IR 05000315/1984021
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML20133M923 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 10/22/1985 |
From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
To: | |
Shared Package | |
ML20133M909 | List: |
References | |
50-315-84-21, 50-316-84-23, NUDOCS 8510280316 | |
Download: ML20133M923 (1) | |
Similar Documents at Cook | |
---|---|
Category:INSPECTION REPORT
MONTHYEARIR 05000315/19990271999-10-15015 October 1999
[Table view]Partially Deleted Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24 (Ref 10CFR73.21).Noncited Violation Noted.Major Areas Inspected:Plant Support Activities Re Physical Protection of Plant Facility. 15 IR 05000315/19980241998-12-14014 December 1998 Partially Withheld Insp Repts 50-315/98-24 & 50-316/98-24 on 981112-19 (Ref 10CFR73.71).Violations Noted.Major Areas Inspected:Plant Support Activities Re Physical Protection of DC Cook Facility IR 05000315/19980111998-06-0202 June 1998 Partially Withheld Insp Repts 50-315/98-11 & 50-316/98-11 on 980504-08 (Ref 10CFR73.21(c)(2)).No Violations Noted.Major Areas Inspected:Security Program Plans,Security Program Procedures,Security Organization & Administration IR 05000315/19970191997-11-24024 November 1997 Partially Withheld Insp Repts 50-315/97-19 & 50-316/97-19 on 970929-1003 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Security Staff Knowledge & Performance,Training & Qualification Program & Organization & Administration IR 05000315/19970071997-04-25025 April 1997 Partially Withheld Insp Repts 50-315/97-07 & 50-316/97-07 on 970324-28 (Ref 10CFR73.21).No Violations.Major Areas Inspected:Review of Physical Security Program IR 05000315/19960081996-10-25025 October 1996 Insp Repts 50-315/96-08 & 50-316/96-08 on 960909-13.No Violations Noted.Major Areas Inspected:Licensee Assessment of Performance in Area of Physical Security IR 05000315/19930231993-12-0202 December 1993 Partially Withheld Insp Repts 50-315/93-23 & 50-316/93-23 on 931117-19 & 22-24 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Protected & Vital Area Physical Barriers IR 05000315/19930021993-02-0505 February 1993 Partially Withheld Insp Repts 50-315/93-02 & 50-316/93-02 on 930119-22.No Violations Noted.Major Areas Inspected:Mgt Support,Protected & Vital Area Physical Barriers,Detection Sys & Detection Aid & Protected & Vital Area Access Control IR 05000315/19910111991-06-27027 June 1991 Insp Repts 50-315/91-11 & 50-316/91-11 on 910501-0614.No Violations Noted.Major Areas Inspected:Plant Operations, Reactor Trip,Maint & Surveillance,Engineering & Technical Support & Actions on Previously Identified Items IR 05000315/19900231990-11-29029 November 1990 Insp Repts 50-315/90-23 & 50-316/90-23 on 901010-901113.No Violations Noted.Major Areas Inspected:Plant Operations & Maintenance & Surveillance IR 05000315/19880181988-08-19019 August 1988 Partially Withheld Insp Repts 50-315/88-18 & 50-316/88-21 on 880705-21 (Ref 10CFR73.21).Noncompliances Noted.Major Areas Inspected:Mgt Effectiveness,Records & Repts,Testing & Maint, Power Supply,Lighting,Compensatory Measures & Vital Areas IR 05000315/19870421987-12-30030 December 1987 Partially Withheld Insp Repts 50-315/87-42 & 50-316/87-42 on 871207-10 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Personnel Training & Qualifications,Safeguards Contingency Plan & Compensatory Measures IR 05000206/19870141987-08-31031 August 1987 Insp Repts 50-206/87-14,50-361/87-13 & 50-362/87-15 on 870524-0704.Violations Noted.Major Areas Inspected: Operational Safety Verification,Evaluation of Plant Trips & Events,Monthly Surveillance Activities & Maint Activities IR 05000315/19870041987-03-17017 March 1987 Safety Insp Repts 50-315/87-04 & 50-316/87-04 on 870127-0223.No Violations or Deviations Noted in Five of Six Areas Inspected.Violation Re Visitor Escort Deficiency Addressed in Insp Repts 50-315/87-08 & 50-316/87-08 IR 05000315/19870081987-03-16016 March 1987 Partially Withheld Insp Repts 50-315/87-08 & 50-316/87-08 on 870127-0223 (Ref 10CFR73.21).Violation Noted:Visitor Escort Deficiency IR 05000315/19860381987-03-0303 March 1987 Addendum to Insp Repts 50-315/86-38 & 50-316/86-38,providing Criteria for Comparing Results of Capability Tests & Verification Measurements IR 05000315/19870061987-02-26026 February 1987 Insp Repts 50-315/87-06 & 50-316/87-06 on 870209-11.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise.Exercise Weakness Noted in Area of Protective Action Recommendations IR 05000315/19870051987-02-20020 February 1987 Insp Repts 50-315/87-05 & 50-316/87-05 on 870211-12.No Violations or Deviations Noted.Major Areas Inspected:Insp, Testing & Seal Replacement Program for Large Bore Steam Generator Snubbers IR 05000315/19870031987-02-18018 February 1987 Insp Repts 50-315/87-03 & 50-316/87-03 on 861216-870126. Violations Noted:Untimely Return to Svc Testing & Inappropriate Surveillance Test Acceptance Criteria IR 05000315/19860411987-01-16016 January 1987 Insp Repts 50-315/86-41 & 50-316/86-41 on 861104-1215. Apparent Violation Noted:Failure to Perform Timely post- Maint Operability Test on Valve & Subsequent Performance of Opposite Train Maint Being Tracked as Unresolved Issue IR 05000315/19860391986-12-0101 December 1986 Partially Withheld Physical Protection Insp Repts 50-315/86-39 & 50-316/86-39 on 861103-06 (Ref 10CFR73.21). No Violations Noted.Licensee Identified Concerns Re Personnel Access Control Program & Contingency Personnel IR 05000315/19860401986-11-28028 November 1986 Insp Repts 50-315/86-40 & 50-316/86-40 on 861103-07.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program IR 05000315/19860321986-10-17017 October 1986 Partially Withheld Reactive Physical Security Insp Repts 50-315/86-32 & 50-316/86-32 on 860818-22 & 0908-11 (Ref 10CFR73.21).No Noncompliance Noted.Major Areas Inspected: Inadequate Maint of Safety Equipment.Details Withheld IR 05000315/19860361986-10-0101 October 1986 Insp Repts 50-315/86-36 & 50-316/86-36 on 860922-23.No Violations,Weaknesses or Deviations Noted.Major Areas Inspected:Emergency Preparedness Drill Involving Observations of Key Functions & Locations IR 05000315/19860271986-08-20020 August 1986 Insp Repts 50-315/86-27 & 50-316/86-27 on 860707-11. Violation Noted:Failure to Adequately Test ESF Response Time in Unit 1 Steam Generator Water Level hi-hi Level Turbine Trip Reactor Trip Test ML20206R9231986-06-30030 June 1986 Exam Rept 50-315/OLS-86-02 on 860519-22.Results of Exam:All Senior Reactor Operator Candidates & Seven Reactor Operator Candidates Passed IR 05000315/19860161986-06-25025 June 1986 Insp Repts 50-315/86-16 & 50-316/86-16 on 860609-11.No Noncompliance,Deviation or Deficiency Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000315/19860241986-06-20020 June 1986 Partially Withheld Physical Security Insp Repts 50-315/86-24 & 50-316/86-24 on 860604-05 (Ref 10CFR73.21).Noncompliance Noted:Items Not Searched or Secured as Required by Security Plan IR 05000315/19860211986-05-21021 May 1986 Mgt Meeting Repts 50-315/86-21 & 50-316/86-21 on 860508. Major Areas Discussed:Licensee Corrective Action Plan IR 05000315/19860031986-02-11011 February 1986 Reactive Physical Security Insp Repts 50-315/86-03 & 50-316/86-03 on 860113-16.Violations Noted:Personnel Inadequately Searched.Details Withheld (Ref 10CFR73.21) IR 05000315/19860021986-02-0606 February 1986 Insp Repts 50-315/86-02 & 50-316/86-02 on 860121-24.