Summary of 850717 Meeting W/Util in Atlanta,Ga Re Submittals Concerning Plant Refueling Outage Scheduled to Begin on 851130.List of Meeting Attendees & Util Submittals Discussed at Meeting Encl
ML20133F298
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/01/1985
From: Rivenbark G
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8508080226
Download: ML20133F298 (6)


Text

.. _ _ ___ _ _ - . .

August 1,1985 Dockets Nos. 50-321 and 50-366 LICENSEE: Georgia Power Company il

', FACILITIES: Hatch Units 1 and 2 j

SUBJECT:

SUP94ARY OF JULY 17, 1985 MEETING WITH GEORGIA POWER COMPANY I

i i

I A meeting with representatives of Georgia Power Company (GPC) and personnel

! from the NRC was held at the NRC Region II offices in Atlanta, Georgia on j July 17, 1985. It was the second of a series of quarterly meetings that GPC J and the NRC have agreed to hold to discuss Hatch Unit I and 2 licensing

! activities. GPC discussed a list of submittals related to the forthcoming 4 Hatch Unit i refueling outage (scheduled to begin on November 30,1985). It

pointed out which of these submittals deal with matters that need to be 4

reviewed and approved by the NRC prior to the shutdown and which require

, review and approval prior to startup following the outage. It stated that it

, planned to submit all items required approval by the end of July. GPC stated

, that the outage was scheduled to last 12 weeks. The staff reported the i status of its review of technical specification changes requested by GPC.

j Other items discussed included: a) organization changes being made by GPC

, that relate to Hatch, b a GPC commitment matrix that it uses to track i important work items, c improving GPC/NRC communications, d) anticipation of requirements (e.g. Technical Specifications) related to planned work j activities (e.g. equipment changes), e) problems related to temporary removal i of cable tray supports in order to wrap the cables for fire protection, f)

{ changes GPC is considering in response to the leakage of charcoal filter fire

protection deluge water into the control room, g) cleanup of backlog items.

I It was agreed that the next quarterly meeting will be held in the Bethesda, Maryland NRC offices on Thursday, October 17, 1985 and that the following meeting would be held at the Hatch plant during the Unit 1 outage.

A list of meeting attendees and lists of the GPC submittals discussed are 4

enclosed.

orW ,1siced17 George Rivenbark, Project Manager Operating Reactors Branch #4 Division of Licensing

Enclosures:

As Stated

, cc w/ enclosures:

See next page OR8#4
DL GRivenbask;cr h^

8/[/85 2 ' '8 m 8188PDR P

LIST OF ATTENDEES JJLY 17, 1985 MEETING HATCH UNITS 1 AND 2 G. Rivenbark NRC/DL J. F. Stolz NRC/DL R. D. Baker GPC L. T. Gucwa GPC S. H. Chesnut GPC R. E. Carroll, Jr. NRC/RII V. W. Panciera NRC/RII

SUBMITTALS REQUIRED FOR NRC APPROVAL PRIOR TO UNIT 1 START-UP

1. Resolution of recirculation system pipe inspection results with NRC approval of disposition.
2. Tech Spec changes associated with resolution of NUREG 0737 item II.E.4.2(7) - purge and vent valve isolation on high radiation. l
3. Tech Spec changes associated with NUREG 0737 item II.K.3.18 - ADS logic changes.
4. Recuest for approval of another cycle with CS sparger clamp.
5. Tech Spec changes associated with drywell pneumatic system improvements.

~

6. A letter to resolve core thermal hydraulic stability issue - either Tech Specs or a letter stating an agreed upon course of action.
7. Provide justification for a third cycle with weld overlays and obtain approval.

SUBMITTALS REQUIRED FOR NRC APPROVAL PRIOR TO UNIT 1 OUTAGE

1. Tech Spec changes associated with the Analog Transmitter Trip System eculpment installation as part of EQ rule.
2. A scheduler relief recuest on implementation of ATWS rule.
3. Tech Spec changes to enable installatilon of fast acting dampers on the purge and vent system.
4. ISI code and Tech Spec relief on 10-year ISI recuirements.

RDB/nb 7/17/85

O Proposed Technical Soecificaticn Amendments At NRC GIC Letter Hatch Associated Date Unit Subject DoCR(s) ,

1/26/77 1 ILRT changes 76-15 i

8/30/77 1 Allow use of modified crane to 76-19 lift spent fuel cask

  • 10/3/78 1 Change PSW, Diesel reauirements 78-16 to reflect " swing" status of D/G 1B 1 Deletes corponent alrueillance 78-17R1 cite to inop ECCS, changes ISI reats 3/5/79 1 Remove reference to alt-dateo version 78-22R1 2/7/84 of Appendix J 2/5/81 2 Adds section 3.0.5 (Operability) 80-19R1
  • 9/27/82 2 Delete building settlement alrveillance 78-30R1
  • 6/15/83 1 Drywell purge and vent changes 83-22 2 Drywell purge and vent changes 83-23 12/21/83 1,2 Reauire H 02 2 contiruous oper. 81-41R1 after IOCA only 81-42R1 4/23/84 2 ATES RPr clarifications 83-33R2 9/5/84 1,2 Leakrate testing of ADS accumilators 84-12 9/5/84 1,2 FC P&V isolation on high rad 84-25 9/12/84 1 " Operability" definition 84-10R1 10/1/84 ETS Delete aerial and terrestrial nonitoring 38 11/7/84 1&2 Diesel Generator Tech Specs 83-30R4 11/9/84 1 Stubber Tech Specs 83-14R2 REB 07/15/85

1

~~ .

Letter Associated Date Unit Subject DoCR(s) 11/9/84 2 Stubber Tech Specs 83-15R2 1/11/85 1 Delete "Omulative Downtime" definition 84-35 1/17/85 1 Revise fire detector descriptions 83-08R1 84-21 2/15/85 2 Correct ADS timer MPL rurber 84-38 2/15/85 2 Change HCU alarm setpoint range 81-3R1 2/15/85 1&2 Delete bypass of high d/w pressure scram 83-21 3/11/85 1&2 Removes EQ deadline 84-39 3/19/85 2 adds ADS timer 85-4 5/9/85 2 overall fix for breaker TS 85-11 5/20/85 1 deletes second. cont. LLRT report rect 78-18R1 6/24/85 1 corrects typographical error 85-6

  • Denotes additional GPC action realired REB 07/15/85 i

4

\ i MEETING

SUMMARY

DISTRIBUTION

. Licensee: Georgia Power Company

  • Copies also sent to those people on service (cc) list for subject plant (s).

Docket File NRC PDR-L PDR-f- ORB!4 Rdg Project Manager -GRivenbark  :

lJStolz BGrimes (Emerg. Preparedness only) -

OELD ,

EJordan, IE ACRS-10 PMorriette

. NRC Meeting

Participants:

GRivenbark JStolz .,

i RCarroll

VPanciera i

i i

f f

I .

I

[

g . -- - , ,

,rv,,, - , , , - , , , , . , gle,- ,_ , - . - , , - ,w , w~ - ,- ,,, , , . g--