Affidavit of Vl Gonzales Supporting Applicant Motion for Summary Disposition of Joint Intervenors Contention 10.5 Re Environ Qualification of Asco Solenoid Valves.Certificate of Svc Encl
ML20127A200
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/29/1985
From: Gonzales V
BECHTEL GROUP, INC., GEORGIA POWER CO.
To:
Shared Package
ML20127A182 List:
References
OL, NUDOCS 8508050481
Download: ML20127A200 (27)


Text

f~

l l

v.

, UNITED STATES OF AMERICA l NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD DC3ETED In the Matter of  : U%RC GEORGIA POWER COMPANY, et al.  : D ggNos. 50-424

'85 NE -2 50-425 (Vogtle Electric Generating  :

Plant, Units 1 and 2) gj g ;: g u; ;, l 00C^tilMi& MHVK' ERANCH COUNTY OF LOS ANGELES )

)

STATE OF CALIFORNIA )

AFFIDAVIT OF VICTOR L. GONZALES I, Victor L. Gonzales, being duly sworn according to law, depose and say as follows:

1. My name is Victor L. Gonzales. I am employed by Bechtel Power Corporation ("Bechtel") in the position of Equipment Qualification Supervisor. My business address is Bechtel Power Corporation, 12440 East Imperial Highway, Norwalk, California 90650. Attached to this affidavit as Exhibit A is a. summary of my professional qualifications.
2. The purpose of this affidavit is to support the Applicants' Motion for Summary Disposition of Joint Inter-venors' Contention 10.5, which concerns the environmental qualification of solenoid valves used at the Vogtle Elec-tric Generating Plant ("VEGP") manufactured by the Auto-matic Switch Company ("ASCO"). In this affidavit, I will 8500050481 850730 POR 8 ADOCM 05000424 PM 4

4, discuss the environmental qualification of the ASCO sole-noid valves having the model numbers NP8316, NP8320, and NP8321 that were procured for VEGP by Bechtel. This affi-davit will describe the operation of those valves, will review the qualification testing that has been performed on them, will discuss other tests performed on those model valves by Franklin Research Center, and will address the environmental qualification of those solenoid valves for use at VEGP in light of the Franklin Research Center test results. I have personal knowledge of the matters set forth herein and b'elieve them to be true and correct.

I. Operation of the Model NP8316, NP8320, and NP8321 ASCO Solenoid Valves.

3. Bechtel has procured three models of ASCO sole-noid valves, model numbers NP8316, NP8320, and NP8321, for use in safety-related functions at VEGP. ASCO solenoid valves are used at VEGP to control airflow to air opera-tors on air operated process valves and dampers (herein-after " process valve" will be used to refer to process valves and dampers). These solenoid valves may either permit the flow of air to a valve operator, causing the process valve to actuate, or terminate the flow of air to the valve and vent the air operator. By either venting or providing air to the air operator on the process valve, the solenoid-valve enables the process valve to open or close. Figure 10.5-6 depicts a typical configuration of

.s an air operated process valve with its air operator and a solenoid valve. Air operated process valves are used in safety-related applications at VEGp in configurations designed to ensure that the valves assume a " safe" posi-tion, either open or closed, when the valve's air operator is vented.

4. The operation of an ASCO model Np8316 solenoid valve, which is a three-way, internal pilot operated valve, is described in paragraphs 4 through 6 of the Affi-davit of Richard B. Miller dated July 26, 1985.

S. Unlike the model Np8316, the ASCO model Np8320 solenoid valve is a three-way, direct acting solenoid valve. Rather than using an internal pilot, the solenoid core motion directs airflow. Figure 10.5-7 depicts a model Np8320 valve in the energized and de-energized posi-tions. In' the de-energized mode, the solenoid valve core spring forces the core assembly (with valve seat) down, isolating the inlet port and connecting the exhaust port to the cylinder port. In this position, the solenoid valve would allow the air operator on the process value to vent. Energizing the solenoid causes the core assembly to lift up, allowing supply air to pass to the air operator on the process valve and isolating the exhaust port.

