ML20134C125

From kanterella
Revision as of 00:40, 3 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Aug 1996 for Wolf Creek Generating Station & Revised Operating Status Repts for June & Jul 1996
ML20134C125
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/13/1996
From: Warren C
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134C128 List:
References
WO-96-0134, WO-96-134, NUDOCS 9609250264
Download: ML20134C125 (7)


Text

>

. . I W@LF CREEK NUCLEAR OPERATING CORPORATION Clay C. Warren Chief Operating Officer September 13, 1996 WO 96-0134 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, D. C. 20555 l

Subject:

Docket No. 50-482: August, 1996, Monthly ,

Operating Report j Gentlemen:

I Attachment 1 to this letter is the August, 1996, Monthly Operating Report for Wolf Creek Generating Station. This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.

Attachment 2 provides corrected page 3 of the June, 1996, and page 3 of the ,

July, 1996, Monthly Operating Reports. These corrections reflect changes to l the. Maximum Dependable Capacity Factor, from 1,167 to 1,163, effective June

]

1, 1996, and changes to the Unit Capacity Factor, i very truly yours, i

Clay C. Warren CCW/jad Attachments

,{k. s cc: L. J. Callan (NRC), w/a W. D. Johnson (NRC), w/a J. F. Ringwald (NRC), w/a J. C. Stone (NRC), w/a

\

9609250264 960913 \

PDR ADOCK 05000482 R PDR P O. Box 411/ Burlington, KS 66839 / Phone. (316) 364-8831 An Equal Opporturuty Employer M F HCcVET i