Text
_
January 21, 1987 Dockets Nos. 50-321/366 DISTRIBUTION iDocketaF11er NRC PDR/L PDR MEMORANDUM FOR: Daniel R. Muller, Project Director PD#2 Memo BWR Project Directorate #2 DRMuller/GRivenbark Division of BWR Licensing 0GC-Bethesda/EJordan BGrimes FROM:
George Rivenbark, Project Manager ACRS (10)
BWR Project Directorate #2 NRC Participants Division of BWR Licensing
SUBJECT:
SUMMARY
OF MEETING WITH GEORGIA POWER COMPANY, HATCH UNIT 1 AND 2 A meeting with representatives of Georgia Power Company (GPC) and personnel from the NRC was held at the NRC's office in Bethesda, Maryland on July 16, 1986 to have GPC dis:uss and explain its May 16, 1986 submittal requesting exemptions for Hatch Units 1 and 2 to the fire protection requirements of Appendix R to 10 CFR 50. GPC discussed the history of its Appendix R submittals and exemption request.
It also discussed its schedule for submittal of the Fire Hazards Analysis and request to delete the fire protection Technical Specification.
It discussed its schedular needs for staff review and approval. A copy of the charts used by GPC in its presentation and a list of meeting attendees are enclosed, met *h -cd by George Rivenbark, Project Manager BWR Project Directorate #2 Division of BWR Licensing
Enclosures:
As stated cc w/ enclosures:
See next page ih DBL:P@2 DBL:P GRiven Wk/cd DRjSffer l/ q9 /87
/ / ; /87 2
0FFICIAL RECORD COPY NO D
3 1 F
~
Mr. J. P. O'Reilly Edwin I. Hatch Nuclear Plant, Georgia Power Company Units Nos. I and 2 I-(
cc:
Bruce W. Chruchill, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Washington, D.C.
20037 Mr. L. T. Gucwa Engineering Department Georgia Power Company Post Office Box 4545 Atlanta, Georgia 30302 Mr. H. C. Nix, Jr., General Manager Edwin I. Hatch Nuclear Plant Georgia Power Company Post Office Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc.
Post Office Box 2625 Birmingham, Alabama 35202 Resident Inspector U.S. Nuclear Regulatory Commission Route 1, Post Office Box 279 Baxley, Georgia 31513 Regional Administrator, Region II
. U.S. Nuclear Regulatory Commission, 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, S.W.
Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Commissioner Department of Natural Resources 270 Washington Street, N.W.
Atlanta, Georgia 30334 Chairman Appling County Commissioners County Courthouse Baxley, Georgia 31513
I ATTENDANCE LIST JULY 16, 1986 GPC-HATUH1AND2APPENDIXR NAME ORGANIZATION George Rivenbark NRC/ DBL /PD#2 Daniel fluller NRC/ DBL /PD#2 Dave flotley NRC/ DBL /PSB Jack Kudrick NRC/ DBL /PSB Rex Wescott NRC/ DBL /PSB Jery Hulman NRC/ DBL /PSB Paul R. Benus GPC/G0 Eng. Mgr.
Gaffour A. Kosi Bechtel-Engineering Douglas E. Dismukis Bechtel-Engineering Sam C. Hart, JR.
GPC-Appendix R Pierre E. Fornel, Jr.
GPC-Appendix R Len T. Guewa GPC-Nucl. Safety & Lic.
Jim Heidt GCP-Nucl. Safety & Lic.
Phillip Grissom SCS-Nucl. Safety & Fuel R. F. Miller SCS-Hatch Project Eng.
L. L. Rowe Bechtel Engineering Dave Jenner Bechtel Engineering
-..m.
. e v'.eu.
O g
4 4
- S 1
k HISTORY APPENDIX R SUBMITTAL JULY 1982 l
SER RECEIVED FEBRUARY 1983 SAFE SHUTDOWN ANALYSIS DECEMBER 1985 REVISION EXEMPTION REQUESTS MAY 1986 UPDATED FHA JULY 1986 TECHNICAL SPECIFICATIONS DELETION JULY 1986 J
I e
i I
l r
-_.-..-_--,,...,,.,,,.-n,._-_,-,,,r
,,-,-n.
.,. _- - -. -, _ - -.,.,,. - - _ -,. -. ~ -,,,,, _,. -.. _ - -.... - - - -
.A e
e i
SUBMITTAL CONTENT 0
NEW EXEMPTION REQUESTS 0
CLARIFICATION OF PREVIOUS EXEMPTIONS 0
SCHEDULAR EXEMPTIONS 0
REVISIONS TO SUPPORTING INFORMATION
~
i l
m
SUMMARY
OF EXEMPTION LETTER 1.0 NEW EXEMPTION REQUESTS - TECHNICAL 1.1 tre Area Boundaries N.I.1 General exemption for minor, non-rated penetrations (exceptionreports) 1.1.2 Specific exemptions for certain barriers 1.2 Lack of Suppression in D/G Switchgear Rooms 1E and IF 1.3 Lack of 8-hour Battery-Powered Emergency Lighting in the Main Control Room and Yard 1.4 Lack of One-Hour Barriers Around Certain Pieces of Equipment Such as Valve Operators and MCCs in the Reactor Building Water Curtain Zones 1.5 Lack of Separation for HPCI Steam Isolation and Turbine Trip Valves 1.6 Lack of One-Hour Protection of Tray and Conduit Supports of Wrapped Trays Under Suppression Systems 1.7 Repairs of Hot Shutdown Equipment for Remote Shutdown 2.0 CLARIFICATION OF PREVIOUS EXEMPTIONS - TECHNICAL 2.1 Intake Structure 2.2 Unit 2 East Cableway 2.3 Control Building East Corridor el.112' 2.4 Control Building Working Floor el. 112' 2.5 Unit 1 East Cableway 2.6 Control Building Switchgear Hallway 2.7 Units 1 and 2 Reactor Buildings 3.0 NEW EXEMPTION REQUESTS - SCHEDULER 3.1 New Circuit Breakers and Fuses 3.2 Control Power Transfer Switch in D/G Switchgear IF 4.0 REVISIONS TO PREVIOUS STATEMENTS 4.1 Fire Detection System Reevaluation 4.2 Changes in Combustible Loadings