6. The ASCO model Np8321 solenoid valve, like the model Np8316 valve, is a three-way, internal pilot con-trolled valve. This model valve operates in a manner

s similar to that of the model NP8316. The primary dif-ferences between the two valves are that the model NP8321

. valve is piston operated and its exhaust orifice is larger than the pressure orifice, which allows relatively rapid venting. On the model NP8316 valve, all of the orifices are the same size and generally larger than those on the NP8321 valve. That allows for higher flow rates through the model NP8316 valve.

II. The Joint ASCO and Westinghouse Qualification Testing Program.

7. In 1980 and 1981, ASCO and Westinghouse jointly performed an environmental qualification testing program for various ASCO solenoid valves. Included among the solenoid valves tested were valves representative of the model NP8316, NP8320, and NP8321 solenoid valves procured by Bechtel for use in safety-related functions at VEGP.

The objective of the qualification testing program was to demonstrate that the ASCO solenoid valves met or exceeded their safety related performance requirements while subjected to simulated normal and accident environments.

8. The joint ASCO/ Westinghouse qualification program was conducted in accordance with the Institute of Elec-trical and Electronics Engineers ("IEEE") Standard 323-1974, "IEEE Standard for Qualifying Class IE Equipment for Nuclear Power Generating Stations;" IEEE Standard 344-1975, "IEEE Recommended Practices for Seismic Quali-

=

l l fication of Class IE Equipment for Nuclear Power Generat-l ing Stations;" and IEEE Standard 382-1972, "IEEE Trial-Use l.

i Guide for Type Test of Class 1 Electric Valve Operators t

j for Nuclear Power Generating Stations."

l l 9. The tests comprising the qualification program L consisted of baseline performance tests; thermal, mechani-

i j cal, and pressurization aging; normal environment radia-l l tion testi'ng; vibration aging, operating basis earthquake j

simulation, and resonance testing; safe shutdown earth-quake simulation; design basis event environmental radia-tion testing; and high energy line break ("HELB") environ-mental' testing (test profile determined by a composite of the loss-of-coolant accident ("LOCA") and main steam line l

break ("MSLB") environmental conditions). The HELB envi- l i

ronmental testing is described in paragraphs 11.through 16 l of Mr. Miller's affidavit. This joint ASCO/ Westinghouse i testing program qualifie'd the ASCO model NP8316 and NP8320 solenoid valves to the environmental extremes profiled on .

Figure 10.5-3. Those extremes included (a) a peak tem-perature of 420*F, (b) pressure of 57 psig, and (c) a ,

chemical spray of 2500 ppm boron buffered with sodium  ;

hydroxide to a pH of 10.5.

10. In the HELB environmental testing, the test valve representative of the model NP8321 valve would not shift to its de-energized position on the twelfth day of the test period. This failure occurred well after that f

l

b portion of the test period that simulated the period of time that the model NP8321 valve would be required to operate at VEGP following a design basis event. The twelve-day period that the model NP8321 valve continued to operate after exposure to simulated accident conditions represents in excess of a year of pos.t-accident opera-tion. That model valve, however, would be required to operate at VEGP-for a period of no more than a few hours after the occurrence of a design basis event.

11. Because of the failure of the model NP8321 valve in the HELB environmental testing, ASCO'does not consider it to be qualified to the environmental extremes profiled i on Figure 10.5-3. Instead, it relies upon an earlier qualification testing program conducted by Isomedix, Inc.

on behalf of ASCO to establish the environmental qualifi-

! cation of the model NP8321 valve.

