r January 21, 1987 Dockets Nos. 50-321/366 DISTRIBUTION Jocket; File.
NRC PDR/L PDR MEMORANDUM FOR: Daniel R. Muller, Project Director PD#2 Memo BWR Project Directorate #2 DRMuller/GRivenbark Division of BWR Licensing OGC-Bethesda ACRS(10)
FROM:
George Rivenbark, Project Manager NRC Participants BWR Project Directorate #2 EJordan/BGrimes Divisior, of BWR Licensing
SUBJECT:
SUMMARY
OF MEETING WITH GEORGIA POWER COMPANY, HATCH UNIT 1 AND 2 A meeting with representatives of Georgia Power Company (GPC) and personnel from the NRC was held at GPC's offices in Atlanta, Georgia on June 2, 1986.
It was the fifth of a series of quarterly meetings that GPC and the NRC have agreed to hold to discuss Hatch Unit 1 and 2 licensing activities. Priticipal topics discussed were the Hatch Unit 1 and Unit 2 status, the Hatch Unit 2 schedule and plans for its next outage, organization changes at GPC, the status of NRC review of GPC requests for amendments and other submittals, the status of GPC commitments and responses to NRC requests, the status of review and implementation by GPC of Appendix R.
The function of the Hatch independent safety engineering group, upgrade of the safety review board, and a number of other Hatch programs directed at improving operations were also discussed. A copy of the meeting agenda, copies of charts used in discussing agenda items and a list of meeting attendees are enclosed.
The next Unit 2 outage is scheduled for September 1986 with an objective of September 6.
The outage is scheduled for a 42 day duration and will include Appendix R modifications, induction heat stress improvement and about 26 design changes in addition to refueling.
The next Unit 2 cycle is planned for a 12 month duration. Unit 1 is scheduled for its next shutdown in early 1987.
Othrd Swd by George Rivenbark, Project Manager BWR Project Directorate #2 Division of BWR Licensing
Enclosures:
As stated cc w/ enclosures:
See next page DBL:PD#2 DBQPJy/
GRivenbark/cd 00 buller l /p /87
/ /u /87 0FFICIAL RECORD COPY 0$ o38fjjg PDR
Mr. J. P. O'Reilly Edwin I. Hatch Nuclear Plant, Georgia Power Company Units Nos. 1 and 2
(
cc:
Bruce W. Chruchill, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Washington, D.C.
20037 Mr. L. T. Gucwa Engineering Department Georgia Power Company Post Office Box 4545 Atlanta, Georgia 30302 Mr. H. C. Nix, Jr., General Manager Edwin I. Hatch Nuclear Plant Georgia Power Company Post Office Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc.
Post Office Box 2625 Birmingham, Alabama 35202 Resident Inspector U.S. Nuclear Regulatory Comission Route 1, Post Office Box 279 Daxley, Georgia 31513 Regional Administrator, Region II U.S. Nuclear Regulatory Comission, 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, S.W.
Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Comissionar Department of Natural Resources 270 Washington Street, N.W.
Atlanta, Georgia 30334 Chainnan Appling County Comissioners County Courthouse Baxley, Georgia 31513
~~
EhCLOSURE 1 ATTENDANCE LIST NRC/GPC QUARTERLY MEETING ON HATCH JUNE 2, 1986 NAME ORGANIZATION J. T. Beckham, JR.
GPC/V.P. Nuclear Operations L. T. Guawa CPC R. D. Baker GPC S. B. Tipps GPC/ Hatch J. D. Heidt GPC P. E. Fornel GPC/ Hatch S. C. Hart GPC B. K. McLeod GPC E. M. Cobb GPC E. M. Howard GPC D. R. Muller NRC/NRR G. Rivenbark NRC/NRR A. Ignatonis NRC/RII f
e I
NRC/GPC QUARTERLY MEETING GEORGIA POWER COMPANY OFFICES
_.I.
JUNE 2, 1986 AGENDA 11:00 o
INTRODUCTION J. T. Beckham, Jr.
