ML20134C137

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Jul 1996 for Wolf Creek Generating Station
ML20134C137
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/31/1996
From:
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20134C128 List:
References
NUDOCS 9609250274
Download: ML20134C137 (1)


Text

l l

Attedhment 2 to WO 96-0134

  • Page 2,of 2, OPERATING DATA REPORT DOCKET NO. 50-482 1 WOLF CREEK GENERATING STATION l WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 8-7-96 TELEPHONE 316-364-8831 OPERATING STATUS
1. Reporting Period: July, 1996 Gross Hours in Reporting Period: 744
3. Currently Authorized Power Level (MWt): 3565 Max. Depend. Capacity (MWe-Net): 1163 l

Design Electrical Rating (MWe-Net) : 1170

3. Power Level to Which Restricted (If Any) (MWe-Net) : N/A i
4. Reasons for Restriction (If Any) : N/A This Month Yr. to Date Cumulative
5. Number of Hours Reactor was Critical 744.0 3,462.2 78,078.9
6. Reactor Reserve Shutdown Hours 0.0 0.0 339.8
7. Hours Generator on Line 744.0 3,407.2 77,186.9 i l
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWh) 2,642,811 11,880,644 257,222,314
10. Gross Electrical Energy Generated (MWh) 903,592.0 4,094,911 89,353,831
11. Net Electrical Energy Generated (MWh) 867,137.0 3,889,806 85,326,657
12. Reactor Service Factor 100.0% 67.7% 81.6%
13. Reactor Availability Factor 100.0% 67.7% 82.0%
14. Unit Service Factor 100.0% 66.7% B0.7% i
15. Unit Availability Factor 100.0% 66.7% 80.7%
16. Unit Capacity Factor (Using MDC) 100.2% 65.3% 78.4%
17. Unit Capacity Factor (Using Design MWe) 99.6% 65.0% 76.3%
18. Unit Forced Outage Rate 0.0% 4.5% 4.7%
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each):

None

20. If Shut Down at End of Report Period, Estimate Date of Startup: N/A Wolf Creek Generating Station Monthly Operating Report July, 1996 Page 3 of 6 9609250274 960913 PDR ADOCK 05000482 R PDH