12. As reported in Isomedix Test Report No.

AQS21678/TR - Revision A, dated July 1979, Isomedix, Inc. .

i performed qualification testing for ASCO on several models j of ASCO solenoid valves, including a valve representative

of the model NP8321 valve. That report states that the testing performed was conducted in accordance with the test outline contained in ASCO Qualification Specification AQS-21678 Revision B, which was based upon IEEE 323-1974, IEEE 382-1972, IEEE 344-1975, and IEEE 382/ ANSI N278.2.1 (Draft 3, Rev. 1 June 1977) " Draft American National

F' l s Standard for the Qualification of Safety Related Valve Actuators." According to the report, the valves tested were subjected to sequential exposures of elevated tem-perature, radiation, wear aging, seismic simulation, vibration endurance, accident radiation, and a 30-day LOCA simulation.

13. Figure 10.5-4 reflects the environmental extremes to which the ASCO valves tested by Isomedix were quali-fled. Those extremes includes (a) a peak temperature of 346*F, to which temperature the valves were exposed for three hours in the Isomedix tests; (b) peak pressure of 110 psig; and (c) a chemical spray consisting of 3000 ppm boron buffered with sodium hydroxide to a pH value of 10.

III. The Franklin Research Center Testing Program,

14. In 1981 Franklin Research Center, under a con-tract from the Nuclear Regulatory Commission ("NRC"),

began a testing program on ASCO solenoid valves. The valves tested by Franklin Research Center included two model NP8316 valves, one model NP8320 valve, and one model NP8321 valve. After performing functional tests, Franklin Research Center artificially aged one of the model NP8316 valves and the model NP8320 and NP8321 valves to simulate a four-year life at 140*F. It irradiated those valves to a total integrated dose of 50 megarads. Following irradi-ation, the valves were exposed to a temperature of 268*F I'

l l

(

l "

l l for approximately fifteen days and were cycled 2000 times l

[

while at that temperature. This artificial aging was l

! significantly more severe than that used in the joint ,

1 ASCO/ Westinghouse testing program, in which the valves were cycled only 200 times at elevated temperatures and 1800 times at room temperature.

15. Following this artificial aging, the model Np8321 valve was removed from the test program because of what Franklin Research Center characterized as " excessive" seat leakage. The rate of the seat leakage encountered by Franklin Research Center with that valve ~ was identified as more than 60 liters per minute at 150 lbf/in'. That l leakage rate, while apparently presenting problems to i

Franklin Research Center due to limitations imposed by its l

test apparatus, is well below any rate that might affect the ability of the model NP8321 valve to perform its

(

safety-related function, as discussed later in this affi-l davit.

l 16. The second model Np8316 valve had been naturally aged by ASCO by exposure to 140*F for three years, and was not irradiated. That valve was cycled 2000 times at room temperature. The two model NP8316 valves and the model NP8320 valve then underwent pressurization testing, vibra-tion aging, resonance search, seismic testing, design l basis event radiation exposure, and a composite simulated MSLB and LOCA exposure.

l l

17. The composite MSLB/LOCA simulation used by Franklin Research Center included two pressure and tem-perature transients, with a targeted peak temperature of 420*F and pressure of 68 psig, as well as steam, chemical spray, and high humidity conditions. Thermocouple data from the test chamber shows that certain areas in the test chamber experienced temperatures higher than the targeted test conditions.
18. Both of the model NP8316 valves failed to cycle properly during the composite MSLB/LOCA simulation. Para-graphs 21 and 22 of Mr. Miller's affidav'it describe the points at which those valves failed to function during the MSLB/LOCA test.
19. The model NP8320 valve tested by Franklin Research Center functioned throughout the tests. Follow-ing the LOCA/MSLB simulation, the model NP8320 valve did experience what Franklin Research Center described as

" severe" seat leakage. At 150 lbf/in' (1030 kPa), the seat leakage exceeded 100 cubic feet per hour. That seat leakage, however, did not prevent the valve from being operated to perform its safety function.

20. Franklin Research Center published a report con-cerning its test results in November 1983, which was entitled " Test Program and Failure Analysis of Class lE Solenoid Valves." NUREG/CR-3424. In April 1984, the NRC 1

f l I staff rcleased IE Information Notice No. 84-23, which dis-  :

i cussed its initial assessment of the Franklin Research i

Center test results.