11:05 o
ORGANIZATION ENHANCEMENTS L. T. Gucwa 11:15 o
HATCH ISEG D. G. Smith 11:20 o
SRB UPGRADE E. M. Cobb 11:30 o
STATUS OF HATCH UNITS R. D. Baker 11:40 o
OUTSTANDING SUBMITTALS J. D. Heidt G. R. Rivenbark 11:50 o
UNIT 2 OUTAGE B. K. McLeod 12:00 o
LUNCH 1:00 o
REGULATORY STATUS TRACKING J. D. Heidt G. R. Rivenbark 1:15 o
INPO ACCREDITATION / TRAINING E. M.
oward 1:30 o
INP0 DISCUSSION GPC/INP0
~
2:1E c
APPD:21), F. STAT' i r.f k
J E. Forsic?,
1 2:30 o
UPCOMING MEETINGS
- MAINTENANCE B.
. McLeod
- TSIP J. D. Heidt
- CABLE TRAY SUPPORTS J. D. Heidt 2:40 o
CONTROL BLADES J. D. Heidt 2:50 o
HWC MINI-TEST J. D. Heidt d 2:55 o
NUCLEAR HYDRO J. D. Heidt 3:1L o
TERROT.ISE PA'3FICATI0l;S NRL 3:30 o
CHERNOBYL RAMIFICATIONS NRC 3:30 o
EXIT L. T. Gucwa
i LEGEND: 7
'],x Authcrized Ccmplem:nt of MANAGER J
Employees Reporting Directly/
NUC. PERFORMANCE l
Indirectly to the Position AND ANALYSIS 2/6/86 3
DRAFT B SECRETARY ll PAGE 3 of 3
~ ' ~
I l
SENIOR SUPERVISOR PRINCIPAL
^
]
NUC. SAFETY a ENGR.
ASSISTANT E GI ER j
i I
l
'I l
l MANAGER SUPT. PLANT 1
TECHNICAL ENGINEERING I
I I
ENGINEERING CLERK l
(HATCH) l l
1 I
S SERVICES (VOGTLE)J
__J L_
L_._ 3 NOTEI NOTEIC
~
i l_
j
_.. _ ___.. g llI ISEG PLANT HATCli
, ISEG PLANT VOGTLE NSEG SVPV.
NSEG SUPV.
_l l
4 I
I I
I DOCUMENT DOCUMENT ISEG ENG.(4)
ISEG ENG.(4)
CONTROLLER CONTROLLER NOTEI: The ISEG'S (Independent Safely Engineering Groups ) Reports Administratively to the Respective Plant Management and Functionally to the Supervisor Nuclear Safety B Engineering.
I
j.
SAFETY REVIEW BOARD 1
1.
REVIEW 0F DOCUMENTS 2.
SAFETY MAlTERS AND OTHER MATTERS e
DEFICIENCIES i
e VIOLATIONS AUDITS i
PRB MINUTES 4
3.
UNREVIEWED SAFETY QUESTIONS 4
4.
PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS i
5.
LAST UTILITY REVIEW l
SFE Y RN EW 30AR)
V A<0R C-ANGES 1.
ONE SAFETY REVIEW BOARD FOR HATCH AND V0GTLE l
2.
V0GTLE SRB EFFECTIVE NOVEMBER 1985 3.
DAY-TO-DAY REVIEWS BY SUBCOMMITTEES 4.
EXTENSIVE USE OF CONSULTANTS 5.
INCORPORATION OF SRB CHARTER AND PROCEDURES 3
INTO NUCLEAR OPERATIONS DEPARTMENT MANUAL 6.
CHANGE SRB MEMBERSHIP
- 7. SRB REPORT TO SENIOR VICE PRESIDENT NUCLEAR OPERATIONS
- 8. USE OF ALTERNATES AS VOTING MEMBERS
- 9. ELIMINATION OF VICE CHAIRMAN i
NOTE:
- REQUIRES TECHNICAL SPECIFICATIONS CHANGE 4
- - - - - - - - - - ~ - - - - - - '
3, I
4 i
SAFErf REVIEW BOARD MEMBERS 1.
