REGION III
I Report No. 50-315/85023(DRSS); 50-316/85023(DRSS)
J Docket No. 50-315; 50-316 Licenses No. DRP-58; DPR-74 Safeguards Group IV
~!
Licensee:
American Electric Power Service Corporation Indiana and Michigan Electric Company
1 Riverside Plaza Columbus, OH 43216 i
Facility Name:
Donald C. Cook Nuclear Power Plant, Units 1 and 2
,
Inspection At:
Donald C. Cook Site, Bridgman, MI Inspection Conducted:
August 12-15, 1985 Date of Last Physical Protection Inspection:
January 7-11, 1985 Type of Inspection:
Announced, Routine Physical Protection
,
Inspectors:
hd 7b/98
l Physcial Security Inspector Dath
,
l
. R.
'
1, Physical Security Inspector Date
%b h
i N(g G. L. Pirtle
,
,
.!
Physical Security Inspector Date l
Approved By:
Creed, Chief f
$4fegaards Section Da~te
Inspection Summary l
Inspection on August 12-15, 1985 (Reports No. 315/85023(DRSS); 316/85023(DRSS))
l Areas Inspected:
Included a review of the Security Plan and Implementing i
Procedures; Management Effectiveness; Records and Reports; Testing and i
Maintenance; Locks, Keys and Combinations; Physical Barriers - Protected and l
Vital Areas; Compensatory Measures; Assessment Aids; Detection Aids -
-
Protected and Vital Areas; Alarm Stations; Personnel Training and Qualifications
!
- General Requirements; Safeguards Contingency Plan Implementation and l
Licensee Action on Previous Inspection Findings.
The inspection involved
!
84 direct inspector-hours by three NRC inspectors.
The inspection began during
'
,
the day shift.
L; c kn;re contr iv.
'
i CArCCU!'JtDS IhFCD'.ATIGl
'
,
i Upon :eparation this l
AM $
y5 N h WMUd
'
. - -..,, -, -
., -,
-, _ _.,. _ - -.,,.
-, _... _.. _ -. -, - -. -.... - -., - -, -,. - -
.,.,
_ _ -,
.
D-
.
Results:
The licensee was found to be in compliance with NRC requirements within the areas examined during the inspection; however, two concerns were identified.
The first concern dealt with weapons proficiency and the second concern dealt with the adequacy of compensatory measures.
In addition, one previously identified violation remains open pending licensee completion of corrective action.
J,,,
e,,.-
,
U.: ~.1, Z l!J L :'. ; ll s
Upca ccparation this pngo is Decontrolloi f
.