21. In IE Information Notice No. 84-23, the NRC staff concluded that the test results obtained by Franklin 1 L

( Research Center for the artificially aged valves were  ;

inconclusive due to the severe preconditioning to which  !

those valves had been exposed. The NRC staff decided that the failure of the naturally aged model NP8316 valve, how- [

ever, called into question the prior test results obtained

{

during the joint ASCO/ Westinghouse testing program. That i model ASCO solenoid valve, the NRC staff concluded, was qualified for use only in applications where it would not i be exposed to environmental conditions more severe than -

the conditions to which that model valve had been tested ,

in earlier qualification testing performed on behalf of  ;

ASCO hy Isomedix, Inc. and reported in Isomedix Test l 1

Report No. AQS21678/TR-Revision A, dated July 1979. In t that qualification testing program, the test valves were subjected to a peak temperature of 346*F for three hours.

The NRC staff repeated these conclusions concerning the Model NP8316 valve in IE Information Notice No. 85-08 issued on January 30, 1985.

I r

I t

l f

l

IV. The Results of the Franklin Research Center Testing Program Do Not Call Into Question the Environmental Qualification of the ASCO Model NP8316, NP8320, and NP8321 Solenoid Valves for Use at VEGP.

A. The Model NP8316 Valve.

22. The temperature conditions to which ASCO solenoid valves located inside containment at VEGP must be quali-fled are profiled in Figure 10.5-5. That profile repre-sents a composite of the conditions resulting from a LOCA and MSLB. Inherent in this profile is a margin (differ-ence between qualification profile peak temperature and calculated peak temperature) in excess of twenty degrees based upon calculations performed by Bechtel using a meth-odology consistent with the recommendations of NUREG- ,

0588. As shown by that profile, during such a composite LOCA/MSLB transient the temperature inside containment would peak at 400*F. This peak would last for approxi-mately three minutes.

23. As discussed in paragraphs 26 through 34 of the affidavit of Richard B. Miller, the model NP8316 valves used at VEGP have been environmentally qualified for use under the conditions to which they might be exposed at VEGP by the joint ASCO/ Westinghouse qualification testing program supplemented by a thermal lag analysis performed by Westinghouse. That thermal lag analysis, which accounts for the amount of time necessary for the tem-l

._,,m -__.-.7..__._.______._._.__ _ . _ _ _ _ . - _ _ _ _ _ . .

.s?

,i e

., (;

y r

.,  ! (' 6 '. t' peratur'e i 'of the(valvk to equalize w[th(the surrounding

l+ (/'

env i robman't , demonstrates that under th'e most extreme conditio that could be experienced at VEGP, the tempera-t ,' 9 .,

p 'ture reached-by r ,.

the nodel N98316 solenoid .~

valves inside containment wouldYrht exceed the temperb.ure of 3?6*F [

' \y ,

reached by Gh6 valves in the Isomedix? rest program, due to  !

4 i the short duration of efe pehk temperature extreme in the '

i

' VEGP prodile.i AstheNRCstaffconcludedinIEhnforma-  ;

tion Notica Nos.~A4123 and 85-08, the results of that f ic r ,

test'ing program by Idomedix have not been called into

< e ,

question $5 the valve failures experienced in the Franklin Research'benterqualificat,tontestingundersignificantly more seve:e henvi"ronmenta1 con'ditions.* , ,

e. , i

-t *

3. j*he T ModeltNP8320 Valves.,, I I

q245 . ; 'As noted above, model NPS310 valve tested by

' . c ,

Franklin. 'lesearch Center could be ope; rated to perform its r

safety Yanction throughout the test sequence. While the I

valve exieridnced 3, wbat Franklir.< described as " severe" seat ,

leakage, thbt raat leakago did not make it inoperable.  !