E. F. COBB, CHAIRMAN, NUCLEAR SAFETY REVIEWS MANAGER 2.
J. R. J0RDAN, VICE CHAIRMAN, MANAGER NUCLEAR PROJECTS 3.
C. B. BOATWRIGHT, PROJECT C0ORDINATING ENGINEER, QA 4.
W. D. DRINKARD, SECTION SUPERVISING ENGINEER, CML 5.
J. G. KAROLYI, SECTION SUPERVISING ENGINEER, ELECTRICAL 6.
L. K. MATHEWS, MANAGER NUCLEAR CORE ANALYSIS SECTION, SCS, INC 7.
C. T. MOORE, TRAINING MANAGER, Pl. ANT HATCH 8.
H. C. NIX, JR., GENERAL MANAGER, Pl. ANT HATCH 9.
W. R. WOODALL, MANAGER ENVIRONMENTAL AFFAIRS l
.c SAFETf REVIEW BOARD PROPOSED NEW MEMBERS 1.
J. T. BECKHAM, JR., CHAIRMAN, VICE PRESIDENT NUCLEAR OPERATIONS 2.
L. T. GUCWA, VICE CHAIRMAN, MANAGER NUCLEAR SAFETY AND UCENSING 3.
E. F. COBB, SECRETARY, NUCLEAR SAFETY REVIEWS MANAGER 4.
R. A. THOMAS, VICE PRESIDENT NUCLEAR UCENSING 5.
P. R. BEMIS, MANAGER ENGINEERING LIAIS0N 6.
S. C. EWALD, MANAGER RADIOLOGICAL SAFETY 7.
D. S. READ, GENERAL MANAGER QUAUTY ASSURANCE l
f SAFETY REVIEW BOARD SUBCOMMlHEES 4
1.
REGULAR SUBCOMMITTEE e
SAF EVALU TIONS FOR C NGES TO SYS MS l
IE INSPECTION REPORTS AND RESPONSES QA AUDITS AND CLOSED AFRs j
i e
LERs e
PRB MINUTES 2.
PROCEDURE CHANGE SUBCOMMllTEE l
SAFETY EVALUATIONS FOR CHANGES TO PROCEDURES 3.
EMERGENCY PLAN SUBCOMMITTEE EMERGENCY PLAN AND IMPLEMENTING PROCEDURES f
4.
SECURITY PLAN SUBCOMMliTEE e
SECURITY PLAN AND IMPLEMENTING PROCEDURES i
I r-,+m--~-e--.-
u.-,.-
,w-.------,-.,,..._.-r,,w,
--r..,%,,,-,.
.a w
---.yw-=ssmwe w-g-e,W 'w e +gim-we-+-.rei-=e--w-*--e-m-'
w-----v'"-wm+,~~t+-
--+
4 EATE~Y: REV EW 30ARJ RE30TS I
SA E~Y REV EW 30ARJ e
V\\J~ES 2.
S 3COVV EES e
V \\ J ES e
03E\\
~~EV S~~
e
\\ VES~~ GA~~0 \\ S 1
J i
ee _
--..--,-,-_m
-.,,%,__.-...-_-,wn f
p.
9y7,,-w
,__m,_
,,p,,,
y_
,_,_,-r,-.3,,--
3.
I.
HATCH UtET 2 i
FALL L986 0UTAGE tRTOR WORKSCOPE REFLELING IHSI APPEFOIX R MODIFICATIONS DESIGN CHANGES (26)
LLRT/ILRT TlEBIfE INSPECTI0f1/PREVEtFIVE MAIMEfMBEE PEDICTIVEIPREVENTIVE F%IMENAFEE CORRECTIVE t%INTENAbCE ClRRENT PLAf#4ItE/ PREPARATION ACTIVITIES OUTAGE !%NAGEFENT TE#i VALVE hmK PLAffEtS/TECHfECAL SLPPORT PECISE WORKSCOPE DEFItRTION/ FREEZE DETAILED PLAffEFE/MAFLOADING 4
I e
-w-
- ~, ~,
,,-r,,-
-r,,---
--v-~,
z OPER \\ TION-\\L PLAN OF RECORD i
1 l
H -\\TCH - I CYCE 10 CYCLE 11 CYCIEt2F':..
