Forwards Rev 3 of AP600 Design Control Document, Incorporating Documentation Changes Resulting from Final Review Performed to Check Consistency of Implementation of Approved Design Change Proposals.With Summary of Changes
ML20216J068
Person / Time
Site: 05200003
Issue date: 09/29/1999
From: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Joshua Wilson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20216J072 List:
References
DCP-NRC1455, NUDOCS 9910040174
Download: ML20216J068 (8)


Text

_ __ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

y, y ,

[ ~ ,h v

Westinghouse Box 355 Electric Cornpany Patsburgh Pennsylvania 152304355 DCP/NRCl455 Docket No.: 52-(X)3 September 29,1999 Document Control Desk U.S. Nuclear Regulatory Commission Washington,DC 20555 ATTENTION: J. N. WILSON

SUBJECT:

AP600 DESIGN CONTROL DOCUMENT. 9/99 REVISION

Dear Mr. Wilson:

l 1

Enclosed are twenty copies of the 9/99 revision (3) of the AP600 Design Control Document (DCD). One j copy is for the docket file. Mr. Jerry N. Wilson of NRR will pmvide the appmpriate distribution for the other nineteen copies. One copy of this AP600 Design Contml Document revision is being pmvided directly to Mr. Wilson for his use in developing the AP600 design certification rule. This DCD provides the reference basis for the AP6(X) design certification rule.

This submittal incorporates documentation changes resulting from a final review performed to check the consistency of the implementation of approved design change proposals, ongoing detailed design work on systems, structures and components outside the scope of design certification and commitments made in the final stages of the design certification review. As a result of this review, several documentation inconsistencies were noted and corrected. In addition, one change to the description of the plates above the recirculation pump screens was necessitated by the location of other nearby hardware. None of the items would change the conclusions of the design certification review. These changes were discussed with the NRC technical staff at a meeting on September 2,1999.

Attachment 1 provides a summary of the changes made as a part of the 9/99 revision to the AP600 Design Control Document. There are no technical changes to the AP600 design as a result of this revision.

Attachment 2 provides the page change instructicas to incorporate the enclosed 9/99 revision into the AP600 Design Control Document.

Pursuant to 10 CFR 50.30(b), this revision is submitted under the attached oath or affirmation.

Please contact me if you h any questions conccming this transmittal.

Brian A.McIntyre,1 Advanced Plant Safety and Licensing

'1/

Attachments -

Enclosure -

hl2lY l 0 9910040174 990929 PDR ADOCK 05200003 b$

A VDR p(b l[l)lo }.

n ,

l-:

l. -

\

October 1,1999

'[ Nots told Document Control Desk 9

From: Jerry N. Wilson -

lh Division of Regulat pr ement Programs Office of Nuclear or egulation

SUBJECT:

DISTRIBUTION OF AP600 DCD CHANGES Please distribute the attached 19 copies of the 9/99 revision to the AP600 DCD, as follows:

Docket File 52-003 NRC PDR NOAC ACRS-6 NRR/ DRIP /RLSB NRR/ DRIP /RTSB NRR/DIPM/lOLB NRR/DIPM/lOMB

) NRR/DSSA/SPLB NRR/DSSA/SRXB NRR/DSSA/SPSB NRR/DE/EMCB NRR/DE/EMEB NRR/DE/EElB I

l i

1 j

.Y

g

);if ,1 L UNITED STATES OF AMERICA '

(. NUCLEAR REGULATORY COMMISSION In the Matter of: -)

)

Westinghouse Electric Company LLC, )

4

-)

1 AP600 Standard Plant Design : -)- Docket No.52-003

)

Design Certification application )

APPLICATION FOR REVIEW OF AP600 DESIGN CONTROL DOCUMENT" l FOR DESIGN CERTIFICATION

!. -Howard J. Bruschi, being duly sworn, states that he is Vice President and Chief Technology Officer of I ' Westinghouse Electric Company LLC, that he is authorized on the part of said company to sign and i file'with the Nuclear Regulatory Commission this docummt; that all statements made and matters set fonh therein are true and correct to the best of his knowleJge,information and belief.

WESTINGHOUSE ELECTRIC COMPANY LLC, By
. . _/ ,  !:

Howard J. Bruschi Vice President and Chief Technology Officer Westinghouse Electric Company LLC Subscribed and swom to before me this OHh . day

- of September,1999.'

.. b N.I '

Notary Public' cj4

,) (" N _ '

f .i ,

@ NotarialSeal -

Susan H. Piper. Notary Public y Churchill Boro. ADegherny County i My Commissiort Expires May 17,2001 3

h Member, Pennsytvanit Association W Notanes~

lt J, %, > { 'd '

a ,

24 0630B AM.WPF, a

Enclosure 1 toletter DCP/NRCl455 -

l AP600 DESIGN CONTROL DOCUMENT SEPTEMBER 1999

SUMMARY

OF CHANGES L

t i

l 1;

i

AP600 DESIGN CONTROL DOCUMENT

' SEPTEMBER 1999

SUMMARY

OF CHANGES PAGE SECTION DESCRIPTION Tier 1 material Tier 1 material Correct the description of the plate located above the 2.2.3-21. 2.2.3, Table containment recirculation screen 2.2.3-4, vii Tier 1 material Tier 1 material Correct the description of the coating area under the plate i 2.2.3-22 2.2.3, Table located above the containment recirculation screen j 2.2.3-4, viii )

i 1.9-13 1.9.3 Correct quote from 10 CFR 50.34(f)(2)(viii) 1.9-14 1.9.3 Correct quote from 10 CFR 50.34(f)(2)(viii) 3.7-191 Figure 3.7.2-12 Make consistent with room drawings (Sheet 2 of 12) 3.8 3.8.3.6.1 Make text description consistent with figure 3.8.314 3.8-133 Figure 3.8.3-1 Change drawing to allow space to weld guard pipe -

