MONTHYEARML20217G3721999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With ML20212C4761999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With ML20216E3781999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20209H3831999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With ML20195K2951999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20206R5031999-04-30030 April 1999 Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With ML20205P9811999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20204C3111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20199G3641998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20197K1161998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20195F8061998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Sequoyah Nuclear Plant.With ML20154H6091998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20153B0881998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Sequoyah Nuclear Plant.With ML20237B5221998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Snp ML20236R0051998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Sequoyah Nuclear Plant ML20249A8981998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Sequoyah Nuclear Plant,Units 1 & 2 ML20247L5141998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Sequoyah Nuclear Plant ML20217E2221998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Sequoyah Nuclear Plant ML20248L2611998-02-28028 February 1998 Monthly Operating Repts for Sequoyah Nuclear Plant,Units 1 & 2 ML20202J7911998-01-31031 January 1998 Monthly Operating Repts for Jan 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199A2931997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20198M1481997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20197J1011997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199C7201997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Sequoyah Nuclear Plant ML20198J8941997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20216J6011997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Sequoyah Nuclear Plant ML20210K5781997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Sequoyah Nuclear Plant ML20141H3071997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20140H1571997-05-31031 May 1997 Monthly Operating Repts for May 1997 for SQN ML20141F4321997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Sequoyah Nuclear Plant Units 1 & 2 ML20137T3011997-03-31031 March 1997 Monthly Operating Repts for March 1997 for SQN ML20136H2191997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for SQN ML20134M2001997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for SQN ML20133K4861996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Sequoyah Nuclear Plant Units 1 & 2 ML20133A1121996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for SQN Plant ML20134N2501996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Sequoyah Nuclear Plant ML20128Q0251996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Sequoyah Nuclear Plant,Units 1 & 2 ML20129C2181996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Sequoyah Nuclear Plant ML20116M1511996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Sequoyah Nuclear Plant ML20115H0371996-06-30030 June 1996 Monthly Operating Repts for June 1996 for SQN ML20112H6351996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Sequoyah Nuclear Plant ML20112A7901996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Sequoyah Unit 1 & 2 ML20107B7591996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Sequoyah Nuclear Plant,Units 1 & 2 ML20101D3351996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Sequoyah Nuclear Plant ML20149K2341996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Snp ML20096F0201995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Snp ML20095J0461995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Snp ML20094L7381995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Sequoyah Nuclear Plant ML20093F5351995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Sequoyah Nuclear Plant ML20092G2981995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Sequoyah Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212J6311999-10-0101 October 1999 SER Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plant,Unit 1 ML20217G3721999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With ML20212F0831999-09-23023 September 1999 Safety Evaluation Granting Relief from Certain Weld Insp at Sequoyah Nuclear Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year ISI Interval ML20212F4761999-09-23023 September 1999 Safety Evaluation Supporting Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively ML20212C4761999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With ML20210L4361999-08-0202 August 1999 Cycle 9 12-Month SG Insp Rept ML20216E3781999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20210L4451999-07-31031 July 1999 Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept ML20210G6631999-07-28028 July 1999 Cycle 9 90-Day ISI Summary Rept ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209H3831999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With ML20211F9031999-06-30030 June 1999 Cycle 9 Refueling Outage ML20196J8521999-06-28028 June 1999 Safety Evaluation Authorizing Proposed Alternative to Use Iqis for Radiography Examinations as Provided for in ASME Section III,1992 Edition with 1993 Addenda,Pursuant to 10CFR50.55a(a)(3)(i) ML20195K2951999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20206Q8951999-05-0505 May 1999 Rev 0 to L36 990415 