ML20092H789
| ML20092H789 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/13/1995 |
| From: | Stokes K GEORGIA POWER CO. |
| To: | |
| Shared Package | |
| ML20092H771 | List: |
| References | |
| OLA-3, NUDOCS 9509210185 | |
| Download: ML20092H789 (12) | |
Text
,
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket Nos. 50-424-OLA-3 GEORGIA POWER COMPANY, gj; 31 50-425-OLA-3 Re: License Amendment (Vogtle Electric Generating Plant, :
(Transfer to Units 1 and 2)
Southern Nuclear)
ASLBP NO. 93-671-OLA-3 AFFIDAVIT OF KENNETH C.
STOKES I,
Kenneth C.
Stokes, being duly sworn, state as follows:
1.
I am currently employed by Georgia Power Company as Senior Engineer, Vogtle Electric Generating Plant.
2.
I am duly authorized to verify Georgia Power Company's Fourth Supplemental Response to Allen L. Mosbaugh's Third Set of
)
Interrogatories and Request for Documents.
I hereby certify that the statements and opinions in such response are true and correct to the best of my personal knowledge and belief.
%A c M Kenneth C.
Stokes l
Sworn to and subscribed before me this
/J C day f September, 1995.
Y ##el M
'~tary Public y commission expires:
hJ- /f /997 1
9509210185 950913 PDR ADOCK 05000424 O
PDR i
MWO DATE EDG/ DRYER DEWPOINT PERSON AS$1GNED TO CORRECTIVE ACTION (S)
IN DEGREES F TAKE READWGS 18809080 01/20/89 1AIK01 27.3 D. HUTCHINS NONE NOTED 18901008 03/01/89 1 A/K02 78 J. BROOKS COMPRESSOR NOT COMING ON 03/03/89 1 A/KO2 70 AUTOMATICALLY, FAN IN A BIND.
03/13/89 1A/K02 53.9 J.R.
COMPRESSOR FREON WAS DISCHARGED AND THEN 8tECHARGED.
PURGED RECEIVER. ADDITK)NAL RECEIVER PURGES.
18900984 03/16/89 1 AIK01 22.6 D. ELROD NONE NOTED 1 AIK02 20.1 18901066 05/18/89 1A/K02 78 D. LOHRMAN MWO 18902188 WRITTEN TO INVESTIGATE AND CORRECT PROBLEM WITH K02 19000899 03/09/90 1A/KO1 61 T. WILLIS RETESTED 3/12/90 1 AJK02 66 K01 = 48 K02 = 45 19001513 03/29/90 1 A/KO1 80 D. LOHRMAN CLEANED CONDENSING UNITS, MWO 1A/K02 60 19001651 INITIATED 19001651 04/05/90.1800 EST 1 A/K01 86,78 D. THAMES BLEW DOWN AIR RECE! VERS AND 1 A/K02 67,77 USED DIFFERENT TEST EQUIPMENT.
04/05/90,2030 EST 1 A/K01 63 D. LOHRMAN RETESTED 4/8/90 1 AIK02 85 K01 = 34.2 04/06/90,0005 EST 1 A/K01 85 K02 = 33.2 1A/K02 85 04/06/90,0425 EST 1 A/KO1 85 1 A/K02 85 04/06/90,0930 EST 1 A/K01 80 D. THAMES 1 A/K02 70 04/06/90,1530 EST 1A/K01 80 1 A/KO2 NONE TAKEN 04/06/90,1700 EST 1A/KO1 75 1 A/K02 NONE TAKEN 04/07/90 1AIKO1 75,15,75 D. LOHRMAN 1 A/K02 80,33,78
- - ~ - - ~ - -
'^-
~
MWO DATE EDG/ DRYER DEWPOINT PERSON ASSIGNED TO CORRECTIVE ACTION (S)
IN DEGREES F TAME READINGS 19002652 06/05/90 1 A/KO1 12.9 R.CULPEPPER USED ROOT VALVES WHICH WAS 1 AIK02 10.6 DETERMINED TO REPRESENT A MORE CONSISTENT MOISTURE CONTENT.
