR FINAL DESIGN APPROVAL AND DESIGN CERTIFICATION Charles W. Pryor, Jr. being duly sworn, states that he is President and Chief Executive Officer of Westinghouse Electric Company, a Division of CBS Corporation; that he is authorized on the part of said corporation to sign and file with the Nuclear Regulatory Commission this document; that all statements made and matters set forth therein are true and correct to the best of his knowledge,

' information and belief.

WESTINGliOUSE EL RIC COMPANY, A DIV I N OF CBS RFORATION By: .

Alu kN Charles W. Pryor, Jr.

President and Chief Executive Officer Westinghouse Electric Company, A Division of CBS Corporation Subscribed and sworn to before me this "1" day

. of $2AAu4f i998.

W

&MW.fyi>an Notary Public #

Ndadal Seal '

terreine M. Ppca. Neary Pubuc My commeston EM w u  :=a ==n f410H AM WPF .

b i i i. . . .. . . . . . . . . . .

- - - - - - - - - - - - - -