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program,Including Detection & Classification & Protective Action Decisionmaking IR 05000315/19850351985-12-19019 December 1985 Insp Repts 50-315/85-35 & 50-316/85-35 on 851029-1108.No Violation Identified.Major Areas Inspected:Failure of Unit 2 Reactor Trip Breaker to Actuate During Unit Trip on 851029 IR 05000315/19850381985-12-19019 December 1985 Physical Security Insp Repts 50-315/85-38 & 50-316/85-38 on 851118-21.No Violations Noted.Major Areas Inspected:Security Mgt Effectiveness,Security Organization & Security Program Audit.Details Withheld (Ref 10CFR73.21) IR 05000315/19850391985-12-0606 December 1985 Matl Control & Accounting Insp Repts 50-315/85-39 & 50-316/85-39 on 851118-21.No Noncompliance Noted.Major Areas Inspected:Reactors.Details Withheld (Ref 10CFR2.790) IR 05000315/19840211985-10-22022 October 1985 Addendum Consisting of Confirmatory Measurements Program Data Sheet to Insp Repts 50-315/84-21 & 50-316/84-23 IR 05000315/19850231985-09-0404 September 1985 Physical Protection Insp Repts 50-315/85-23 & 50-316/85-23 on 850812-15.No Noncompliance Noted.Concern for Weapons Proficiency & Adequacy of Compensatory Measures Identified. Details Withheld (Ref 10CFR73.21) IR 05000315/19850051985-08-0101 August 1985 Insp Repts 50-315/85-05 & 50-316/85-05 on 850708-12.No Violations or Deviations Noted.Major Areas Inspected: Previous Insp Findings,Lers & Independent Insp of Detector, Burnup & Crunch Computer Codes IR 05000315/19850161985-07-23023 July 1985 Insp Repts 50-315/85-16 & 50-316/85-16 on 850521-0624. Violation Noted:Failure to Follow/Comply W/Requirements of Request for tie-rod Change ML20129A0261985-07-0909 July 1985 Safeguards Insp Repts 50-315/85-18 & 50-316/85-19 on 850618- 19.Violations Noted:Failure to Adequately Control Access to Vital Areas.Details Withheld (Ref 10CFR73.21) IR 05000316/20040301985-05-31031 May 1985 Insp Repts 50-352/85-16 & 50-353/85-04 on 850316-0430. Violation Noted:Inadequate cross-discipline Review Capability in Plant Operations Review Subcommittee Reviewing Rev 2 to Procedures Re Sodium Pentaborate Analysis IR 05000316/20040111985-04-24024 April 1985 Insp Rept 50-416/85-09 on 850316-0411.Violations Noted: Steps in Sp 06-EL-1E31-M-0001 Performed Out of Sequence Resulting in ESF Containment Isolation Valve Actuation & Causing Isolation of RCIC Sys IR 05000315/19830011983-04-14014 April 1983 IE Insp Repts 50-315/83-01 & 50-316/83-01 on 830117-21 & 0217.No Noncompliance Noted.Major Areas Inspected:Qa/Qc Organization & Program Work Controls,Design Controls & Control of Contractor Activities IR 05000315/19820111982-07-14014 July 1982 IE Insp Repts 50-315/82-11 & 50-316/82-11 on 820501-0615. Noncompliance Noted:Failure to Take Adequate & Timely Corrective Actions & Failure to Maintain Functional Penetration Fire Barrier IR 05000315/19820051982-06-24024 June 1982 IE Emergency Preparedness Appraisal Repts 50-315/82-05 & 50-316/82-05 on 820315-26.Noncompliance Noted:Failure to Maintain,In State of Readiness,Adequate Interim Emergency Operations Facility IR 05000315/19820101982-06-0808 June 1982 IE Insp Repts 50-315/82-10 & 50-316/82-10 on 820314-0430. Noncompliance Noted:Failure to Follow Equipment Control Procedures When Taking Unit 2 E Centrifugal Charging Pump Out of Svc & Failure to Make Prompt Rept IR 05000315/19820091982-06-0404 June 1982 IE Insp Repts 50-315/82-09 & 50-316/82-09 on 820329-31.No Noncompliance Noted.Major Areas Inspected:Observation of Emergency Exercise Involving Integrated Response from State of Mi & Local Counties.Fema/Nrc Exercise Scenario Encl IR 05000315/19780291978-10-20020 October 1978 IE Inspec Repts 50-315/78-29 & 50-316/78-27 on 780925-29 During Which 4 Items of Noncompliance Were Noted:Security Organization,Communications Control,Detection Aids & Testing & Maintenance 1999-10-15 Category:NRC-GENERATED MONTHYEARIR 05000315/19990271999-10-15015 October 1999
[Table view]Partially Deleted Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24 (Ref 10CFR73.21).Noncited Violation Noted.Major Areas Inspected:Plant Support Activities Re Physical Protection of Plant Facility. 15 IR 05000315/19980241998-12-14014 December 1998 Partially Withheld Insp Repts 50-315/98-24 & 50-316/98-24 on 981112-19 (Ref 10CFR73.71).Violations Noted.Major Areas Inspected:Plant Support Activities Re Physical Protection of DC Cook Facility IR 05000315/19980111998-06-0202 June 1998 Partially Withheld Insp Repts 50-315/98-11 & 50-316/98-11 on 980504-08 (Ref 10CFR73.21(c)(2)).No Violations Noted.Major Areas Inspected:Security Program Plans,Security Program Procedures,Security Organization & Administration IR 05000315/19970191997-11-24024 November 1997 Partially Withheld Insp Repts 50-315/97-19 & 50-316/97-19 on 970929-1003 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Security Staff Knowledge & Performance,Training & Qualification Program & Organization & Administration IR 05000315/19970071997-04-25025 April 1997 Partially Withheld Insp Repts 50-315/97-07 & 50-316/97-07 on 970324-28 (Ref 10CFR73.21).No Violations.Major Areas Inspected:Review of Physical Security Program IR 05000315/19960081996-10-25025 October 1996 Insp Repts 50-315/96-08 & 50-316/96-08 on 960909-13.No Violations Noted.Major Areas Inspected:Licensee Assessment of Performance in Area of Physical Security IR 05000315/19930231993-12-0202 December 1993 Partially Withheld Insp Repts 50-315/93-23 & 50-316/93-23 on 931117-19 & 22-24 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Protected & Vital Area Physical Barriers IR 05000315/19930021993-02-0505 February 1993 Partially Withheld Insp Repts 50-315/93-02 & 50-316/93-02 on 930119-22.No Violations Noted.Major Areas Inspected:Mgt Support,Protected & Vital Area Physical Barriers,Detection Sys & Detection Aid & Protected & Vital Area Access Control IR 05000315/19910111991-06-27027 June 1991 Insp Repts 50-315/91-11 & 50-316/91-11 on 910501-0614.No Violations Noted.Major Areas Inspected:Plant Operations, Reactor Trip,Maint & Surveillance,Engineering & Technical Support & Actions on Previously Identified Items IR 05000315/19900231990-11-29029 November 1990 Insp Repts 50-315/90-23 & 50-316/90-23 on 901010-901113.No Violations Noted.Major Areas Inspected:Plant Operations & Maintenance & Surveillance IR 05000315/19880181988-08-19019 August 1988 Partially Withheld Insp Repts 50-315/88-18 & 50-316/88-21 on 880705-21 (Ref 10CFR73.21).Noncompliances Noted.Major Areas