RETESTED ON 06/06/90:
K01 - 34.6 K02 = 41.4 18808981 01/12/89 1B/K01 28.7 C. BAKER NONE NOTED 1B/KO2 27.3 18900822 02/21/89 1B/KO1 19 J.STROUSE MWO 18901066 INITIATED 1 B/K02 19.1 18901066 03/08/89 1B/KO1
-2 D. LOHRMAN MWO LEFT OPEN UNTIL PROPER TEST 1B/K02
-12 EQUIPMENT OBTA'NED. RETESTED 03/22/89 1B/K01
-15 05/17/89 1B/K02
-27 K01 =47 K02 = 45 19001770 04/05/90 IB/KO1 84 D. LOHRMAN DC-190186 WRITTEN. WRT 1B/K02 82 WRITTEN. RETESTED 4/8/90 WITH 04/07/90 1B/KO1 85.18,80 DIFFERENT INSTRUMENT:
1B/K02 75,18,82 K01 = 44.5 K02 = 36.6 19002901 06/22/90 1B/K01 80.2 B. BERRY DRYER K01 FOUND NOT RUNNING 19004257 11/06/90 18/KO2 60 B. BERRY DRYER INOPERABLE REF: MWO 11/08/90 64.4 19004394; DC-1-90-408 WRITTEN 19004394 11/15/90 1 B/K02 60.2 B. BERRY REPLACED FAN MOTOR.
70.8 COMPRESSOR, AND CONTROL BOX, PURGED RECEIVER TANK; DC-1-90412 WRITTEN; RETESTED 11/23/90:
K02 = 46.9 28902500 04/17/89 2AIK01 50.2 D. ELROD NONE NOTED 2AIK02 50.8 28903859 06/21/89 2A/K01
-13.5 J. ALLBROOK MWO 28904592 INITIATED 2AIK02
-11.5 28904220 07/13/89 2AIK01 27.5 J. ALLBROOK lNCREASED RECElVER PRESSURE TO 2A/K02 17.5 240 LBS, RETESTED:
K01 = 35. KO2 = 48 28906680 01/22/90 2A/K01 15 D. THAMES RESTED AT ELEVATED PRESSUREON 2AIK02 16 01/25/90:
KOI=42 KO2 = 44
a i MWO DATE EDG/ DRYER DEWPOINT PERSON AS!1GNEDTD CORRECTIVE ACTION (S)
IN DEGREES F TAKE READINGS 29000964 04/07/90 2A/K01 85,30,82 D. LOHRMAN RETESTED 04/08/90 WITH DiFFERENT 2A/K02 95,30,85 INSTRUMENT KO1 = 43 9 04/08/90 2A/KO2 61.4. 60.9 N. LEFTWICH K02 = 60.9 04/09/90 2A/K02 61.6 B. BERRY 04/10/90 2A/K01 69.8, 61.5 G. GOODWIN 2A/KO2 64.1. 50.9 04/11/90 2A/K01 57.4.57.2 BLOW DOWN PERFORMED ON 2A/K02 62.6. 54.1 RECEIVERS. RESTED ON 04/14/90:
K01 = 43.8 K02 = 47.3 29001786 06/07/90 2A/K01 6.4 R.CULPEPPER RECHECKED ON 06/07/90 USING ROOT 2AIK02
6.3 VALVES
KO1 = 40.5 K02 = 44.3 29003203 08/10/90 2A/K02 64.5 M. JOHNSON MWO 29003609 WRITTEN TO INVESTIGATE 29004070 10/04/90 2A/KO1 74.1 D. AQUINDE BLEW DOWN AIR RECEIVER AND 2A/K02 84.3 RETESTED ON 10/05/90 K01 = 48.1 KO1 = 48.7 28905790 11/16/89 2B/K01 17 J. BURROUGHS DC 2-89-1502 WRITTEN. RETESTED K01 = 34 29001021 04/07/90 2B/K01 75.-10,85 D. LOHRMAN RETESTED USING DIFFERENT SENSOR:
2B/K02 80,10,80 KO1 = 33.7 KO2 = 44.4 29004432 10/07/90 2B/K01 74.8 B. BERRY BLOW DOWN AIR RECEIVER. DRAIN 10/08/90 28/KO1 78.4 WATER FROM DRYER. DC 2-90-231 10/11/90 2B/KO1 78 WRITTEN. MWO 29004839 WRITTEN 29004839 10/24/90 28/K01 58.9 J. FAIRES RETESTED ON 10/26/90: K01 = 38.4
4 MWO DATE EDG/ DRYER DEWPOINT PERSON ASSIGNED TO CORRECTIVE ACTION {S)
IN DEGREES F TAKE READINGS 19809000 01/20/89 1A/K01 27.3 D. Hutchens NONE NOTED 18901008 03/01/89 1A/K02 78 J. BROOKS COMPRESSOR NOT COMING ON
~'
03/03/89 1A/K02 70 AUTOMATICALt.Y, FAN IN A BINO'!
