Partially Withheld Insp Repts 50-315/93-02 & 50-316/93-02 on 930119-22.No Violations Noted.Major Areas Inspected:Mgt Support,Protected & Vital Area Physical Barriers,Detection Sys & Detection Aid & Protected & Vital Area Access Control
ML20128F958
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/05/1993
From: Belanger J, Creed J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20128F926 List:
References
50-315-93-02, 50-315-93-2, 50-316-93-02, 50-316-93-2, NUDOCS 9302120092
Download: ML20128F958 (2)


Text

- _ _ _ _. _

.

,-

U.S. NUCLEAR REGULATORY COMMISSION REGION 111 Reports No. 50-315/93002(DRSS); 50-316/93002(DRSS)

Docket Nos. 50-315; 50 316 Licenses No. DPR-58; DPR-74

,

Licensee:

Indiana F.ichigan Power Company 1 Riverside Plaza Colu6us, OH 43216 Facility Name: Donald C. Cook Nuclear Power Station, Units 1 and 2 Inspection At: Donald C. Cook Plant Site, Bridgman, Michigan Inspection Conducted:

January 19-22, 1993 Date of Previous Physical Security Inspection: May 18-22, 1992 Inspector:

QOmw L blottc41 M / 'll Jamet L. Belanger

\\1 Date Senior Physical Security Inspector O

Approved By:

.h C

/ James R. Creed, Chief Date

' Safeguards Section Jnsoection Summary inspection on January 19-22. 1993 (Reports No. 50-315/93002(DRSS): No. 50-316/93002(DRSS))

Areas Insoected:

Routine, announced physical security inspection involving Management Support; Protected and Vital Area Physical Barriers, Detection Systems and Detection Aids; Protected and Vital Area Access Control of Personnel and Packages; Alarm Station and Communications; and Fitness For Duty Event followup.

Results: The licensee was found to be in compliance with NRC requirements except for one licensee identified non-cited violation pertaining to 10 CFR Part 26, Appendix A, Section 2.9(c):

The results of a for-cause drug test was reported to the licensee

.

prior to the individual being provided an opportunity for an interview with the MR0.

The licensee's actions taken in response to information received from the NRC were timely, comprehensive, and well documented. The licensee's changes in Medical Review Officer notifications assured compliance with the intent of the Rule.

Enclosuro Containa s m ou m m m Iog

9302120092 930205 PDft ADOCK 05000315 Upon Separation Thia

)

O PDR Paco Io Decontrolled

_

_ _ _ _ _ _ _ _ _ - _ _

..

.

...

.

.r

__

.

-

-

a

,

.

,

'This inspection was the.last routine security inspection of-the current.SALP

'

. cycle. The~ majority of 'the core inspection effort-was completed during two previous inspections. This inspection showed that the program. continued to; receive excellent' management support and attention as shown by the substantial

reduction in the personnel _ error and equipment events identified in the safeguards event log report submitted to the NRC. Management support was also

,

evidenced by the recent procurement of.a computerized' badge fabrication. system i

to-increase efficiency and versatility.

Staff vacancies in several' key security. management positions were successfully filled.

Fitness-for-duty functions were centralized in-the security-department r ulting -in improved communications and consistency in Rule

'

implementat so.

Tactical response capability improved through the conduct' of limited force Don force drills in the plant and' range instruction in the

'

tactical combat course.

t The licensee's inclusion of a full time lock and key custodian within the security organization was considered a program strength that significantly

,

reduced vital area door problems.

-The licensee's full time drug dog and handler within the security organization was also considered a program strength that has produced excellent liaisons

'

with local law enforcement agencies.