~e ,

t Thesvalve continued to perform its function despite that

.- p ,

j-seat leakaga. The results of'the &tanklin Rese~ arch Center testsonthe,$odelNp832'Jvabethemforedonotcallinto l

question its enviror.oental qualificstien for use at VEGP l under,the joint ASCO/ Westinghouse carting program. ,

~

e l l 25.7 Seat leakage ftom the air supply. system is not a l

\l  ? 1 concern with ASCO solenoid valdes as long as the amount of  !

w P

/

% f  ;

j ,

p t. '

': j i a

\s j

g{ _

leakage does not exceed the capability of the valve to exhaust the incoming air. The leakage encountered by Franklin Research Center for the model NP8320 valve is within the capability of that valve to vent. The flow coefficient through the model NP8320 valve is the same in both positions (supplying air and exhausting air). Given these conditions, any leakage past the seat would be exhausted.

26. In a report that it submitted to the NRC staff evaluating the results of the Franklin Research Center tests, ASCO states that it considers the NP series valves to be performing satisfactorily as long as the cylinder l

l port pressure does not deviate by more than 10% of the l applied pressure at the valve inlet port. Fo'r the model NP8320 valve, ASCO conservatively calculated the minimum r seat leakage that would have to occur to reach that I

defined threshold of acceptability to be 151 SCFH. That.

I level of leakage is significantly greater than the leakage rate of approximately 100 SCFH experienced by Franklin i

[ Research Center with the model NP8320 valve that it tested.

C. The Model NP8321 Valves.

27. The model NP8321 valves used at VEGP have been shown to be environmentally qualified for use in the con-ditions that they might experience at VEGP by both the joint ASCO/ Westinghouse qualification testing program and the prior qualification program performed by Isomedix, s.

Inc. on behalf of ASCO. Although the test valve repre-sentative of the model NP8321 valve failed during the HELB environmental testing in the joint ASCO/ Westinghouse qualification program, that failure did not occur until I i

twelve days'into the test sequence, a period which simu- )

lated in excess of a year of post-accident operation.

More importantly, however, the model NP8321 performed successfully throughout the qualification testing per-formed by Isomedix, Inc.

28. That testing qualified the model NP8321 valve to the envi ronmental extremes profiled on Figure 10.5-4.

Unlike the model NP8316 and NP8320 valves, the model NP8321 valve is not used inside containment at VEGP.

Therefore, the adverse conditions to which it must be environmentally qualified are less extreme. Those con-ditions, which are profiled in Figure 10.5-8, are enveloped by the conditions to which the model NP8321 valve was qualified by the Isomedix testing program.

29. The seat leakage encountered by the Franklin Research Center with the model NP8321 valve that it tested k

does not call into question the environmental qualifica-tion of that model valve for use at VEGP. As indicated above for the model NP8320 valve, seat leakage does not affect the ability of an ASCO NP ser'ies valve to perform its safety-related function unless the leakage is of a magnitude that would significantly affect the valve

  • O cylinder port pressure. For its defined threshold of acceptability of a deviation in cylinder port pressure of more than 10% of the applied pressure at the inlet port, ASCO calculates that seat leakage would have to reach 380 l

liters per minute (805 SCFH) to significantly affect the model NP8321 valve's cylinder port pressure. The leakage rate reported by Franklin Research Center for the model NP8321 valve that it tested was 60 liters per minute when the valve was energized (200 ml/ min when de-energized),

which rate is significantly less than the amount conservatively calculated by ASCO to be necessary to affect the valve's operability.

V. Other Recently Identified Problems With ASCO Solenoid valves Do Not Apply to the Model NP8316, '

NP8320, and NP8321 ASCO Solenoid Valves Used in Safety-Related Functions at VEGP.

30. Two IE Information Notices recently issued by the NRC staff have noted potential problems.with ASCO solenoid valves. The potential deficiencies described in those notices, however, are not applicable to the model NP8316, NP8320, NP8321 valves procured by Bechtel for use at VEGP in safety-related functions.
31. IE Information Notice 85-08, dated January 30, 1985, stated in pertinent part:

ASCO NP series solenoid valves with resilient seats and Viton elastomers may be considered qualified only for those applications in which the valv.es are not required to shift position following exposure to total gamma radiation doses greater than 20 megarads up to 200 megarads. No qualification data are available for j applications in which the radiation dose exceeds 200 I megarads gamma.