Inspected:Mgt Effectiveness,Records & Repts,Testing & Maint, Power Supply,Lighting,Compensatory Measures & Vital Areas IR 05000315/19870421987-12-30030 December 1987 Partially Withheld Insp Repts 50-315/87-42 & 50-316/87-42 on 871207-10 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Personnel Training & Qualifications,Safeguards Contingency Plan & Compensatory Measures IR 05000206/19870141987-08-31031 August 1987 Insp Repts 50-206/87-14,50-361/87-13 & 50-362/87-15 on 870524-0704.Violations Noted.Major Areas Inspected: Operational Safety Verification,Evaluation of Plant Trips & Events,Monthly Surveillance Activities & Maint Activities IR 05000315/19870041987-03-17017 March 1987 Safety Insp Repts 50-315/87-04 & 50-316/87-04 on 870127-0223.No Violations or Deviations Noted in Five of Six Areas Inspected.Violation Re Visitor Escort Deficiency Addressed in Insp Repts 50-315/87-08 & 50-316/87-08 IR 05000315/19870081987-03-16016 March 1987 Partially Withheld Insp Repts 50-315/87-08 & 50-316/87-08 on 870127-0223 (Ref 10CFR73.21).Violation Noted:Visitor Escort Deficiency IR 05000315/19860381987-03-0303 March 1987 Addendum to Insp Repts 50-315/86-38 & 50-316/86-38,providing Criteria for Comparing Results of Capability Tests & Verification Measurements IR 05000315/19870061987-02-26026 February 1987 Insp Repts 50-315/87-06 & 50-316/87-06 on 870209-11.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise.Exercise Weakness Noted in Area of Protective Action Recommendations IR 05000315/19870051987-02-20020 February 1987 Insp Repts 50-315/87-05 & 50-316/87-05 on 870211-12.No Violations or Deviations Noted.Major Areas Inspected:Insp, Testing & Seal Replacement Program for Large Bore Steam Generator Snubbers IR 05000315/19870031987-02-18018 February 1987 Insp Repts 50-315/87-03 & 50-316/87-03 on 861216-870126. Violations Noted:Untimely Return to Svc Testing & Inappropriate Surveillance Test Acceptance Criteria IR 05000315/19860411987-01-16016 January 1987 Insp Repts 50-315/86-41 & 50-316/86-41 on 861104-1215. Apparent Violation Noted:Failure to Perform Timely post- Maint Operability Test on Valve & Subsequent Performance of Opposite Train Maint Being Tracked as Unresolved Issue IR 05000315/19860391986-12-0101 December 1986 Partially Withheld Physical Protection Insp Repts 50-315/86-39 & 50-316/86-39 on 861103-06 (Ref 10CFR73.21). No Violations Noted.Licensee Identified Concerns Re Personnel Access Control Program & Contingency Personnel IR 05000315/19860401986-11-28028 November 1986 Insp Repts 50-315/86-40 & 50-316/86-40 on 861103-07.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program IR 05000315/19860321986-10-17017 October 1986 Partially Withheld Reactive Physical Security Insp Repts 50-315/86-32 & 50-316/86-32 on 860818-22 & 0908-11 (Ref 10CFR73.21).No Noncompliance Noted.Major Areas Inspected: Inadequate Maint of Safety Equipment.Details Withheld IR 05000315/19860361986-10-0101 October 1986 Insp Repts 50-315/86-36 & 50-316/86-36 on 860922-23.No Violations,Weaknesses or Deviations Noted.Major Areas Inspected:Emergency Preparedness Drill Involving Observations of Key Functions & Locations IR 05000315/19860271986-08-20020 August 1986 Insp Repts 50-315/86-27 & 50-316/86-27 on 860707-11. Violation Noted:Failure to Adequately Test ESF Response Time in Unit 1 Steam Generator Water Level hi-hi Level Turbine Trip Reactor Trip Test ML20206R9231986-06-30030 June 1986 Exam Rept 50-315/OLS-86-02 on 860519-22.Results of Exam:All Senior Reactor Operator Candidates & Seven Reactor Operator Candidates Passed IR 05000315/19860161986-06-25025 June 1986 Insp Repts 50-315/86-16 & 50-316/86-16 on 860609-11.No Noncompliance,Deviation or Deficiency Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000315/19860241986-06-20020 June 1986 Partially Withheld Physical Security Insp Repts 50-315/86-24 & 50-316/86-24 on 860604-05 (Ref 10CFR73.21).Noncompliance Noted:Items Not Searched or Secured as Required by Security Plan IR 05000315/19860211986-05-21021 May 1986 Mgt Meeting Repts 50-315/86-21 & 50-316/86-21 on 860508. Major Areas Discussed:Licensee Corrective Action Plan IR 05000315/19860031986-02-11011 February 1986 Reactive Physical Security Insp Repts 50-315/86-03 & 50-316/86-03 on 860113-16.Violations Noted:Personnel Inadequately Searched.Details Withheld (Ref 10CFR73.21) IR 05000315/19860021986-02-0606 February 1986 Insp Repts 50-315/86-02 & 50-316/86-02 on 860121-24.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program,Including Detection & Classification & Protective Action Decisionmaking IR 05000315/19850351985-12-19019 December 1985 Insp Repts 50-315/85-35 & 50-316/85-35 on 851029-1108.No Violation Identified.Major Areas Inspected:Failure of Unit 2 Reactor Trip Breaker to Actuate During Unit Trip on 851029 IR 05000315/19850381985-12-19019 December 1985 Physical Security Insp Repts 50-315/85-38 & 50-316/85-38 on 851118-21.No Violations Noted.Major Areas Inspected:Security Mgt Effectiveness,Security Organization & Security Program Audit.Details Withheld (Ref 10CFR73.21) IR 05000315/19850391985-12-0606 December 1985 Matl Control & Accounting Insp Repts 50-315/85-39 & 50-316/85-39 on 851118-21.No Noncompliance Noted.Major Areas Inspected:Reactors.Details Withheld (Ref 10CFR2.790) IR 05000315/19840211985-10-22022 October 1985 Addendum Consisting of Confirmatory Measurements Program Data Sheet to Insp Repts 50-315/84-21 & 50-316/84-23 IR 05000315/19850231985-09-0404 September 1985 Physical Protection Insp Repts 50-315/85-23 & 50-316/85-23 on 850812-15.No Noncompliance Noted.Concern for Weapons Proficiency & Adequacy of Compensatory Measures Identified. Details Withheld (Ref 10CFR73.21) IR 05000315/19850051985-08-0101 August 1985 Insp Repts 50-315/85-05 & 50-316/85-05 on 850708-12.No Violations or Deviations Noted.Major Areas Inspected: Previous Insp Findings,Lers & Independent Insp of Detector, Burnup & Crunch Computer Codes IR 05000315/19850161985-07-23023 July 1985 Insp Repts 50-315/85-16 & 50-316/85-16 on 850521-0624. Violation Noted:Failure to Follow/Comply W/Requirements of Request for tie-rod Change ML20129A0261985-07-0909 July 1985 Safeguards Insp Repts 50-315/85-18 & 50-316/85-19 on 850618- 19.Violations Noted:Failure to Adequately Control Access to Vital Areas.Details Withheld (Ref 10CFR73.21) IR 05000316/20040301985-05-31031 May 1985 Insp Repts 50-352/85-16 & 50-353/85-04 on 850316-0430. Violation Noted:Inadequate cross-discipline Review Capability in Plant Operations Review Subcommittee Reviewing Rev 2 to Procedures Re Sodium Pentaborate Analysis IR 05000316/20040111985-04-24024 April 1985 Insp Rept 50-416/85-09 on 850316-0411.Violations Noted: Steps in Sp 06-EL-1E31-M-0001 Performed Out of Sequence Resulting in ESF Containment Isolation Valve Actuation & Causing Isolation of RCIC Sys IR 05000315/19830011983-04-14014 April 1983 IE Insp Repts 50-315/83-01 & 50-316/83-01 on 830117-21 & 0217.No Noncompliance Noted.Major Areas Inspected:Qa/Qc