1 J
g 4 Tede t
H ATCil - 2 CYCE 6 CYCLE 7 CYCE 8 CYCE 9 i
i VOGTLE-I CYCE 1 CYCE 2 w
I 1
l, 4
)
j VOGTLE-2 CYCE I' i
l I
l P
1 i
1 <12:<y: z:
-1<12:<y=z=
--1<12
<y-z=
1 <12-<y;z:
1986 1987 1988 1989 i
1,
H A-C I-2 CYCLE 6
two s c e n a rio s coastdown to 8800 MWD /st
~~
105 -
100 --
95 -
cr La 3Co 90 -
O_
tt 85 -
N 80 -
8800
'N*
Mwo/se 7S -
I
,z a
,saa ssassasaaasssaasi5 sagaaaaasaaaaassaaasasaeasagaaaassa4 saaaaaaaaaaaassagsssaasaaasaas4 asassaaaasgaaaaaa;aa JUNE 1 JUNE 26 JULY 21 AUG 15 SEPT 9 APPROXtMATE DATE
)
s c'
t. ',. _,
a g
1 Page Nu.
05/30/bi, t}. OU l b fi.Nb114t > L I C Liab l Nd 150UEE dJTH L ul;fil 1 1 A L AT NRC LEfiER UNI 1 [
6LDJECi 1)A i L i
i
/
ADDl l 1 Ui4s.L WOW bY 6PC hEudrNLl; UN 1HIS 11LM bEFORE FIlJAL w
hE6LLU1IUN
/
/
. Mi-h uVid D-ITEM REQUIRED jFCH l'FCO' LING OUl AOL
/
/
~; ll E11 CLOT.ED Elt4CE LAST hEi fuhl
/
/
U llLM ADDLD SINCE LAOT REFdFO i
01/26/7/ c21 FROFObE0 Ch,,WGds TO IN fEGF4A FED L Et,K Ri-e rE 1ESTING l
00/30/7/ 321 Ph0POCED 1CLhf 4ICf.L Ef CCIFlhATIONS -
e,_ LOW USE OF MODIFIED C6ANE 10 LiF SPENTFUELCjA61; 10/03/70 c.c l PROPOSED TECHNICAL LPECIFIEnTIONS CHANGE FSW, DIESEL REUulRElihilf 6 TO REFLECi $ldING ElATUS OF D/O 16 i
03/05/79 J21 i-RUPOSED TECH.41 CAL SPECIF I Wi lONb - RLMOVE REFERENCE TO UUTDAlED VERSION OF A P P E hiD I A J 09/ 27 / b2
~.'.o6 f h0FOSED 'r ECHNICnL bliCIFICAT IONS - DUILDING SETTLEMENT SURVEILLANCE - 60BMIT UPDATED TABLE i
04/15/03 321.3o6 GCliiRll LEllEh
- t. REEJIREMENTS FOh EMERGENCY RESPONEE C Af4 E. i t_1 1 )
04/23/64 Jots i;i<Cf DF,ED *iECHillCAL OF ECIFIL,310ND - nTWS hPT LCO CL AR I F I Cr T I ON:.
i 09/05/84 Je6 thuPU:lEli 1ECHNICi.L SF LCIFlt. ATIONS - PRIMARY CONTAINMENT 1CILnl1GN OF FURGE AND VENk UN hl hAs 09/12/64 3J1
- PROF OGED IECHNICAL SPECIFICATIONS - DPEHADILITY DEFIfJITION 09/19/G4 366
- FbnClURf. HECHANICS ANALYSib fen GENERIC LETTER 61-11 FEEDwAIEh NO22LE 11/09/04 d.21,366 DIESEL GENEHATOR IECHNICAL'BFECIFILAIIOM3 i
U1/1O/Ob 366 h EDUtiS ~l TO LCGC1fID CONFIRMATORi OabEn GN hlACTOR COOLANT b r< TE!! S'l A IliLEG.I 31 EEL. PIF E 01/17/8J J.:'1 f kUPUDED FlhC Fiia lLL F II!fJ 15:ChN I Li n_ Er LC IFI CAT 10MO --
NODIFICAY1UN TJ THE NUMBER:AND LOCA.1Ul4 OF FlkE DETECTON:
05/06/0b 321,3co PhDFOSED MOLIFICATIONS ANii,CCtiLDULL f 'Of. REAClOR WAlLR LEViiL 1NiTRUMENfAlION IfFROVENEN}u U i:i!E R 2 L LETTEN 84-23
9 1
f i
)
l i:a qe t ua.