While some of the model NP8320 and NP8321 solenoid valves used in safety-related functions at VEGP do have resilient seats and Viton elastomers, none of those valves are used in applications that would require a shift in valve posi-tion after the valve had been subjected to a total gamma dose greater than 20 megarads. IE Information Notice f

i 85-08, therefore, does not raise any issue about the qualification of those valves.

32. IE Information Notice 85-17, issued on March 1, 1985, discussed sticking problems encountered at a boiling water reactor with model HTX'8323-20V ASCO solenoid valves. That model valve has a different solenoid from and is not similar to the model NP8316, NP8320, and NP8321 valves utilized at VEGP. No HTX series ASCO solenoid valves are used to perform safety-related functions at VEGP.

VI. Conclusion.

33. Bechtel has supplied to VEGP three models of ASCO solenoid valves, model numbers NP8316, NP8320, and NP8321, for use in safety-related functions. The model NP8320 valve has been shown to be qualified for use in the

' environmental conditions to which it might be exposed at VEGP by the joint ASCO/ Westinghouse qualification testing program. The conditions to which that model valve was tested in the ASCO/ Westinghouse program exceeded the most severe conditions to which that valve might be subjected at VEGP. The testing conducted by the Franklin Research Center provided additional confirmation of that valve's environmental qualification.

34. The environmental qualification of the model NP8316 valve for use at VEGP has been demonstrated by that same qualification testing program as supplemented by the thermal lag analysis performed by Westinghouse. That analysis showed that under the most extreme conditions that could'be experienced at VEGP, the temperature reached by the model NP8316 valves would not exceed 346*F, the temperature reached by the valves tested in the Isomedix qualification testing, program.
35. With respect to the model NP8321 valve, the qualification testing program performed by Isomedix, Inc.

establishes its environmental qualification for use at VEGP. The extreme conditions to which the model NP8321 valve was exposed in this testing program envelope the most severe conditions to which that model valve might be exposed at VEGP.

1

36. For these reasons, I am confident that the model NP8316, NP8320, and NP8321; solenoid valves used in safety-related functions at VEGP are environmentally qualified.

Victor L. Gdnzades Sworn to and subscribed before me this J 9.#d- -

day of /Jo #;/ , 1985. OFFICIAL SEAL

  1. l' JOANNE E HENRY

, NOTARY PUSUC CAUFORNIA My mm. erp es V 2,1985 <

' - - - - - - - - - = --- - =;

tary Public l

l

, l

! 1 l

l l

l l

l l

S/

t l

D T e E t

T T NG a n r AS) EN r a LOi l I u te UPC G t

a S M CA 1

A S $

l 1 1 lI I 8 I 4 e 2 il l

3 I

2 IN 1

E, M t t

- E y o a u r a l' p i S s n.

c p t i N s i

t 2 I 5I t s 1 M /

u A

- a - C C

l o.

l 3

N I

M C IM E

1 t

E E M

e l toe C

I T

E G

S S l u 0 o

- il

  • G l

- N t I

5 I i

M T S

a E i W s 1 N p 3 I M

2 7

- 3

+ C -

f 0 1

1 E 5 S .

1 0

m 0

1 2

0 0 s ,

E  %

4 4 0 5 7 0 ,

R -

3 3 5 0 U 2 2 2 ,

1 G

C.u$4"abe

?

s I F

3N$  ;

;< , ji,i,' ;i! j1I ' !*  !