802, COLR for Sequoyah Unit 2 Cycle 10 ML20206R5031999-04-30030 April 1999 Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With ML20205P9811999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20204C3111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20205B6631999-02-28028 February 1999 Underground Storage Tank (Ust) Permanent Closure Rept, Sequoyah Nuclear Plant Security Backup DG Ust Sys ML20203H7381999-02-18018 February 1999 Safety Evaluation of Topical Rept BAW-2328, Blended U Lead Test Assembly Design Rept. Rept Acceptable Subj to Listed Conditions ML20211A2021999-01-31031 January 1999 Non-proprietary TR WCAP-15129, Depth-Based SG Tube Repair Criteria for Axial PWSCC Dented TSP Intersections ML20198S7301998-12-31031 December 1998 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept ML20199G3641998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20197J5621998-12-0303 December 1998 Unit 1 Cycle 9 90-Day ISI Summary Rept ML20197K1161998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20195F8061998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Sequoyah Nuclear Plant.With ML20154H6091998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20154H6251998-09-17017 September 1998 Rev 0 to Sequoyah Nuclear Plant Unit 1 Cycle 10 Colr ML20153B0881998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Sequoyah Nuclear Plant.With ML20239A0631998-08-27027 August 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Sequoyah Nuclear Plant,Units 1 & 2 ML20236Y2091998-08-0707 August 1998 Safety Evaluation Accepting Relief Requests RP-03,RP-05, RP-07,RV-05 & RV-06 & Denying RV-07 & RV-08 ML20237B5221998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Snp ML20237A4411998-07-31031 July 1998 Blended Uranium Lead Test Assembly Design Rept ML20236P6441998-07-10010 July 1998 LER 98-S01-00:on 980610,failure of Safeguard Sys Occurred for Which Compensatory Measures Were Not Satisfied within Required Time Period.Caused by Inadequate Security Procedure.Licensee Revised Procedure MI-134 ML20236R0051998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Sequoyah Nuclear Plant ML20249A8981998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Sequoyah Nuclear Plant,Units 1 & 2 ML20247L5141998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Sequoyah Nuclear Plant ML20217K4471998-04-27027 April 1998 Safety Evaluation Supporting Requests for Relief 1-ISI-2 (Part 1),2-ISI-2 (Part 2),1-ISI-5,2-ISI-5,1-ISI-6,1-ISI-7, 2-ISI-7,ISPT-02,ISPT-04,ISPT-06,ISPT-07,ISPT-8,ISPT-01 & ISPT-05 ML20217E2221998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Sequoyah Nuclear Plant ML20248L2611998-02-28028 February 1998 Monthly Operating Repts for Sequoyah Nuclear Plant,Units 1 & 2 ML20199J2571998-01-31031 January 1998 Cycle 9 Voltage-Based Repair Criteria 90-Day Rept ML20202J7911998-01-31031 January 1998 Monthly Operating Repts for Jan 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199J2441998-01-29029 January 1998 Snp Unit 2 Cycle Refueling Outage Oct 1997 ML20199F8531998-01-13013 January 1998 ASME Section XI Inservice Insp Summary Rept for Snp Unit 2 Refueling Outage Cycle 8 ML20199A2931997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20198M1481997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20197J1011997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199C2951997-11-13013 November 1997 LER 97-S01-00:on 971017,vandalism of Electrical Cables Was Observed.Caused by Vandalism.Repaired Damaged Cables, Interviewed Personnel Having Potential for Being in Area at Time Damage Occurred & Walkdowns ML20199C7201997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Sequoyah Nuclear Plant L-97-215, SG Secondary Side Loose Object Safety Evaluation1997-10-23023 October 1997 SG Secondary Side Loose Object Safety Evaluation 1999-09-30
[Table view] |
Text
wr -
- *' (e , '* .,e il' t
p .
En tennessee Vaney Authuitt. Post Off<te Box 20C0 Scday Daisy Tennessee 37379 i
't March 15, 1995 U.S. Nuclear Regulatory Commission ATTN Document Control Desk washington, D.C. 20555 Gentlemen In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - FEBRUARY 1995 MONTHLY OPERATING REPORT .l l
Enclosed is the February 1995 Monthly Operating Report as required by SQN Technical Specification 6.9.1.10.
If you have any questions concerning this matter, please call l J. W. Proffitt at (615) 843-6651. I i
Sincerely, i
N R. H. Shell (
Manager SQN Site Licensing ;
Enclosure cc See page 2 21020e 98 9503210509 950228 '
l !
gDR ADOCK 05000327 PDR
$. ;. j, ; - -
.. =
U.S. Nuclear Regulatory Commission 2 .Page 2 March.15, 1995 cc (Enclosure):
INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. D. E. LaBarge, Project Manager U.S. Nuclear. Regulatory Commission One White. Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Joseph Santucci, Manager Advanced Reactor Department Electric Power Research Institute 3340 Hillview Avenue !
Palo Alto, California 94304 !
.NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administration U.S. Nuclear Regulatory Commission Office of Inspection and-Enforcement Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, suite 2900 ,
Atlanta, Georgia 30323-2711 Mr. F. Yost, Director Research Services Utility Data Institute 1200 0 Street, NW, Suite 250.
Washington, D.C. 20005
< , 1
/
, '!' ji 4:
'I g, t TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT i
MONTHLY OPERATING REPORT .
TO THE NUCLEAR REGULATORY COMMISSION FEBRUARY 1995 l
J UNIT 1 I
DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 ;
4 l
UNIT 2 DOCKET NUMBER 50-328 l
LICENSE NUMBER DPR-79 l
f .