)
0:,/30e De
..{*
UU l 0 I t'.N!'1 % L l &NF I NG I H_ UE L UIlti EUUMITTAL AT l
)
L E l l t.- h U IT hun'ULi iwlt i
Ob/13/US El,J6c nCOUCe: F.ON i,DD I T l ON/ L E Hui;DE! J I du
, I Hb uhMAT lON - SCI:.:MIC SF EC1 RA 06eO3/85 z2s2.uv hEDA O: FGl< nIQ1TluGAt.l1NFORMATlDN GLNENIu v
b4LEM t: Vein i LEITER 63-2G -
- 0,CR(-4 M URCARER FAILURE 06/25/EL 321,.366 INSEfWICE lEdlIN3 - INSEhVICE INUPECTIClJ PROGHAMS UPDATE 07/26/80 221 hEDUEST TO REVISE TECliijlCnL EPECIFILnTIUNE C'EC1F3t'AT1DN AND 1ABLU ADDRESSING COMPO
- ADD Ths,N d 1 E NT L1HITG 06/10/55 23 FROPGEED C}lANGES TO TH2lTECHNICAL EFECIr RADIATION I3OLATION OF PURGE AND VENT VALVES - DO 09/13/bb L./1,366 hCDCEET TO isEVISE TECHi[ICAL SECCIFICATIONS - SCRA OLUNE VENT AND DRAltJ VhtVE CLO5URE 1 IME I
01/06/06 321,366 Ph0EGE.D CHAN3E dUlLD]!40 CO2 FIRE SUFFR'I5SIONTO TECH 5.IC SYSTCM - DOCR 85-16 01/06/tm 321 Ph0POEEu.CHnNGE TO TECHh! CAL t 03E UTATIONS FHDil TAELif DOCR 83-14SPECIFICA 01/06/04: 366 1
FRO' UEED CHANGE TO TECH;!ICAL SPECIFICATIONS - DCLETE RECDIREMENT FON HYDROGE!jRECONDINERh 01/06/bo 321,066 1
i FLM OGCD CHANGC TO TEChiJ1 CAL UFECIFICATIO EChnN 01SCHARGE VOLUhC VEN f AND Div.1: ' VA.VE. CLOLURE TltE 01/06/96 321 Je6 t RUPQuLi; LHnNGE TO TECHi/ICAL GFECIF ICi,TIONLi - bHIFl REuulhEf1ENTS OVER~i' 01/07/bo 321 APPENDIX i
G AND H TECHN] cpl EPECIFICATIONS - REAClOh FRESev VE55EL MATERIAL GURVEILLtACE CAP 3ULEb AND FRACTUhE TOU AiMLYSIS 01/07/86 321 PRCVOSFD CHANGE TU TECHillCAL SPECIFICATION 5 - AUTOMATIC ISC $iION OF VENT ON HIGH RADIATION SIGNAL l~ URGE AND
{
01/27/06 3;.1, 3 6d.
hus1SIUW TO GAEEOUS EFFLUENi lECitNICAL SFECIFICA SA!J LING REQUIREMENTS AFTEh A POWEk LEVEL CHANGE,TRITIUM 01/ 31/ 06 3.,21,.;u a GENERJL LETTER 83 6ALEM 476C - CLGEURE Di ITEMS 3.1.-
blC a...C f=l l
cw Pcge No.