Ii134:i) 4

9

-m 4-27 FIGURE 10,5_4 arwuoca si-a,riou s< envizouusarn g EXPoSLRE (STEAM / CHEMICAL)

Q g

'gd g5 SAYo OE ~ =-

4 c

' I

, c .

k f o

Dy }bu:E

~

Sara .91 ~ = n b u

T ei3

\

!fN

\s u klI k

a aE

~ m y$g a C f rg sara r &

to (

2, 22 = $ $ b<

'JN 2/ -

?

I ug

'3M ii -

( --Q*N to W A.

28 6  :-

3tR as g - $~% %

4 q

'3H 9 = f  %

f &q er f k mn .1 axs Q $ Ef s 2S07] =_ R 2  % y .i w '

.c y 53 e se ayr sm -

- tu -.

g e,;

g,j naso ;

'as z = [ g n 5 ,y a,;y1 es i m

yg q :z nw;

~ ~ e isoi., =

= a't 2

' /

- ~val 4&

10s402 4 @

~

R, '

i Y12 O 2 ' '2" m m u m v u C

SAVO51 i

is a

E -

z

=

a s -

'o aO_

gw

. -- 4

.,** , S W H PZ- _ z=

p' w=

2A

,,a z<

=>

a s# -

p / .n - =w

>z

  1. p' zw

w2

! 'o =z N = -

=E w-r mz 5 -

e z=

3 - u w

eu -

iE 22 I I ==

i l _ w 2

zm

-u C e ~z u

i SN!W SI f I m w-

=

l _

=

i I

cu

_- = m~

w-

/ 1 AW r # 2<

I SN!W 9 gg f SN!W C s i ~

_,, g s

I

_~~ sn

,s I -

a I .

- o I z "

I _

=3

o W I

% v s "= Z

  • w a N -%s, = -

-o sg a

% N

=m A

%g% _- au N N cw w s N ..~w zo

% w =a w f %  % ~ 1>

N C cz N zvw o l ' a .

o o e

  • o o o R O 3a - 3W 01VW 3dW 31 6

- I

\

e- \

l l

l

  • e  ;

I I

,e Air Flov ' Air Supply Solenoid Valve r%

k d Air Opera:or Ven:

HXw Process Valve

-Solencid Valve Providing Air to Air Opera:c 1

Air Supolv ' '

Air ?lcu h Scienoid Valve fh

( y Air Opera:or Vent r><H

? ocess Valve Solencid Valve Ven:ing Air Operator FIGURE 10.5-6 - Typical Operiti:n of Solenoid Cen:ro'.ted A0V

  • o Y h
    • r 1 -

/) 11 -

solen I -

housing coveable-l/ h '

e re gM ] i]

i Solenoid

(! Exhaust ~

Cylin:er Fl.OW r1 g_ C N rn ,

T' "E"

L S' "A" eressure "e" exhaus:

De energized Port

( (5 &

i g',/- ,

f c k

,O

\

!.% y Solenoid Erhaust E

_ . Cylinder now"a - ~

"E" D A"

+ -

+ y

- _9 ' m. r eressure 9 J

e-Energized FIGURE 10.5-7 urz_gz I

s 6

0 1

M l P

P M 0 P 5 P PM I 1

- 5 P 5 0 5 7

E < 1 0

1 N E E ZI D 1 A H lD I l

I l 5

U O L i t 0 1

Yl L UL l

I Cl F l S

L l A

C I

M T N EA l

E l

i El C I M

P Al i

u IUI V l

QF I

EM l 1 l 1 Ex~ I u0 F

V SI NS I

HM l

S i E I U l D N uI S 3 O NN 0 CE I

( I 1

S CN I E E0 M ll l I

I ulA l

AI C I

l F l

I E IL P

M U A r I E a

a T G 2 2 3 0 1

I 8

I -

5 I

0 1

I E

3 R

- 10 U G

I I

F I

f

  • 0!" a. l 0

2 l

1

- _ 0 0

0 0 0 0 0 1 5 0 5 0 0 0 0 3 3 5 0 2 2 1 1 5

". ;$ G*

4 C s " ,2

=a EXHIBIT A V. L. GONZALES EQUIPMENT QUALIFICATION COORDINATOR / SUPERVISOR VEGP PROJECT Bechtel Power Corporation, Western Pow'er Division PROFESSIONAL QUALIFICATIONS EDUCATION .