Organization & Program Work Controls,Design Controls & Control of Contractor Activities IR 05000315/19820111982-07-14014 July 1982 IE Insp Repts 50-315/82-11 & 50-316/82-11 on 820501-0615. Noncompliance Noted:Failure to Take Adequate & Timely Corrective Actions & Failure to Maintain Functional Penetration Fire Barrier IR 05000315/19820051982-06-24024 June 1982 IE Emergency Preparedness Appraisal Repts 50-315/82-05 & 50-316/82-05 on 820315-26.Noncompliance Noted:Failure to Maintain,In State of Readiness,Adequate Interim Emergency Operations Facility IR 05000315/19820101982-06-0808 June 1982 IE Insp Repts 50-315/82-10 & 50-316/82-10 on 820314-0430. Noncompliance Noted:Failure to Follow Equipment Control Procedures When Taking Unit 2 E Centrifugal Charging Pump Out of Svc & Failure to Make Prompt Rept IR 05000315/19820091982-06-0404 June 1982 IE Insp Repts 50-315/82-09 & 50-316/82-09 on 820329-31.No Noncompliance Noted.Major Areas Inspected:Observation of Emergency Exercise Involving Integrated Response from State of Mi & Local Counties.Fema/Nrc Exercise Scenario Encl IR 05000315/19780291978-10-20020 October 1978 IE Inspec Repts 50-315/78-29 & 50-316/78-27 on 780925-29 During Which 4 Items of Noncompliance Were Noted:Security Organization,Communications Control,Detection Aids & Testing & Maintenance 1999-10-15 Category:INSPECTION REPORT MONTHYEARIR 05000315/19990271999-10-15015 October 1999
[Table view]Partially Deleted Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24 (Ref 10CFR73.21).Noncited Violation Noted.Major Areas Inspected:Plant Support Activities Re Physical Protection of Plant Facility. 15 IR 05000315/19980241998-12-14014 December 1998 Partially Withheld Insp Repts 50-315/98-24 & 50-316/98-24 on 981112-19 (Ref 10CFR73.71).Violations Noted.Major Areas Inspected:Plant Support Activities Re Physical Protection of DC Cook Facility IR 05000315/19980111998-06-0202 June 1998 Partially Withheld Insp Repts 50-315/98-11 & 50-316/98-11 on 980504-08 (Ref 10CFR73.21(c)(2)).No Violations Noted.Major Areas Inspected:Security Program Plans,Security Program Procedures,Security Organization & Administration IR 05000315/19970191997-11-24024 November 1997 Partially Withheld Insp Repts 50-315/97-19 & 50-316/97-19 on 970929-1003 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Security Staff Knowledge & Performance,Training & Qualification Program & Organization & Administration IR 05000315/19970071997-04-25025 April 1997 Partially Withheld Insp Repts 50-315/97-07 & 50-316/97-07 on 970324-28 (Ref 10CFR73.21).No Violations.Major Areas Inspected:Review of Physical Security Program IR 05000315/19960081996-10-25025 October 1996 Insp Repts 50-315/96-08 & 50-316/96-08 on 960909-13.No Violations Noted.Major Areas Inspected:Licensee Assessment of Performance in Area of Physical Security IR 05000315/19930231993-12-0202 December 1993 Partially Withheld Insp Repts 50-315/93-23 & 50-316/93-23 on 931117-19 & 22-24 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Protected & Vital Area Physical Barriers IR 05000315/19930021993-02-0505 February 1993 Partially Withheld Insp Repts 50-315/93-02 & 50-316/93-02 on 930119-22.No Violations Noted.Major Areas Inspected:Mgt Support,Protected & Vital Area Physical Barriers,Detection Sys & Detection Aid & Protected & Vital Area Access Control IR 05000315/19910111991-06-27027 June 1991 Insp Repts 50-315/91-11 & 50-316/91-11 on 910501-0614.No Violations Noted.Major Areas Inspected:Plant Operations, Reactor Trip,Maint & Surveillance,Engineering & Technical Support & Actions on Previously Identified Items IR 05000315/19900231990-11-29029 November 1990 Insp Repts 50-315/90-23 & 50-316/90-23 on 901010-901113.No Violations Noted.Major Areas Inspected:Plant Operations & Maintenance & Surveillance IR 05000315/19880181988-08-19019 August 1988 Partially Withheld Insp Repts 50-315/88-18 & 50-316/88-21 on 880705-21 (Ref 10CFR73.21).Noncompliances Noted.Major Areas Inspected:Mgt Effectiveness,Records & Repts,Testing & Maint, Power Supply,Lighting,Compensatory Measures & Vital Areas IR 05000315/19870421987-12-30030 December 1987 Partially Withheld Insp Repts 50-315/87-42 & 50-316/87-42 on 871207-10 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Personnel Training & Qualifications,Safeguards Contingency Plan & Compensatory Measures IR 05000206/19870141987-08-31031 August 1987 Insp Repts 50-206/87-14,50-361/87-13 & 50-362/87-15 on 870524-0704.Violations Noted.Major Areas Inspected: Operational Safety Verification,Evaluation of Plant Trips & Events,Monthly Surveillance Activities & Maint Activities IR 05000315/19870041987-03-17017 March 1987 Safety Insp Repts 50-315/87-04 & 50-316/87-04 on 870127-0223.No Violations or Deviations Noted in Five of Six Areas Inspected.Violation Re Visitor Escort Deficiency Addressed in Insp Repts 50-315/87-08 & 50-316/87-08 IR 05000315/19870081987-03-16016 March 1987 Partially Withheld Insp Repts 50-315/87-08 & 50-316/87-08 on 870127-0223 (Ref 10CFR73.21).Violation Noted:Visitor Escort Deficiency IR 05000315/19860381987-03-0303 March 1987 Addendum to Insp Repts 50-315/86-38 & 50-316/86-38,providing Criteria for Comparing Results of Capability Tests & Verification Measurements IR 05000315/19870061987-02-26026 February 1987 Insp Repts 50-315/87-06 & 50-316/87-06 on 870209-11.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise.Exercise Weakness Noted in Area of Protective Action Recommendations IR 05000315/19870051987-02-20020 February 1987 Insp Repts 50-315/87-05 & 50-316/87-05 on 870211-12.No Violations or Deviations Noted.Major Areas Inspected:Insp, Testing & Seal Replacement Program for Large Bore Steam Generator Snubbers IR 05000315/19870031987-02-18018 February 1987 Insp Repts 50-315/87-03 & 50-316/87-03 on 861216-870126. Violations Noted:Untimely Return to Svc Testing & Inappropriate Surveillance Test Acceptance Criteria IR 05000315/19860411987-01-16016 January 1987 Insp Repts 50-315/86-41 & 50-316/86-41 on 861104-1215. Apparent Violation Noted:Failure to Perform Timely post- Maint Operability Test on Valve & Subsequent Performance of Opposite Train Maint Being Tracked as Unresolved Issue IR 05000315/19860391986-12-0101 December 1986 Partially Withheld Physical Protection Insp Repts 50-315/86-39 & 50-316/86-39 on 861103-06 (Ref 10CFR73.21). No Violations Noted.Licensee Identified Concerns Re Personnel Access Control Program & Contingency Personnel IR 05000315/19860401986-11-28028 November 1986 Insp Repts 50-315/86-40 & 50-316/86-40 on 861103-07.