4 OPERATIONAL
SUMMARY
FEBRUARY 1995 ,
1
)
UNIT 1 1
. Unit 1 generated 639,850 megawatthours (MWh) (gross)' electrical power during February with a capacity factor of 82.7 percent. ,
On February 23 at approximately 1600 EST, with the reactor operating at
~
j 100 percent power, Unit 1 experienced a reactor coolant system (RCS) leak .
at a compression fitting on a reactor vessel level indicating system 1 (RVLIS) line in the incore instrument room. A notice of unusual event ;
was declared at 1715 EST as a result of an RCS unidentified leakage.in {
excess of the technical specification limit. At 1717 EST, an emergency ;
shutdown was initiated. The generator was taken offline at 1811 EST, and l Unit 1 entered Mode 2 at 1810 EST. The Unit-1 reactor was taken subcritical, and the reactor trip breakers were opened at 1826 EST. On ,
FebruaLy 24 at 0029 EST, Unit 1 entered Mode 4.
Unit 1 remained in Mode 4 through the end of February as inspection continued on RVLIS compression fittings. I UNIT 2- J Unit 2 generated 784,510 megawatthours (MWh) (gross) electrical power $
during February with a capacity factor 99.3 percent. Unit 2 operated at near 100 percent reactor power throughout the month of February.
i l
1 I
a' 'E s
r AVERAGE DAILY UNIT POWER. LEVEL '
DOCKET NO. 50-327 UNIT No. -One .DATE: _Q)-02-95'
'I' COMPLETED BY: T. J. He11omo.D TELEPHONE: f6151 843-7528 MONTH: FEBRUARY 1995
,s AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL' f Rh1 (MWe-Net) Rh1 (MWe-Net) 1 1149 17 1127 2 i ' ', L_ 18 998 1153 1041 I 3 19 4 1143 20 1147 ,
5 1146 21 1151
- 6 1153 22 1154 l 7 1150 23 851 8 1149 24 -28 9 1149 25 -30 10 1150 26 -28 ;
11 1151 27 -26 ;
12 ,
1150 28 -28 13 1151 29 N/A 14 1154 30 N/A 1 15 1151 31 N/A 16 1150 l
.. _ . . .m .. . _. - . . ,
1d[
s -l , ,
- - 4 if 4' AVERAGE DAILY UNIT POWER LEVEL ,
1
~ DOCKET NO. 50-328 UNIT No. 'Two DATE: 03-02-95 v.
- COMPLETED BY: T. J. Hollomon TELEPHONE: f615) 843-7528 !
t MONTH: FEBRUARY 1995 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVELD l R&l -' fMWe-Net) QAl- (MWe-Net) 1 1140 17 1137 2 1139 18 1132 3 1140 19 1138 4 1137 20 1137 _
i S 1139 21 1137 6 1136 22 1140 ,
7 1136 23 1138
. 8 1136 24 1142 ,
9 1139 25 1143 I
10 1110 26 1142 5 1
11 1108 27 1143 12 1107 28 1143 13 1113 29 N/A l 14 1119 30 N/A I 15 1121 31 N/A 16 1112 l
+
4 1
l l
l
,o . , .
+
. OPERATING DATA REPORT DOCKET NO. 50-327 DATE 03/02/95 COMPLETED BY T. J. Hollomon TELEPHONE (615) 843-7528 OPERATING STATUS l Notes l
- 1. Unit Name: Seavovah Unit One l l
- 2. Re, m Ung Period: February 1995 l [
- 3. Licensel Thermal Power (MWt): 3411.0 l l
- 4. Namepiste Rating (Gross Hde): 1220.6 l l
- 5. Design Electrical Rating (Net MWe): 1148.0 l l
- 6. Maximum Dependable Capacity (Gross MWe): 1151.0 ___ l l
- 7. Maximum Dependable Capacity (Net HWe): 1111.0 l !
- 8. If Ct.anges Occur in Capacity Ratings (Item Numbers 3 Through 7) $1nce Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 672 1.416 119.785
- 12. Number of Hours Reactor Was Critical 546.4 1.290.4 63.340
- 13. Reactor Reserve Shutdown Hours C 0 0
- 14. Hours Generator On-Line 546.2 1.290.2 61.894.5
- 15. Unit Reserve Shutdown Hours 0 0 0 ,___
- 16. Gross Thermal Energy Generated (MWH) 1.837.960.3 4.371.863.7 .20116; 860
- 17. Gross Electrical Energy Generated (MWH) _ 639.850 1.524.710 68.575.594
- 18. Net Electrical Energy Generated (MWH) 616.194 1.473.880 65.737.293
- 19. Unit Service Factor 81.3 91.1 51.7 -
- 20. Unit Availability Factor 81.3 91.1 51.7
- 21. Unit Capacity Factor (Using MDC Net) 82.5 93.7 49.4
- 22. Unit Capacity Factor (Using DER Net) 79,9 90.7 47.8
- 23. Unit Forced Outage Rate 18.7 8.9 36.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Chut Down At End Of Report Period, Estimated Date of Startup:
l l
\
f- +. -
OPERATING DATA' REPORT- ,
DOCKET NO. 50-328
[m DATE= 03/02/95 COMPLETED BY T. J. Hollomon TELEPHONE -(615) 843-7528 3 OPERATING STATUS.