03/13/89 1AIKO2
$3.9
.t.R.
COMPRESSOR l'REON WAS DISCHARGED AND THEN RECHARGED.
PURGED RECENER.l ADDITIONAL RECEIVER PURGEE 18900984 03/16/89 1 A/KO1 22.6 D. ELROD NONE NOTED '^CmaL DUE an!"'
1 A/KO2 20.1 nri nm,, n nrr nrre r ic unr Dnef fnt r1AftTLA TLar irnt*TI r TVDr AID ORv42) 18901068 05/18189
$AIKO2 78 D.LOHRMAN MWO 18902188 WRITTEN TO INVESTIGATEAND CORRECTPROBLEM WITH KO2 m
m m
a n vnn a m ne nu arn._m.c59.a m. goygo. ogv5gvsn.
rn, n o 19000899 03/09/90 1 A/KO1 61 N 'l'{WILLIS RETESTED 3/12/90 1 AIKO2 66 KO1=48 KO2 =45 19001513 0343430 03/29/90 1 AIKO1 80
""r e D.'LOHRMAN CLEANED CONDENS!NG UNITS MWO 1 A/KO2 60 19001651 INITIATED i
l
m.
MWO DATE EDG/ DRYER DEWPOWT PERSON ASS 8GNED T@
CORRECTIVE ACTION (S)
W DEGREES F TAKE READWGS t
19001651 04/05/90,1800 EST 1 A/K01 86,78 D. THAMES e a cmai nne onmr ace nw n n 1 AIK02 67.77 nrenrre r ic unr nnerini r unru 04/05/90,2030 EST 1 A/K01 83 n vu a nace D; LOHRMAN T"E V^^TLE "ne.* *= navEn! BLEW 1 A/KO2 85
~
DOWN AIR RECEIVERS AND USED 04/06/90. 0005 EST 1 AIK01 85 DIFFERENT TEST EQUIPMENT.
1 A/K02 85 RETESTED 4/8/90:
i 04/06/90,0425 EST 1 A/KO1 85 K01 =41.3 34.2 1 A/K02 85 K02 =36.3 33.2 04/06/90. 0930 EST 1 AIK01 80 D. THAMES 1 AIK02 70 04/06/90,1530 EST 1 A/K01 80 i
1 A/K02 NONE TAKEN 04/06/90,1700 EST 1 AIK01 75 1 A/KO2 NONE TAKEN DA44 DlLOHRMAN 04/07/90 1 A/K01 75,15,75 1 A/K02 80.33,78 i
19002652 06/0s480 06/05/90 1 A/K01 12.9 R.CULPEPPER
!ACT"* L dew n^*T nEtn* ??.a I
1 A/K02 10.6 nrcorre r ic unr nnceini r unru TuE Y^^TLE TvaE ^'n ^nvE"! USED ROOT VALVES WHICH WERE DETERMINED TO REPRESENT A MORE CONSISTENT MOISTURE CONTENT.
RETESTED ON 06/06/90:
K01 - 34.6 KO2 = 41.4
_18808981 01/12/89 18/tC01 28;7 CiBAKER NONE NOTED 1B/K02 27.3
~'
18900822 02/21/89 18/K01 19 J. SIGAa4. ' STROUSE
'^ CTU ^ L 095 =^!" =ELO= ?? e 1BiK02 19.1 ncencre r ic unr onecini c uaru T"E YOOTLE "a5 ^ '. ^"vE"' MWO 18901066 INITIATED 18901066 03/08/90 03/08/89 1B/K01
-2 D. LOHRMAN
'^CTU^L995n^*TnEL^
?? ^
1B/K02
-12 nccacce c ic unr onecini c wiru 03433400 03/22/89 1B/KO1
-15
.__. _..-,MWO 1B/K02
{27 LEFT OPEN UNTIL Pf:OPER TEST EOUIPMENT. 08TAINED.~ RETEST.ED.