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program IR 05000315/19860321986-10-17017 October 1986 Partially Withheld Reactive Physical Security Insp Repts 50-315/86-32 & 50-316/86-32 on 860818-22 & 0908-11 (Ref 10CFR73.21).No Noncompliance Noted.Major Areas Inspected: Inadequate Maint of Safety Equipment.Details Withheld IR 05000315/19860361986-10-0101 October 1986 Insp Repts 50-315/86-36 & 50-316/86-36 on 860922-23.No Violations,Weaknesses or Deviations Noted.Major Areas Inspected:Emergency Preparedness Drill Involving Observations of Key Functions & Locations IR 05000315/19860271986-08-20020 August 1986 Insp Repts 50-315/86-27 & 50-316/86-27 on 860707-11. Violation Noted:Failure to Adequately Test ESF Response Time in Unit 1 Steam Generator Water Level hi-hi Level Turbine Trip Reactor Trip Test ML20206R9231986-06-30030 June 1986 Exam Rept 50-315/OLS-86-02 on 860519-22.Results of Exam:All Senior Reactor Operator Candidates & Seven Reactor Operator Candidates Passed IR 05000315/19860161986-06-25025 June 1986 Insp Repts 50-315/86-16 & 50-316/86-16 on 860609-11.No Noncompliance,Deviation or Deficiency Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000315/19860241986-06-20020 June 1986 Partially Withheld Physical Security Insp Repts 50-315/86-24 & 50-316/86-24 on 860604-05 (Ref 10CFR73.21).Noncompliance Noted:Items Not Searched or Secured as Required by Security Plan IR 05000315/19860211986-05-21021 May 1986 Mgt Meeting Repts 50-315/86-21 & 50-316/86-21 on 860508. Major Areas Discussed:Licensee Corrective Action Plan IR 05000315/19860031986-02-11011 February 1986 Reactive Physical Security Insp Repts 50-315/86-03 & 50-316/86-03 on 860113-16.Violations Noted:Personnel Inadequately Searched.Details Withheld (Ref 10CFR73.21) IR 05000315/19860021986-02-0606 February 1986 Insp Repts 50-315/86-02 & 50-316/86-02 on 860121-24.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program,Including Detection & Classification & Protective Action Decisionmaking IR 05000315/19850351985-12-19019 December 1985 Insp Repts 50-315/85-35 & 50-316/85-35 on 851029-1108.No Violation Identified.Major Areas Inspected:Failure of Unit 2 Reactor Trip Breaker to Actuate During Unit Trip on 851029 IR 05000315/19850381985-12-19019 December 1985 Physical Security Insp Repts 50-315/85-38 & 50-316/85-38 on 851118-21.No Violations Noted.Major Areas Inspected:Security Mgt Effectiveness,Security Organization & Security Program Audit.Details Withheld (Ref 10CFR73.21) IR 05000315/19850391985-12-0606 December 1985 Matl Control & Accounting Insp Repts 50-315/85-39 & 50-316/85-39 on 851118-21.No Noncompliance Noted.Major Areas Inspected:Reactors.Details Withheld (Ref 10CFR2.790) IR 05000315/19840211985-10-22022 October 1985 Addendum Consisting of Confirmatory Measurements Program Data Sheet to Insp Repts 50-315/84-21 & 50-316/84-23 IR 05000315/19850231985-09-0404 September 1985 Physical Protection Insp Repts 50-315/85-23 & 50-316/85-23 on 850812-15.No Noncompliance Noted.Concern for Weapons Proficiency & Adequacy of Compensatory Measures Identified. Details Withheld (Ref 10CFR73.21) IR 05000315/19850051985-08-0101 August 1985 Insp Repts 50-315/85-05 & 50-316/85-05 on 850708-12.No Violations or Deviations Noted.Major Areas Inspected: Previous Insp Findings,Lers & Independent Insp of Detector, Burnup & Crunch Computer Codes IR 05000315/19850161985-07-23023 July 1985 Insp Repts 50-315/85-16 & 50-316/85-16 on 850521-0624. Violation Noted:Failure to Follow/Comply W/Requirements of Request for tie-rod Change ML20129A0261985-07-0909 July 1985 Safeguards Insp Repts 50-315/85-18 & 50-316/85-19 on 850618- 19.Violations Noted:Failure to Adequately Control Access to Vital Areas.Details Withheld (Ref 10CFR73.21) IR 05000316/20040301985-05-31031 May 1985 Insp Repts 50-352/85-16 & 50-353/85-04 on 850316-0430. Violation Noted:Inadequate cross-discipline Review Capability in Plant Operations Review Subcommittee Reviewing Rev 2 to Procedures Re Sodium Pentaborate Analysis IR 05000316/20040111985-04-24024 April 1985 Insp Rept 50-416/85-09 on 850316-0411.Violations Noted: Steps in Sp 06-EL-1E31-M-0001 Performed Out of Sequence Resulting in ESF Containment Isolation Valve Actuation & Causing Isolation of RCIC Sys IR 05000315/19830011983-04-14014 April 1983 IE Insp Repts 50-315/83-01 & 50-316/83-01 on 830117-21 & 0217.No Noncompliance Noted.Major Areas Inspected:Qa/Qc Organization & Program Work Controls,Design Controls & Control of Contractor Activities IR 05000315/19820111982-07-14014 July 1982 IE Insp Repts 50-315/82-11 & 50-316/82-11 on 820501-0615. Noncompliance Noted:Failure to Take Adequate & Timely Corrective Actions & Failure to Maintain Functional Penetration Fire Barrier IR 05000315/19820051982-06-24024 June 1982 IE Emergency Preparedness Appraisal Repts 50-315/82-05 & 50-316/82-05 on 820315-26.Noncompliance Noted:Failure to Maintain,In State of Readiness,Adequate Interim Emergency Operations Facility IR 05000315/19820101982-06-0808 June 1982 IE Insp Repts 50-315/82-10 & 50-316/82-10 on 820314-0430. Noncompliance Noted:Failure to Follow Equipment Control Procedures When Taking Unit 2 E Centrifugal Charging Pump Out of Svc & Failure to Make Prompt Rept IR 05000315/19820091982-06-0404 June 1982 IE Insp Repts 50-315/82-09 & 50-316/82-09 on 820329-31.No Noncompliance Noted.Major Areas Inspected:Observation of Emergency Exercise Involving Integrated Response from State of Mi & Local Counties.Fema/Nrc Exercise Scenario Encl IR 05000315/19780291978-10-20020 October 1978 IE Inspec Repts 50-315/78-29 & 50-316/78-27 on 780925-29 During Which 4 Items of Noncompliance Were Noted:Security Organization,Communications Control,Detection Aids & Testing & Maintenance 1999-10-15 Category:UTILITY MONTHYEARIR 05000315/19880181988-08-19019 August 1988
[Table view]Partially Withheld Insp Repts 50-315/88-18 & 50-316/88-21 on 880705-21 (Ref 10CFR73.21).Noncompliances Noted.Major Areas Inspected:Mgt Effectiveness,Records & Repts,Testing & Maint, Power Supply,Lighting,Compensatory Measures & Vital Areas IR 05000315/19870421987-12-30030 December 1987 Partially Withheld Insp Repts 50-315/87-42 & 50-316/87-42 on 871207-10 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Personnel Training & Qualifications,Safeguards Contingency Plan & Compensatory Measures IR 05000206/19870141987-08-31031 August 1987 Insp Repts 50-206/87-14,50-361/87-13 & 50-362/87-15 on 870524-0704.Violations Noted.Major Areas Inspected: Operational Safety Verification,Evaluation of Plant Trips & Events,Monthly Surveillance Activities & Maint Activities IR 05000315/19870041987-03-17017 March 1987 Safety Insp Repts 50-315/87-04 & 50-316/87-04 on 870127-0223.No Violations or Deviations Noted in Five of Six Areas Inspected.Violation Re Visitor Escort Deficiency Addressed in Insp Repts 50-315/87-08 & 50-316/87-08 IR 05000315/19870081987-03-16016 March 1987 Partially Withheld Insp Repts 50-315/87-08 & 50-316/87-08 on 870127-0223 (Ref 10CFR73.21).Violation Noted:Visitor Escort Deficiency IR 05000315/19860381987-03-0303 March 1987 Addendum to Insp Repts 50-315/86-38 & 50-316/86-38,providing Criteria for Comparing Results of Capability Tests & Verification Measurements IR 05000315/19870061987-02-26026 February 1987 Insp Repts 50-315/87-06 & 50-316/87-06 on 870209-11.