3 05/30/G6 pu1ST ANDING LICENGING ISSUES l[Ilti SubHITYAL Al NRC f
LETTER UNIT SUBJECT DATE 4
02/17/86 321,366 PROPDGED CHANGC TO TLCl!NILAL EPECIFICATIONS - RCORGANIZATION
- RE6PONSIBILITY FUR hAOIOLO: DICAL ENVIRONMENlAL MONITORING, EINIRONMEN1 AL TECHNICAL SPLCIFICATIONS, MET 'lOWCh LOCATION, OA RECORDS, DELETF. EPDD, ETS PROCEDURE APPROVAL 02/20/G6 321,366 PROPOSED LICLNSE EXTENSION 10 40 YEARS FROM OPCRATING LICENSE VICE CONSTRUCTION FERMIT PROPOSEDCHANGETOTECHNIChLSPECIFICATIONS-PRIMARY 03/03/G6 321 CONTAINMENT ISOLATION SYSTEM: LISTING CORRECTIONS l
03/07/06 321.366 C PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - TO ALLOW MINI TEST FOR HYDROGEN WATER CHEMISTRY 03/13/86 321,366 REOUEST FOR ADDITIONAL INFQRMATION - MODIFICATION OF VACUUM' EREAKERS ON MARK 1 CONTAINHENTS - GENERIC LETTER 83-09 03/27/06 321,366 PROPOSED CHANGE TO TECHNIC L SPECIFICATIONS - EQUALIZINO REACTOR PROTECTION S'rSTEH SPECIFICATIONS BETWEEN UNITS 03/31/S6 321.066-FROPOSED CHANGES TO TECHNIdAL SPECIFICATIONS - EMERGENCY POWER -- DIESEL GENERATOR TijSTING - GENERIC LETTER 84-15 04/09/G6 3os REITERATlON OF PROPOGED del'ETION OF BUILDING SETTLEMENT TLCHNICAL SFECIFICATIONS NiTH INCORFORATIGN OF SETTLEMENT ChITERIA FROM UUR 12/1/78 ETTt:li IN'io PLAN 1 PROCEDURES 04/1S/06 321,u6o PROPOSED CHANGES TO TECHNICAu SFECIIICA~iIONS - Fl:EL STORAGE g $f4A.,y Q REQUIREMEl4TS, FUELASSEMBLjLESIGN, MAPLHGR LIMITS, MD
. m p-
_WOF1H MINIM 17E3, ROD SEQUENCE CONTROL, BANKED POSITION WI1 HI>hhWAL L' QUENCE, EDITOF{IAL CHANGES 05/14/06 321,366 N IE BULLETIN 85 MOTOR PERATED VALVE COMMON MODE FAILURES DURING PLANT TRANdIENTS DUE 10 IMPROPER SWITCH SETTINGS OG/1S/86 321,366 N CHANSE OF SCHEDULE - REACTOR WATER LEVEL INSTRUMENTATION -
g,, ~
GENERIC. LETTER 84-23 05/16/St> 321,366 N FROPOSED TECHNICAL SPECIFICATIONS - FLANT REVIEW BOARD AND SAFETY REVIEW BOARD COMPOSll TION AND QUORUM, AUDIT REQUIREMENTS, MANAGEMENT RE; PORTING RELATIONSHIPS i
'h5/16/G6,321.366 N EXEMPTION ':. QUESTS - APPENDIX R
.;w
.n..
5-30-86 Appendix-R toject Status Report (Quarterly NRC Licensing Status Review Meeting) i Scope of Project 1)
Shutdown analysis 2)
Fire Hazards Analysis 3)
Hi/Lo Pressure Analysis 4)
Breaker / Fuse Coordination Analysis 5)
Configuration control Program 6)
Procedures Upgrade / Training 7)
Fire Barrier Upgrades (Walls) 8)
Sprinkler System Additions 9)
Electrical Circuit Reroute Modifications
- 10) Raceway Wrap Additions
- 11) Breaker / Fuse Changeouts
- 12) Fire Detection System Addition
- 13) Emergency Lighting Additions Status A maximum effort is underway to complete work for all commitments by the Nov.
30, 1986 deadline. The current status of each of the above project categories is as follows:
1)
Shutdown Analysis: - Complete.
2)
Fire Hazards Analysis: - Nearing completion. Will be transmitted to the NRC for review in July. This will contain all of our new Fire Protection
" Tech. Specs."
3)
Hi/Lo Pressure Analysis: - Unit-2 complete. Unit-1 complete by 6/30/SG.
4)
Breaker / Fuse Coordination Analysis: - Complete.
5)
Configuration control Program: - Procedures in place now.
Plans call for enhanced program development in 1987.
6)
Procedures Upgrade: - Appendix-R operations requirements are being incorporated into the EOP program. All procedures are scheduled for completion by 7/31/86. Introductory training completed. Other plant procedure revisions are on-going and will continue.
7)
Fire Barrier Upgrades: - 30% complete. Scheduled for completion by 9/1/86.
8)
Sprinkler System Additions: - 60% complete. Scheduled for completion by 8/1/86
_ s p
9)
Electrical Circuit Modifications: - Eight (8) of twenty (20) mods comple e. Final reroutes will be completed during the Sept /Oct. '86 unit 2 outa
- 10) Racewa)
Wrap Additions: - Scope is 4500' of conduit and 1200' of cable tray to wrap. Currently 41% complete. Scheduled for completion by 9/30/86.