BS, Mechanical Engineer, California State University, Long Beach, California EXPERIENCE

SUMMARY

Present: Engineering Supervisor 15 Years: Increasingly responsible positions as Mechanical Systems Engineer on nuclear and fossil fueled power projects EMPLOYMENT HISTORY 1970 to present: Bechtel Power Corporation, LAPD SPECIFIC QUALIFICATIONS IN THE EQUIPMENT QUALIFICATION FIELD Five years with the VEGP equipment qualification group.

Mr. Gonzales is presently Engineering Supervisor / Coordinator to the Equipment Qualification Group for the Alvin W. Vogtle nuclear power project. His responsibilities include defining and reviewing electrical / controls / mechanical equipment qualification plans, procedures, and reports for compliance with project qualification documents based on IEEE 323-1974 and IEEE 344-1975 requirements. Since his appointment as Equipment Qualification Coordinator, his responsibilities also include the reconciliation of the overall project qualification program with the nuclear steam supply system (NSSS) vendor (Westinghouse) qualification program to developing NRC guidelines, for all safety-related equipment.

Prior to this, Mr. Gonzales was a Mechanical Group Leader responsible for NRC Standard Review Plan and Regulatory Guide compliance on the Alvin W. Vogtle nuclear power project. In addition, Mr. Gonzales reviewed all mechanical systems to determine their degree of compliance with the

! then-new NRC criteria.

i I

9 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD DOLFETED USNRC In the Matter of  :

GEORGIA POWER COMPANY, et al. :

DOCKET NOS. 50-424 85 AUG -2 P1 :49
50-425 (Vogtle Electric Generating  : GFFit; i; StG3tist Plant, Units 1 and 2)  : 00Cr;ET !g.yE PV n.'

CERTIFICATE OF SERVICE I hereby certify that copies of the Affidavit of Victor L. Gonzales, dated July 26, 1985, were served upon those persons on the attached Service List by deposit in the United States mail, postage prepaid, or where indicated by'an asterisk (*) by hand delivery, this 30th day of July, 1985.

/-

ATVIAA -

4%1AA es E. Joindr torney for h plicants Dated: July 30, 1985 l

t

UNITED STATES OF AMERICA-NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

GEORGIA POWER COMPANY, et al.

) Docket Nos. 50-424

) 50-425 (Vogtle Electric Generating Plant, )

Units 1 and 2) .)

SERVICE LIST Morton'B. Margulies, Chairman

  • Douglas C. Teper Atomic Safety and Licensing Board 1253 Lenox Circle U. S. Nuclear Regulatory Commission Atlanta, Georgia 30306 Washington, D. C. 20555
  • Laurie Fowler Mr. Gustave A. Linenberger Legal Environmental Assistance Atomic Safety and Licensing Board Foundation U. S. Nuclear Regulatory Commission 218 Flora Avenue, N. E.

Washington, D. C. 20555 Atlanta, Georgia 30307 Dr. Oscar H. Paris *Tbn Johnson Atomic Safety and Licensing Board Campaign for a Prosperous Georgia U. S. Nuclear Regulatory Commission 175 Trinity Avenue, S. W.

Washington, D. C. 20555 Atlanta, Georgia 30303 Bernard M. Bordenick, Esquire Docketing and Service Section Office of Executive Legal Director Office of the Secretary U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Washington, D. C. 20555 Commission Atomic Safety and Licensing Board Panel Bradley Jones, Esquire U. S. Nuclear Regulatory Commission Regional Counsel Washington, D. C. 20555 U. S. Nuclear Regulatory Commission Atomic Safety and Licensing Suite 3100 Appeal Board Panel 101 Marietta Street U. S. Nuclear Regulatory Commission Atlanta, Georgia 30303 Washington, D. C. 20555