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise.Exercise Weakness Noted in Area of Protective Action Recommendations IR 05000315/19870051987-02-20020 February 1987 Insp Repts 50-315/87-05 & 50-316/87-05 on 870211-12.No Violations or Deviations Noted.Major Areas Inspected:Insp, Testing & Seal Replacement Program for Large Bore Steam Generator Snubbers IR 05000315/19870031987-02-18018 February 1987 Insp Repts 50-315/87-03 & 50-316/87-03 on 861216-870126. Violations Noted:Untimely Return to Svc Testing & Inappropriate Surveillance Test Acceptance Criteria IR 05000315/19860411987-01-16016 January 1987 Insp Repts 50-315/86-41 & 50-316/86-41 on 861104-1215. Apparent Violation Noted:Failure to Perform Timely post- Maint Operability Test on Valve & Subsequent Performance of Opposite Train Maint Being Tracked as Unresolved Issue IR 05000315/19860391986-12-0101 December 1986 Partially Withheld Physical Protection Insp Repts 50-315/86-39 & 50-316/86-39 on 861103-06 (Ref 10CFR73.21). No Violations Noted.Licensee Identified Concerns Re Personnel Access Control Program & Contingency Personnel IR 05000315/19860401986-11-28028 November 1986 Insp Repts 50-315/86-40 & 50-316/86-40 on 861103-07.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program IR 05000315/19860361986-10-0101 October 1986 Insp Repts 50-315/86-36 & 50-316/86-36 on 860922-23.No Violations,Weaknesses or Deviations Noted.Major Areas Inspected:Emergency Preparedness Drill Involving Observations of Key Functions & Locations IR 05000315/19860271986-08-20020 August 1986 Insp Repts 50-315/86-27 & 50-316/86-27 on 860707-11. Violation Noted:Failure to Adequately Test ESF Response Time in Unit 1 Steam Generator Water Level hi-hi Level Turbine Trip Reactor Trip Test ML20206R9231986-06-30030 June 1986 Exam Rept 50-315/OLS-86-02 on 860519-22.Results of Exam:All Senior Reactor Operator Candidates & Seven Reactor Operator Candidates Passed IR 05000315/19860161986-06-25025 June 1986 Insp Repts 50-315/86-16 & 50-316/86-16 on 860609-11.No Noncompliance,Deviation or Deficiency Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000315/19860241986-06-20020 June 1986 Partially Withheld Physical Security Insp Repts 50-315/86-24 & 50-316/86-24 on 860604-05 (Ref 10CFR73.21).Noncompliance Noted:Items Not Searched or Secured as Required by Security Plan IR 05000315/19860211986-05-21021 May 1986 Mgt Meeting Repts 50-315/86-21 & 50-316/86-21 on 860508. Major Areas Discussed:Licensee Corrective Action Plan IR 05000315/19860031986-02-11011 February 1986 Reactive Physical Security Insp Repts 50-315/86-03 & 50-316/86-03 on 860113-16.Violations Noted:Personnel Inadequately Searched.Details Withheld (Ref 10CFR73.21) IR 05000315/19860021986-02-0606 February 1986 Insp Repts 50-315/86-02 & 50-316/86-02 on 860121-24.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program,Including Detection & Classification & Protective Action Decisionmaking IR 05000315/19850351985-12-19019 December 1985 Insp Repts 50-315/85-35 & 50-316/85-35 on 851029-1108.No Violation Identified.Major Areas Inspected:Failure of Unit 2 Reactor Trip Breaker to Actuate During Unit Trip on 851029 IR 05000315/19850381985-12-19019 December 1985 Physical Security Insp Repts 50-315/85-38 & 50-316/85-38 on 851118-21.No Violations Noted.Major Areas Inspected:Security Mgt Effectiveness,Security Organization & Security Program Audit.Details Withheld (Ref 10CFR73.21) IR 05000315/19850391985-12-0606 December 1985 Matl Control & Accounting Insp Repts 50-315/85-39 & 50-316/85-39 on 851118-21.No Noncompliance Noted.Major Areas Inspected:Reactors.Details Withheld (Ref 10CFR2.790) IR 05000315/19840211985-10-22022 October 1985 Addendum Consisting of Confirmatory Measurements Program Data Sheet to Insp Repts 50-315/84-21 & 50-316/84-23 IR 05000315/19850231985-09-0404 September 1985 Physical Protection Insp Repts 50-315/85-23 & 50-316/85-23 on 850812-15.No Noncompliance Noted.Concern for Weapons Proficiency & Adequacy of Compensatory Measures Identified. Details Withheld (Ref 10CFR73.21) IR 05000315/19850051985-08-0101 August 1985 Insp Repts 50-315/85-05 & 50-316/85-05 on 850708-12.No Violations or Deviations Noted.Major Areas Inspected: Previous Insp Findings,Lers & Independent Insp of Detector, Burnup & Crunch Computer Codes IR 05000315/19850161985-07-23023 July 1985 Insp Repts 50-315/85-16 & 50-316/85-16 on 850521-0624. Violation Noted:Failure to Follow/Comply W/Requirements of Request for tie-rod Change ML20129A0261985-07-0909 July 1985 Safeguards Insp Repts 50-315/85-18 & 50-316/85-19 on 850618- 19.Violations Noted:Failure to Adequately Control Access to Vital Areas.Details Withheld (Ref 10CFR73.21) IR 05000316/20040301985-05-31031 May 1985 Insp Repts 50-352/85-16 & 50-353/85-04 on 850316-0430. Violation Noted:Inadequate cross-discipline Review Capability in Plant Operations Review Subcommittee Reviewing Rev 2 to Procedures Re Sodium Pentaborate Analysis IR 05000316/20040111985-04-24024 April 1985 Insp Rept 50-416/85-09 on 850316-0411.Violations Noted: Steps in Sp 06-EL-1E31-M-0001 Performed Out of Sequence Resulting in ESF Containment Isolation Valve Actuation & Causing Isolation of RCIC Sys IR 05000315/19830011983-04-14014 April 1983 IE Insp Repts 50-315/83-01 & 50-316/83-01 on 830117-21 & 0217.No Noncompliance Noted.Major Areas Inspected:Qa/Qc Organization & Program Work Controls,Design Controls & Control of Contractor Activities IR 05000315/19820111982-07-14014 July 1982 IE Insp Repts 50-315/82-11 & 50-316/82-11 on 820501-0615. Noncompliance Noted:Failure to Take Adequate & Timely Corrective Actions & Failure to Maintain Functional Penetration Fire Barrier IR 05000315/19820051982-06-24024 June 1982 IE Emergency Preparedness Appraisal Repts 50-315/82-05 & 50-316/82-05 on 820315-26.Noncompliance Noted:Failure to Maintain,In State of Readiness,Adequate Interim Emergency Operations Facility IR 05000315/19820101982-06-0808 June 1982 IE Insp Repts 50-315/82-10 & 50-316/82-10 on 820314-0430. Noncompliance Noted:Failure to Follow Equipment Control Procedures When Taking Unit 2 E Centrifugal Charging Pump Out of Svc & Failure to Make Prompt Rept IR 05000315/19820091982-06-0404 June 1982 IE Insp Repts 50-315/82-09 & 50-316/82-09 on 820329-31.No Noncompliance Noted.Major Areas Inspected:Observation of Emergency Exercise Involving Integrated Response from State of Mi & Local Counties.Fema/Nrc Exercise Scenario Encl IR 05000315/19780291978-10-20020 October 1978 IE Inspec Repts 50-315/78-29 & 50-316/78-27 on 780925-29 During Which 4 Items of Noncompliance Were Noted:Security Organization,Communications Control,Detection Aids & Testing & Maintenance 1988-08-19 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000315/19990271999-10-15015 October 1999