K01 = 47 K02 = 45 s annist r ogg4sggg 4Jimcm 30 n ru a nace unnic racriini new nnmr ari nus 484KO3
-33
,, n nre nrre r ic unr nnerini r.
wgg rug uncrts rvoc o novgos ennnernrrn or animace nrn en a ny m t
ni una na a ur ini M
rno mi I
I
= -. _ _ _ _
.m...
m MWU DATE EDG/ DRYER DEWPOINT PERSON ASSIGNED TO CORRECTIVE ACTION (S)
IN DEGREES F TAKE READINGS sannanno sifs? og so u ni 5
m oninco unur s a cre a _ 99w onier cri nw 48.4.03
-40 22_O DEcoEES r 'S 'Or DOSE'9tE wiru Tur yngrtg rvog aio povgni cginigorg9 og a gia_gg ogo cu m er iu i
Ai MnD k A A kit i A f.
vni
,a vn,-,
19001770 04/05/90 1B/KO1 84 D. mom 9 LOHRMAN
' ^ C'U ^ ' OUE oO 95LO" 2 2.0 1BlKO2 82 OEOoEES c !S NOT oOcc m_E ""
04/07/90 1 B/KO1 85,18,80 T'E VOO'LE "E.^' O YE ' LE*
1B/KO2 75,18,82 OOw" ^ ' E CE'"E 9 ^ NO ETESTED 4 4 4bO,
vny na 5 vny ny e DC-190-18s WRITTEN. WRT WRITTEN. RETESTED 4/8/90 WITH DiFFERENT INSTRUMENT; KO1 = 44.5 KO2 = 36.6
?o^^?'?e 04/OS40 48.KOS 84 JEoOYE J.^ C".SO"
'OU'_'O 'EST EOt"oE * OUn Oc 48,KO2 S3 C_^ '_to o ^ T!O*'
- t40 VO'OEO. t^UND
. CCEo' ^ LE Ou '!? '90 mam
^
' o^^ ' ?O 19002901 06/22/90 1B/KO1 80.2
- 8. BERRY DRYER KO1 FOUND NOT RUNNING l
^
l 19004257
O '90 11/06/90 1 B/KO2 60 B. BERRY DRYER INOPERABLE REF: MWO 11/08/90 64.4 19004394; DC-1-90-408 WRITTEN I
l 19004394 11/15/90 1 B/KO2 62 B. BERRY REPLACED FAN MOTOR.
60.2 COMPRESSOR, AND CONTROL BOX, 70.8 PURGED RECEIVER TANK:DC-1-90-412 i
WRITTEN; RETESTED 11/23/90:
KO2 = 46.9 28902500 04/17/89 2A/KO1 50.2 D. ELROD NONE NOTEU 2A/KO2 50.8 28903859 06/21/89 2A/KO1
-13.5 J. ALLBROOK
' ^ CTU ^.L DUE oO!N' Etow ?2.0 2A/KO2
-11.5 "EoEEc cic uO' onccio'_E wivu E YOGTLE TYDE.^'. O VED) MWO 28904592 INITIATED 28904220 07/13/89 2A/KO1 27.5 J. ALLBROOK
' ^ CTU ^ L O'E 00!
ELO 22.0 2AIKO2 17.5 OEOoEES c !S SiO' DOccinLE mu 5
E VOOTLE TV E ^'a O VEnk INCREASED RECEIVER PRESSURE TO 240 LBS RETESTED:
KO1 - 35. KO2 -48 L
i L
k b
l l
l l
MWO DATE EDG/ DRYER DEWPOINT PERSON AS$1GNED T@
CORRECTNE ACTION (S)
IN DEGREES F TAKE READINGS
,nanaco, no n,.on
,a.rn1 S2 N
entarenTen =ra n = O oro cunov iu 3A403 S&
^An"^'^'-
j rni _ in ens _ao 28906680 04464001/22/90 2A/KO1
-44 15
"' 'E ^ 'E. Di TH AMES
'^ cTUAL DUE o^='
eELO* 22.0 2A/KO2
.4016 necorre e re unr onceinte unru m E'f^GTLE E.^'a D=YE"'
RETESTED AT ELEVATED PRESSURE ON 01/25/90; l
KO1=42 KO2 = 44 29000964 04/07/90 2AIKO1 85,30.82 M. LECT *!Cu D. LOHRMAN
' ^ C"_' ^ t DU E ""'
E'_O* '? O co o e, e
~ '
nec orre e,e unr once.o r unru 2A/KO2 95[30,85
' -+' 2E "*' E"cr ^ io ""Em n rw nna. di a in. oc_ c_e_,.