- 11) Breaker / Fuse Changeouts: - Eleven (11) DCRs opened involving modifications resulting from the coordination study. Three (3) DCRs have been complete. Scheduler exemption requested for this work to allow one additional outage cycle.
- 12) Fire Detection System Addition: - The entire fire detection system at Hatch is being replaced with updated equipment. Phase I will envelop all specific Appendix-R commitments and will replace all existing detection in the reactor and control buildings. Installation is expected to be complete in October and functional testing complete in November.
- 13) Emergency Lighting Additions: - Design expected to be complete by 6/2/86.
Phase 1 installation in progress to be complete by 7/15/86. Remainder to be complete by 10/15/86.
SCH/ams 5/30/86 (0495S)
~
~~- _
I l
k.
I;;
(
SUMMARY
OF EXEMPTION LETTER
' l
?
1.0 NEW EXEMPTION REQUESTS - TECHNICAL 1.1 Fire Area Boundaries 1.1.1 General exemption for minor, non-rated penetrations (exception reports) 1.1.2 Specific exemptions for certain barriers i
l 1.2 Lack of Suppression in D/G Switchgear Rooms 1E and 1F 1.3 Lack of 8-hour Battery-Powered Emergency Lighting in the Main Control Room and Yard l'
1.4 Lack of One-Hour Barriers Around Certain Pieces of Equipment l
Such as Valve Operators and MCCs in the Reactor Building i
Water Curtain Zones I
I 1.5 Lack of Separation for HPCI Steam Isolation and Turbine Trip n
i Valves 1
1.6 Lack of One-Hour Protection of Tray and Conduit Supports of Wrapped Trays Under Suppression Systems l
1.7 Repairs of Hot Shutdown Equipment for Remote Shutdown 2.0 CLARIFICATION OF PREVIOUS EXEMPTIONS - TECHNICAL i
2.1 Intake Structure 2.2 Unit 2 East Cableway l
2.3 Control Building East Corridor el. 112' f
2.4 Control Building Working Floor el. 112' 2.5 Unit 1 East Cableway 2.6 Control Building Switchgear Hallway 2.7 Units 1 and 2 Reactor Buildings 3.0 NEW EXEMPTION REQUESTS - SCHEDULAR 3.1 New Circuit Breakers and Fuses 3.2 Control Power Transfer Switch in D/G Switchgear IF
se 4.0 REVISIONS TO PREVIOUS STATEMENTS 4.1 ire Detection System Reevaluation 4.2
$hanges in Combustible Loadings e
e i
i t
I r.--
.-m
3
~
..1 1
CABLE TRAY SUPPORTS o
MEETING SCHEDULED 6/18 o
STATUS i
^
..k-TSIP o
MEETING SCHEDULED 6/19 o
COMMITTMEt1T o
DESIRED RESULTS
\\
4 1
TSIP o
MEETING SCHEDULED 6/19 o
COMMITTMEt!!
o DESIRED RESULTS 1
l f
i
.3
.._,.___.._,.2..._.
f.
(
i HYDROGEN WATER CHEMISTRY MINI TEST o
PROCEDURES BEING REVISED o
H2 ON SITE APPROXIMATELY JUNE 16 o
TEST SCHEDULE JUNE 20 o
TEST C059LETI0l! APPROXIMATELY JULY 11 (3 WK5) l
,g
....4 1
facec.
I twns wce m m m ORGAtHZATION CHANGES OUTAGE PLEMNGIMAfMGE?BE MANAGEENT ASSISTAfCE - (X)NSLLTANTS SHIFT lX)RK PROCEDLRE LPGRADE PROGRESS Iff0 VISIT RESULTS HATCH I OlfrAGE I
l
=
l
,.n
. ~.
7_ _,.
k.
l 4
J 1
1 -
f f
J 4
q HYDROGEN WATER CHEMISTRY MINI TEST i
j o
PROCEDURES BEING REVISED o
H2 ON SITE APPROXIMATELY JUNE 16 o
TEST SCHEDULE JUNE 20 t'
o TEST C0?tPLETIDF! APPROXIbiATELY JULY 11 (3 WKS) i i
k i
l
- l...
- - - - - - - - - - - - - - - - - - - -