[Table view]Partially Deleted Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24 (Ref 10CFR73.21).Noncited Violation Noted.Major Areas Inspected:Plant Support Activities Re Physical Protection of Plant Facility. 15 IR 05000315/19980241998-12-14014 December 1998 Partially Withheld Insp Repts 50-315/98-24 & 50-316/98-24 on 981112-19 (Ref 10CFR73.71).Violations Noted.Major Areas Inspected:Plant Support Activities Re Physical Protection of DC Cook Facility ML20154L9861998-10-13013 October 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500,000.Violation Noted:As of 980227,licensee Had Not Provided Instructions Appropriate to Circumstances for Activity Affecting Quality IR 05000315/19980111998-06-0202 June 1998 Partially Withheld Insp Repts 50-315/98-11 & 50-316/98-11 on 980504-08 (Ref 10CFR73.21(c)(2)).No Violations Noted.Major Areas Inspected:Security Program Plans,Security Program Procedures,Security Organization & Administration IR 05000315/19970191997-11-24024 November 1997 Partially Withheld Insp Repts 50-315/97-19 & 50-316/97-19 on 970929-1003 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Security Staff Knowledge & Performance,Training & Qualification Program & Organization & Administration IR 05000315/19970071997-04-25025 April 1997 Partially Withheld Insp Repts 50-315/97-07 & 50-316/97-07 on 970324-28 (Ref 10CFR73.21).No Violations.Major Areas Inspected:Review of Physical Security Program IR 05000315/19960081996-10-25025 October 1996 Insp Repts 50-315/96-08 & 50-316/96-08 on 960909-13.No Violations Noted.Major Areas Inspected:Licensee Assessment of Performance in Area of Physical Security PNO-III-94-006, on 940121,licensee Commenced Shutdown of Unit 2 to Repair Steam Leak That Was Discovered in Vicinity of SG 1.Leak Was Repaired 940125 & Plant Has Commenced Startup1994-01-25025 January 1994 PNO-III-94-006:on 940121,licensee Commenced Shutdown of Unit 2 to Repair Steam Leak That Was Discovered in Vicinity of SG 1.Leak Was Repaired 940125 & Plant Has Commenced Startup IR 05000315/19930231993-12-0202 December 1993 Partially Withheld Insp Repts 50-315/93-23 & 50-316/93-23 on 931117-19 & 22-24 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Protected & Vital Area Physical Barriers IR 05000315/19930021993-02-0505 February 1993 Partially Withheld Insp Repts 50-315/93-02 & 50-316/93-02 on 930119-22.No Violations Noted.Major Areas Inspected:Mgt Support,Protected & Vital Area Physical Barriers,Detection Sys & Detection Aid & Protected & Vital Area Access Control PNO-III-92-045, on 920908,unit Shut Down Due to High Generator Vibrations.Cause Undetermined.Licensee Will Remove & Inspect Generator Rotor1992-09-0909 September 1992 PNO-III-92-045:on 920908,unit Shut Down Due to High Generator Vibrations.Cause Undetermined.Licensee Will Remove & Inspect Generator Rotor IR 05000315/19910111991-06-27027 June 1991 Insp Repts 50-315/91-11 & 50-316/91-11 on 910501-0614.No Violations Noted.Major Areas Inspected:Plant Operations, Reactor Trip,Maint & Surveillance,Engineering & Technical Support & Actions on Previously Identified Items IR 05000315/19900231990-11-29029 November 1990 Insp Repts 50-315/90-23 & 50-316/90-23 on 901010-901113.No Violations Noted.Major Areas Inspected:Plant Operations & Maintenance & Surveillance PNO-III-90-049, on 900713,one Person Killed & Three Others Injured When Fatally Injured Worker Touched Live Contact in 4-kV Cabinet.Licensee Declared Unusual Event Under Emergency Plan & Subsequently Terminated1990-07-13013 July 1990 PNO-III-90-049:on 900713,one Person Killed & Three Others Injured When Fatally Injured Worker Touched Live Contact in 4-kV Cabinet.Licensee Declared Unusual Event Under Emergency Plan & Subsequently Terminated PNO-III-90-033, on 900524,licensee Declared Emergency Plan After 765KV Switchyard Breaker Opened Unexpectedly & Control Room Received Rept of Fire & Explosion.Caused by Burning Oil from Crosstie Breaker L.Unit 1 Reduced Power to 62%1990-05-24024 May 1990 PNO-III-90-033:on 900524,licensee Declared Emergency Plan After 765KV Switchyard Breaker Opened Unexpectedly & Control Room Received Rept of Fire & Explosion.Caused by Burning Oil from Crosstie Breaker L.Unit 1 Reduced Power to 62% IR 05000315/19880181988-08-19019 August 1988 Partially Withheld Insp Repts 50-315/88-18 & 50-316/88-21 on 880705-21 (Ref 10CFR73.21).Noncompliances Noted.Major Areas Inspected:Mgt Effectiveness,Records & Repts,Testing & Maint, Power Supply,Lighting,Compensatory Measures & Vital Areas IR 05000315/19870421987-12-30030 December 1987 Partially Withheld Insp Repts 50-315/87-42 & 50-316/87-42 on 871207-10 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Personnel Training & Qualifications,Safeguards Contingency Plan & Compensatory Measures ML20235W2421987-10-0909 October 1987 Exam Repts 50-315/OL-87-02 & 50-316/OL-87-02 on 870804-07. Exam results:3 of 5 Senior Reactor Operator Candidates & 10 of 11 Reactor Operator Candidates Passed Exams ML20235E2681987-09-16016 September 1987 Exam Rept 50-315/OL-87-01 for Units 1 & 2 on 870622-24.Exam Results:Seven Senior Reactor Operators & Two Reactor Operators Failed PNO-III-87-113A, updates Util Evaluation of Defective & Incorrectly Installed Bolts in Facility Containment Access Area.Caused by Use of Improper Cutting & Welding Procedure. Evaluation Continuing1987-09-0303 September 1987 PNO-III-87-113A:updates Util Evaluation of Defective & Incorrectly Installed Bolts in Facility Containment Access Area.Caused by Use of Improper Cutting & Welding Procedure. Evaluation Continuing IR 05000206/19870141987-08-31031 August 1987 Insp Repts 50-206/87-14,50-361/87-13 & 50-362/87-15 on 870524-0704.Violations Noted.Major Areas Inspected: Operational Safety Verification,Evaluation of Plant Trips & Events,Monthly Surveillance Activities & Maint Activities PNO-III-87-100, on 870723,unusual Event Declared When Contractor Employee Wearing Slightly Contaminated Clothing Taken to Local Hosp.When Clothing Removed,Surveys of Individual & Hosp Showed No Contamination1987-07-24024 July 1987 PNO-III-87-100:on 870723,unusual Event Declared When Contractor Employee Wearing Slightly Contaminated Clothing Taken to Local Hosp.When Clothing Removed,Surveys of Individual & Hosp Showed No Contamination PNO-III-87-098, on 870714,undervoltage on Reactor Coolant Pump Bus Occurred.Caused by Tripping of Unit from 80% Power Due to Voltage Variation.Licensee Decided to Shut Down Unit to Repair Minor Leaks in Reactor Cooling Sys1987-07-15015 July 1987 PNO-III-87-098:on 870714,undervoltage on Reactor Coolant Pump Bus Occurred.Caused by Tripping of Unit from 80% Power Due to Voltage Variation.Licensee Decided to Shut Down Unit to Repair Minor Leaks in Reactor Cooling Sys PNO-III-87-081, on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other Plants1987-06-11011 June 1987 PNO-III-87-081:on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other Plants IR 05000315/19870041987-03-17017 March 1987 Safety Insp Repts 50-315/87-04 & 50-316/87-04 on 870127-0223.No Violations or Deviations Noted in Five of Six Areas Inspected.Violation Re Visitor Escort Deficiency Addressed in Insp Repts 50-315/87-08 & 50-316/87-08 IR 05000315/19870081987-03-16016 March 1987 Partially Withheld Insp Repts 50-315/87-08 & 50-316/87-08 on 