(Sheet iof 3) Constructibility issue 3.8-134 Figure 3.8.3-1 Make consistent with PXS screen design (Sheet 2 of 3) 3.8-151 Figure 3.8.3-7 Make consistent with Figure 3.8.3-5, Sheet 1 (Sheet 1 of 9) 3.8-155 Figure 3.8.3-7 Make consistent with room drawings (Sheet 3 of 9) 3.8-157 Figure 3.8.3-7. Make consistent with room drawings (Sheet 4 of 9) 3.8-159 - Figure 3.8.3-7 Make consistent with Figure 1.2-7

, (Sheet 5 of 9)

J.8-161 Figure 3.8.3-7 Make consistent with room drawings (Sheet 6 of 9) 3.8-163 Figure 3.8.3 7 Make consistent with room drawings (Sheet 7 of 9) 6.2-47 6.2.4.2.2 Change value of maximum hydrogen concentration from 1.5 to 2.2 %

6.2-52 6.2.4.3.3 Change time flammability limit is reached from 28 ous t to 12 days 6.2-129 Table 6.2.4-5 New containment temperature and corrosion rate data 6.2-156 Figure 6.2.4-1 Update hydrogen generation curve to reflect final WGOTHIC analysis 6.2-157 Figure 6.2.4-2 Update hydrogen generation curve to reflect final WGOTHIC analysis 6.2-158 Figure 6.2.4-3 Update hydrogen generation curve to reflect final WGOTHIC 4 analysis 6.2-159 Figure 6.2.4-4 Update hydrogen generation curve to reflect final WGOTHIC analysis ,

I 6.3 1 8 6.3.2.2.7.1 Make description of the plate located above the containment l

recirculation screen consistent with Tier 1 material 6.3-21 6.3.2.2.7.3 Make description of the plate located above the containment recirculation screen consistent with Tier 1 material 6.3-53 6.3.7.6.2.3 Add text to correct an inconsistency concerning the PRHR HX inlet MOV power lockout 6.3.70 Table 6.3-3 Change table note to correct an inconsistency concerning the PRHR HX inlet MOV power lockout 6.3-88 Figure 6.3-8 Make outline of plate located above the containmsnt recirculation screen consistent with Tier 1 material 6.3-89 Figure 6.3-9 Make elevation of plate located above the containment recirculation screen consistent with Tier 1 material 9A-81 9 A.3.1.3.1.2 Correct spelling of the word " fire" 9A-82 9A.3.1.3.1.3 Correct fire area numbering 9A-83 9A.3.1.3.1.3 Correct spelling of the word " fire" 9A-217 Figure 9A-3 Make figure consistent with text (Sheet 1 of 3) 9A-219 Figure 9A-3 Make figure consistent with text l (Sheet 2 of 3) 12.3-57 Figure 12.3-2 Include rest of post-accident access route (Sheet 2 of 15) 3.5-11 16.1.1 Add technical specification surveillance requirement for PRHR

HX inlet MOV power lockout l B 3.5-23 16.1.1 Add technical specification bases for PRHR HX inlet MOV l power lockout I

-:. ,;g Enclosure 2 toletter DCP/NRCl455

. AP60G DESIGN CONTROL DOCUMENT SEPTEMBER 1999 PAGE CHANGE INSTRUCTIONS I

1

'l i

l~

l

-l l

L' . .j

AP600 DESIGN CONTROL DOCUMENT-9/99 REVISION PAGE CHANGE INSTRUCTIONS Remove Present oaaes Insert Paaes VOLUdB1 AP600 Document Cover Sheet. Revision 2 AP600 Document Cover Sheet. Revision 3 List of effective pages - pages 1 through 47 List of effective pages - pages I through 47 Pages 2.23-21 and 2.2.3.22 Pages 2.2.3-21 and 2.2.3.22 VOLUME 2 Pages 1.9-13 and 1.9-14 Pages 1.9-13 and 1.9-14 VOLUME 4 Page 3.7-191 Page 3.7-191 Pages 3.8-39 and 3.8-40 Pages 3.8-39 and 3.8-40 Pages 3.8-133 and 3.8-144 Pages 3.8-133 and 3.8-144 Page 3.8-151 Page 3.8-151 Page 3.8-155 through 3.8-163 Page 3.8-155 through 3.8-163 VOLUME 6 Pages 6.2-47 and 6.2-48 Pages 6.2-47 and 6.2-48 Pages 6.2-51 and 6.2-52 Pages 6.2-51 and 6.2-52 Pages 6.2-129 and 6.2-130 Pages 6.2-129 and 6.2-130 Pages 6.2-155 through 6.2-160 Pages 6.2-155 through 6.2-160 Pages 6.3-17 and 6.3-18 Pages 6.3-17 and 6.3-18 ,

Pages 6.3-21 and 6.3-22 Pages 6.3-21 and 6.3-22 l Pages 6.3-53 through 6.3-54 Pages 6.3-53 through 6.3-54 ,

Pages 6.3-69 and 6.3-70 Pages 6.3-69 and 6.3-70  !

Pages 6.3-87 through 6.3-89 Pages 6.3-87 through 6.3-89  ;

Pages 9A-81 through 9A-84 Pages 9A-81 through 9A-84 Pages 9A-217 through 9A-219 Pages 9A-217 through 9A-219 VOLUME 9 Pages 12.3-57 and 12.3-58 Pages 12.3-57 and 12.3-58 VOLUME 11 Pages 3.5-11 and 3.5-12 Pages 3.5-11 and 3.5-12 Pages B 3.5-23 and B 3.5-24 Pages B 3.5-23 and B 3.5-24 l