t o u.n_ r_ ue_ r_ Je_ n_
ga, en a wi u nicerocur cruenn 04/08/90 3A401 S.SERRY RETESTED ON 04/08/90 WITH 2A/KO2 61.4. 60.9 Ns LEFTWICH DIFFERENT INSTRUMENT:
KO1 =43.9 04/09/90 2A/KO2 61.6 B. BERRY KO2 = 60.9 04/10/90 2A/KO1 69.8, 61.5 G. GOODWIN 2A/KO2 64.1, 50.9 BLOW DOWN PERFORMED ON 04/11/90 2A/KO1 57.4.57.2 RECE! VERS. - RESTED ON 04/14/90:
2A/KO2 62.6, 54.1
?
KO1 =43.8 KO2 = 47.3 nd " ' 'no 3AEC1 43.S 3AAC3 4J,3 29001786 06/07/90 2A/KO1 6.4 R. CULPEPPER
'^ CTU ^ L DUE on"T nELOw ?? O 2A/KO2 6.3 ac_ c_ or_re r. ' e_ '.^ 7 on_ c cion e u. "T. u..
rue s_ingr. r rvoc aio novcos RECHECKED ON 06/07/90 USING ROOT VALVES:
KO1 = 40.5 KO2 = 44.3 29003203 08/10/90 2A/KO2 64.5 M. JENN6MG JOHNSON MWO 29003609 WRITTEN TO INVESTIGATE 38003648 nn r,g inn 3A403 38,9 L.unenro unur ;a rygg_ ngg onmr ge, ng,
? ^ OEG EEC C 'c NOT "Ec' '_ E uMTu mg yggrts ryog.a q noygos ensp_rn a cceora on r 29004070
? O!OE '9010/O_4/90 2A/KO1 74.1 D. AQUINDE BLEW DOWN AIR RECEIVER AND 2AIKO2 84.3 RETESTED ON 10/05/90 KO1 - 48.1 KO1 = 48.7
n e
y n D
a r
, D n
n i na E
r E
i T 3
e a
T E
1 n
i na T
a nmr m
i r D
r v
ni=
i nS 2
u i
a r,
i en a
n E
n n
V n
)
nr E
0 r
a i
S c
r i L
^
ne'
'I
- ui T 9
c met
^
n N
v, E
e c^
,e r r
O a n
' c i C
o^.n mn R: 7, 4 u
r
^
r a
R 2
n^
M iv O
n r C a e T ar i nn C
r I
A i cnu O34 D
n.
4 T
r a
Ne n n
m
'. n 2
i e
C 2
en
^
nrm P
5 0 e
S 34
^
e r
D Ec r
nv
? 4 n
na 8
A r &
a i r
ni N 6. S.
R r
3 r
c vT Tni r m T i -
=.
roa nE a
E e r D 3
.i e S 94 E
=
r n
nE Tna 4
ncE V
R s
3 nil n ^'
0
. rei 34 Y
r" r I
k nn nnT R
e' a
1 I
T t
=
cT 8
n u vr N=2 a'
D K
W,, T i e 'v 0
r-C 8
t s
1 E
- r t
E i
1 T
' ia r T a
c e
c R O0 n
D r
M c' 0 2a R
a i n m' e i aE KK a
'r 0s t
0 i
n
'I r
n r
9 R
n e
5na K
e F
O D
v n 'E n roF R
D/
O nt i
D C
n' r t
T i r.
a I
n F
E 6 i
r r
e ec i D r
R T/
E a
Q a' r n u
2 n
9niniT e
D nra E 8rinS9 r
n cn u uG T"
a E
re r
M n t
uN T
E1 2
E?
n' sn in n" r C A' c v TnoEO a
a ni
-r r
s I
c A
T a
E e
e nS c
EN Wi
' nmnU b
e W
RO n
a rna DD inRT r
N' A'
S M
T R
D S S
H EG H
3 O. '
NN G
N t
S Y
I G D U
J J'
R E
D' R
ISA O
W R,
I E
B F
AR U
N E K
B n
B.