870127-0223 (Ref 10CFR73.21).Violation Noted:Visitor Escort Deficiency ML20207R3701987-03-0909 March 1987 EN-87-015:on 870312,notice of Violation & Proposed Imposition of Civil Penalties in Amount of $50,000 Will Be Issued for License.Action Based on Violation of Tech Spec Re ECCS Subsystems PNO-III-87-032, on 870302,slow,steady Increase in Primary to Secondary Steam Generator Tube Leakage Monitored.On 870303, Leak Estimated at 0.2 Gpm & Unit Taken Out of Svc.Tube Will Be Repaired & Surveillance & Maint Program Implemented1987-03-0404 March 1987 PNO-III-87-032:on 870302,slow,steady Increase in Primary to Secondary Steam Generator Tube Leakage Monitored.On 870303, Leak Estimated at 0.2 Gpm & Unit Taken Out of Svc.Tube Will Be Repaired & Surveillance & Maint Program Implemented IR 05000315/19860381987-03-0303 March 1987 Addendum to Insp Repts 50-315/86-38 & 50-316/86-38,providing Criteria for Comparing Results of Capability Tests & Verification Measurements IR 05000315/19870061987-02-26026 February 1987 Insp Repts 50-315/87-06 & 50-316/87-06 on 870209-11.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise.Exercise Weakness Noted in Area of Protective Action Recommendations IR 05000315/19870051987-02-20020 February 1987 Insp Repts 50-315/87-05 & 50-316/87-05 on 870211-12.No Violations or Deviations Noted.Major Areas Inspected:Insp, Testing & Seal Replacement Program for Large Bore Steam Generator Snubbers ML20211J5281987-02-18018 February 1987 Notice of Violation from Insp on 861216-870126 IR 05000315/19870031987-02-18018 February 1987 Insp Repts 50-315/87-03 & 50-316/87-03 on 861216-870126. Violations Noted:Untimely Return to Svc Testing & Inappropriate Surveillance Test Acceptance Criteria IR 05000315/19860411987-01-16016 January 1987 Insp Repts 50-315/86-41 & 50-316/86-41 on 861104-1215. Apparent Violation Noted:Failure to Perform Timely post- Maint Operability Test on Valve & Subsequent Performance of Opposite Train Maint Being Tracked as Unresolved Issue ML20207P5111987-01-0606 January 1987 Exam Rept 50-315/OL-86-03 on 861202-04.Exam Results:Two Senior Reactor Operators & Two Retake Reactor Operators Passed IR 05000315/19860391986-12-0101 December 1986 Partially Withheld Physical Protection Insp Repts 50-315/86-39 & 50-316/86-39 on 861103-06 (Ref 10CFR73.21). No Violations Noted.Licensee Identified Concerns Re Personnel Access Control Program & Contingency Personnel IR 05000315/19860401986-11-28028 November 1986 Insp Repts 50-315/86-40 & 50-316/86-40 on 861103-07.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program ML20214F8181986-11-18018 November 1986 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000.Violations Noted:Wire Lifted at Same Time & Crossed in Power Range Nuclear Instrument Channel NI-41 Without Use of Lifted Wire Form ML20214A3261986-11-13013 November 1986 EN-86-085:on 861118,notice of Violation & Proposed Imposition of Civil Penalties in Amount of $25,000 Issued Based on Failure of Personnel to Follow Procedures,Rendering Two of Four power-range ex-cores Inoperable PNO-III-86-130, on 861105,during QA Audit of Contractor, Access Badges Removed Due to Inadequacies W/Screening Program.Employees Not Permitted to Return Until Screening Performed by Independent Organization1986-11-0606 November 1986 PNO-III-86-130:on 861105,during QA Audit of Contractor, Access Badges Removed Due to Inadequacies W/Screening Program.Employees Not Permitted to Return Until Screening Performed by Independent Organization IR 05000315/19860321986-10-17017 October 1986 Partially Withheld Reactive Physical Security Insp Repts 50-315/86-32 & 50-316/86-32 on 860818-22 & 0908-11 (Ref 10CFR73.21).No Noncompliance Noted.Major Areas Inspected: Inadequate Maint of Safety Equipment.Details Withheld IR 05000315/19860361986-10-0101 October 1986 Insp Repts 50-315/86-36 & 50-316/86-36 on 860922-23.No Violations,Weaknesses or Deviations Noted.Major Areas Inspected:Emergency Preparedness Drill Involving Observations of Key Functions & Locations PNO-III-86-096, on 860911,bomb Threat Received at Telephone Switchboard,Stating That Bomb Placed in Training Ctr.Ctr Evacuated & Facility Searched.No Bomb Found.Nrc Info Assessment Team Notified1986-09-12012 September 1986 PNO-III-86-096:on 860911,bomb Threat Received at Telephone Switchboard,Stating That Bomb Placed in Training Ctr.Ctr Evacuated & Facility Searched.No Bomb Found.Nrc Info Assessment Team Notified PNO-III-86-094, on 860910,federal Grand Jury in State of Mi Western District Indicted Util & Jg Del Percio W/Violations of NRC Fire Protection Requirements Occurring from Mar 1981 - Apr 19821986-09-10010 September 1986 PNO-III-86-094:on 860910,federal Grand Jury in State of Mi Western District Indicted Util & Jg Del Percio W/Violations of NRC Fire Protection Requirements Occurring from Mar 1981 - Apr 1982 ML20206N4901986-08-21021 August 1986 Notice of Violation from Insp on 860707-11 IR 05000315/19860271986-08-20020 August 1986 Insp Repts 50-315/86-27 & 50-316/86-27 on 860707-11. Violation Noted:Failure to Adequately Test ESF Response Time in Unit 1 Steam Generator Water Level hi-hi Level Turbine Trip Reactor Trip Test PNO-III-86-072, on 860722,reactor Tripped While Operating at 90% Power.Caused by Workman Error While Attempting to Calibr Stator Cooling Water Pressure Switches.Util Will Proceed to Cold Shutdown for Repairs & Perform Snubber Surveillances1986-07-23023 July 1986 PNO-III-86-072:on 860722,reactor Tripped While Operating at 90% Power.Caused by Workman Error While Attempting to Calibr Stator Cooling Water Pressure Switches.Util Will Proceed to Cold Shutdown for Repairs & Perform Snubber Surveillances ML20206R9231986-06-30030 June 1986 Exam Rept 50-315/OLS-86-02 on 860519-22.Results of Exam:All Senior Reactor Operator Candidates & Seven Reactor Operator Candidates Passed IR 05000315/19860161986-06-25025 June 1986 Insp Repts 50-315/86-16 & 50-316/86-16 on 860609-11.No Noncompliance,Deviation or Deficiency Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000315/19860241986-06-20020 June 1986 Partially Withheld Physical Security Insp Repts 50-315/86-24 & 50-316/86-24 on 860604-05 (Ref 10CFR73.21).Noncompliance Noted:Items Not Searched or Secured as Required by Security Plan 1999-10-15 |
Inspection Report - Cook - 1984021 | |
---|---|
Assessments |
Text
- *
T AE4L E II U S NUCLEAR REGULATORY COMMISSION OFFICE OF INEPECTION AND ENFORCEMENT CONFIRMATORY MEASUREMENTS PROGRAM FACILITY: D.C. COOK FOR THE 4 OUARTER OF 1984
_ _ _. - - - N R C - - - - - -- ----LICENSEE---- ---LICENSEE:NRC----
SAMPLE ISOTOPE RESULT ERROR RESULT ERROR RATIO RES T L WASTE EdETA 5.SE-06 2.OE-07 1.3E-05 3.7E-06 2.3E 00 2.9E 03 D H-3 5.SE-02 6.OE-04 5.SE-02 1.1E-04 1.OE 00 6.SE 01 A SR-89 1.4E-08 C.OE-09 1.4E-08 4.6E-09 9.OE-01 1.SE 00 N SR-90 2.OE-09 5.OE-09 < 5. 6E-09 O.OE-01 2.SE 00 4.OE-01 N T TEST RESULTS:
A= AGREEMENT D= DISAGREEMENT
+= CRITERIA RELAXED N=NO COMF'ARISON 0510280316 051022 PDR ADOCK0500pg5 0