l Notes l '
- 1. Unit Name: Seauovah Unit Two -l l
- 2. Reporting Period: February 1995 l -l
. 3. Licensed Thermal Power (MWt): 3411.0 l l-
- 4. Nameplate Rating (Gross MWe): 1220.6 l l- ;
-S. Design Electrical Rating (Net HWe): 1148.0 l l
- 6. Maximum Dependable Capacity.(Gross MWe): 1146.0 l l i
- 7. Maximum Dependable Capacity (Net MWe): 1106.0 l I
- 8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A i
, 10. Reasons For Restrictions, If Any: N/A :
l This Month Yr-to-Date Cumulative. ,
- 11. Hours in Reporting Period 672 1.416 111.745 4
- 12. Number of Hours Reac'or. Was Critical 672.0 1.393.7 65.750
- 13. Reactor Reserve Shutdown Hours 0 0 0
- 14. Hours Generator On-Line 672.0 1.354.7 64.064.4
- 15. Unit Reserve Shutdown Hours 0 0 0'
- 16. Gross Thermal Energy Generated (MWH) 2,275.606.6 4.473.893.2 202.001.356
- 17. Gross Electrical Energy Generated (MWH) 784.510 1.537.493 68.545.102 [
- 18. Not Electrical Energy Generated (MWH) 758.230 1.482.037 65.596.219
- 19. Unit Service Factor 100.0 95.7 57.3
- 20. Unit Availability Factor 100.0 95.7 57.3
- 21. Unit Capacity Factor (Using MDC Net) 102.0 94.6 53.1
- 22. Unit Capacity Factor (Using DER Net) 98.3 91.2 51.1
- 23. Unit Forced Outage Rate 0.0 ' 4.3 34.7'
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
1 1
- " ' - n __.-
DOCKET NO: 50-327 UNIT SHUTE 0WNS AND POWER REDGCTIONS UNIT NAME: One
- DAYE: 03/03/95 REPORT MONTH: Febru a ry 1995 COMPLETED BY:1. J. Hollomon .
TELEPHONE:(615) 843-7528' Method of Licensee Cause and Corrective -
Duration Shutting Down Event System Compgnent Action to j No. Date Type l
(Hours) Reason 2 Reactor 3 Report No. Code # Code Prevent Recurrence 1 950223 F 125.8 A 1 50-327/95002 AB N/A At approximately 1600 EST, with the reactor operating at 100 percent power. Unit 1 experienced an RCS leak at a compression fitting on a i RVLIS line in the incore instrument room. This event was initiated by i a failed compression fitting on the
- RVLIS. An inspection of the fitting and tubing indicated that the tubing pulled out of the tee.
The ferrule remained inside the nut attached to the compression tee.
The force required to remove the nut was less than expected indi-cating that the compression fitting was not aroperly assembled. The failed fitting was repaired.
Approximately 450 fittings were '
inspected; approximately 151 indetenminate fittings were identi-fled. Thirty-nine of the 151 indeterminate fittings were dis-assembled and found to be properly install ed. Therefore, a high level of confidence exists in the reli-ability of the compression fitting joints at Sequoyah. A long-term action plan for the inspection of other systems.and the Unit 2 fittings will be determined.
Fittings that were determined to have incorrectly installed ferrules were corrected as appropriate.
2 Reason: 3 #Exhibit G-Instructions I:F Forced Method:
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Mairtenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restruction 4-Continuation of Existing Outage (NUREG-1022)
E-Operator Trainica and License Examination 5-Reduction F-Administrative 9-Other 5
G-Operational Error (Explain) Exhibit I-Same Source H-Other (Explain)
DOCKET NO: '50-328 UNIT SHUTDOWNS AND POWER REDUCTIONS - tmIT NAME: Two ;Ng *
- DATE: 03/03/95 :
REPORT M WTH: February 1995 COMPLETED BY:T. J. Hollanon. Y.' 5 TELEPHONE:(615) 843-7528 Method of Licensee Cause and Corrective =
l, Duration Shutting Down Event Systes. Action to 2 4 Compgeent No. Date Type l (Hours) Reason Reactor Report No. Code Code Prevent Recurrence i
There were no outages or power -
reductions of greater than 20 percent to repcrt during February.
?
s I:F Forced 2 Reason: 3 Method: #Exhibit G-Instructions 5: Scheduled A-Equipment Failure (Explain) 1-Manual - for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee -
C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restruction Continuation of Existing Outage (NOREG-1072)
E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other 5 Exhibit G-Operational Error (Explain) I-Same Source
~
H-Other (Explain) >
e
-__._--___ue- a g,_ _-
___.a __ " e - - A u e-% d'- N w"'* -W44 'i-d g i-.m. .iei--- a y p- g rip ,