J A
L O
m SR T J
r E
r P
i F
T S 50 NE 88
?
I E 4..
9 O R E.
g 0 0
. 8 76 3
P G 4
8 7
8 1
4 1 1 WE S
8 7
5 0
4 ED 5
D 7 8 7
N I
R EY 3
1 2 4g 1 2 1
1 1
1 R
0 0C 0g 00 0
0 0
0 D
KE 4g KK K
K K
K
/
i/
/ / /
/
/G A
8S 8g BB B
8 B
8 D
2 23 3a 22 2
2 2
2 E
0' 0
0 9
9 9
/
/
/
7 "~
7 4
0 9
9 0
/
E 9
8 8
4~
0 0
0 2
/
/.
0.
9 9
0 J
J
/ /
T 3
6 6
0 1.
8 1
1 A
O 1
0 0
0 0
1 0
D W
/
J
/ /
t 1
3 0
8 0.
0 9
J
/
/
O 1
4 s
0 1.
1 6
4 4
3
/
4 4
0 0
0 4
4 6
0 3
1 2
9 0
9 3
2 3
3 O
6 7
4 0
4 8
W 3
5 6
1 4
4 0
0 0
0 0
0 M
0 9
0 0
0 0
0 8
8 9
9 9
3 2
3 2
2 2
l-DOCKETED e
USNRC UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
'95 SEP 13 P5 :26
]
i Before the Atomic Safety and Licensing Board 0FFICE OF SECRETARY DOCKETING & SERVICE
)
BRANCH In the Matter of
)
Docket Nos. 50-424-OLA-3
)
50-425-OLA-3 j
GEORGIA POWER COMPANY, )
1 etal.
)
Re: License Amendment i
)
(Transfer to Southern l
(Vogtle Electric Generating
)
Nuclear)
Plant, Units I and 2)
)
)
ASLBP No. 93-671-01-OLA-3 CERTIFICATE OF SERVICE 4
l i
I hereby certify that copies of Georgia Power Company's Fourth Supplemental i
Response to Allen L. Moshaugh's Third Set of Interrogatories and Request for Documents, dated September 13, 1995, were served by hand-delivery (as indicated by an asterisk) or first-l class mail upon the persons listed on the attached service list this 13th day of September, i
1995.
i 7
/
/
/
\\
b~'}
/
l y
fo
/
j ohn Lamberski i
/
TROUTMAN SANDERS Suite 5200 600 Peachtree Street, N.E.
Atlanta, GA 30308-2216 i
(404) 885-3360 1
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of GEORGIA POWER COMPANY, Docket Nos. 50-424-OLA-3 Rt al.
50-425-OLA-3 Re: License Amendment (Vogtle Electric (Transfer to Southern Generating Plant, Units 1 and 2)
Nuclear)
ASLBP No. 93-671-01-OLA-3 SERVICE LIST
- Administrative Judge Stewart D.
Ebneter Peter B.
Bloch, Chairman Regional Administrator Atomic Safety and Licensing USNRC, Region II Board 101 Marietta Street, NW i
U.S.
Nuclear Regulatory Suite 2900 Commission Atlanta, Georgia 30303 Two White Flint North 11545 Rockville Pike
- Office of the Secretary Rockville, MD 20852 U.S.
Nuclear Regulatory Commission
- Administrative Judge Washington, D.
C.
20555 James H. Carpenter ATTN:
Docketing and Atomic Safety and Licensing Services Branch Board 933 Green Point Drive
- Charles Barth, Esq.
Oyster Point
- Mitzi Young, Esq.
Sunset Beach, NC 28468 Office of General Counsel One White Flint North
- Administrative Judge Stop 15B18 Thomas D. Murphy U.S.
Nuclear Regulatory Atomic Safety and Licensing Commission Board Washington, D.
C.
20555 U.S.
Nuclear Regulatory Commission
- Director, Two White Flint North Environmental Protection 11545 Rockville Pike Division Rockville, MD 20852 Department of Natural Resources
- Michael D. Kohn, Esq.
205 Butler Street, S.E.
Kohn, Kohn & Colapinto, P.C.
Suite 1252 517 Florida Avenue, N.W.
Atlanta, Georgia 30334 Washington, D.C.
20001
- Office of Commission Appellate Adjudication One White Flint North 11555 Rockville Pike Rockville, MD 20852