Monthly Operating Repts for Mar 1996 for Sequoyah Nuclear Plant,Units 1 & 2
ML20107B759
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/31/1996
From: Hollomon T, Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9604170061
Download: ML20107B759 (10)


Text

_ _ . . _ . _

/

IUA

~

ten [ess ,e nie, Aame<4 'ObKadno h ody Da Tennesse. hhk l

April 11, 1996 l

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN)- MARCH 1996 MONTHLY OPERATING REPORT Enclosed is the March 1996 Monthly Operating Report as required by SQN Technical Specification 6.9.1.10.

If you have any questions concerning this matter, please call J. W. Prollitt at (423) 843-6651.

1 1

Sincerely, j

. Y.

R. H. Shell Manager

) SQN Site Licensing Enclosure cc: See page 2 1G0033 9604170061 960331 "

L .-

PDR ADOCK 05000327 R PDR A l

e ,

U.S. Nuclear Regulatory Conunission Page 2

, April 11, 1996 cc (Enclosure):

INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339 5957 l Mr. D. E. LaBarge, Project Manager

, U.S. NRC Regulatory Commission One White Flint, North 11555 Rockville Pike 4 Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 i

Regional Administrator  !

U.S. Nuclear Regulatory Commission j Region II 101 Marietta Street, NW, Suite 2900 ,

Atlanta, Georgia 30323-2711 Mr. James Lang, Director Nuclear Power Electric Power Research Institute 3412 Hilhiew Avenue Palo Alto, California 94304 Mr. F. Yost, Director Research Services Utility Data Institute 1200 G Street, NW, Suite 250 Washington, D.C. 20005

e .,

e TENNESSEE VALLEY AUTIIORITY SEQUOYAII NUCLEAR PLANT MONTHLY OPERATING REPORT TO TIIE NUCLEAR REGULATORY COMMISSION MARCH 1996 UNIT 1 '

DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 l

UNIT 2 DOCKET NUMBER 50-328 1

LICENSE NUMBER DPR-79 l

'I

- .. . . ,- . . . - . = _ _ _ - _ _ = . -. . ._

r ..

OPERATIONAL

SUMMARY

MARCH 1996 l UNIT 1 Unit I generated 494,822 megawatthours (MWh) (gross) electrical power during March with a capacity factor of 57.78 percent. Unit I was manually removed from service on March 2,1996, at 0348 EST for a planned maintenance outage for the No. 2 reactor coolant pump motor and seal replacement. Unit I was taken critical on March 13 at 2212 EST and was tied to the grid again on March 14 at 0927 EST. Unit I reached i 100 percent reactor power on March 16 and continued to operate at 100 percent through the end of March.

t UNIT 2 Unit 2 generated 880,760 megawatthours (MWh) (gross) electrical power during March with a capacity factor of103.30 percent. There were no outages or power reductions of greater than 20 percent to report during March. Unit 2 was operating at 100 percent reactor power at the end of March.

l l

l l

l l

a

(

i I

l

e ..

i 1'

l AVERAGE DAUN UNIT POWER LEVEL DOCKET NO. 50-327 UNIT NO. One DATE: 04-02-96 l COMPLETED BY: T. J. Hollomon TELEPHONE: (423) 843-7528 )

MONTH: MARCH 1996 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net) 1 1093 17 1140 2 36 18 1144 3 -12 19 1142 4 -12 20 1143

, 5 -12 21 1146 l

l 6 -12 22 1149 l

7 -12 23 1149 )

l 8 -12 24 1145 l

9 -12 25 1142 10 -16 26 1147 11 -33 27 1144 l l

12 -33 28 1144  !

13

-35 29 1144 14 127 30 1144 15 570 31 1142 4

16 893 l

l

i ..

e l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-328 UNIT NO. Two DATE: 04-02-96 l

COMPLETED BY: T. J. Hollomon TELEPHONE: (423) 843-7528  ;

I l

MONTH: MARCH 1996 I

l AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net) l 1 1151 17 1144 l

l 2 1150 18 1144 3 1148 19 1143 ,

l 4 1150 20 1141 5 1151 21 1141 1

! 6 1151 22 1145 7 1147 23 1145

, 8 1154 24 1142 9 1152 25 1141

=

10 1151 26 1144 11 1150 27 1143 12 1144 28 1143 13 1144 29 1145 14 1144 30 1145 15 1143 31 1144

(

l 16 1149 l

l l

OPERATING DATA REPORT DOCKET NO. 50 177 DATE 04/02/96 COMPLETED BY T. J. Hollomon TELEPHONE (423) 843-7528 OPERATING STATUS Notes

1. Unit Name: Scauovah Unit One
2. Reporting Period: March 1996
3. Licensed Thermal Power (MWt): 3411 0
4. Nameplate Rating (Gross (MWe): 1220.6
5. Design Electrical Rating (Net MWe): 114R0
6. Maximum Dependable Capacity (Gross MWe): 1151.0
7. Maximum Dependable Capacity (Net MWe): 1111 0
8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe): N/A
10. Reasons for Restrictions, If Any: N/A This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 744 2,184 129,313
12. Number ofHours Reactor Was Critical 461.6 1,887.2 70,782
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 453.4 1,835.6 69,062.0
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWh) 1,430,176.2 6,089,819.1 224,421,234
17. Gross Electrical Energy Generated (MWh) 494,822 2,107,588 _

76,272,933

18. Net Electrical Energy Generated (MWh) 472,646 2,031,036 73,115,183
19. Unit Service Factor 60 5 84.0 53.4
20. Unit Availability Factor 60 s 84.0 53.4
21. Unit Capacity Factor (Using MDC Net) 57 2 83.7 50.9
22. Unit Capacity Factor (Using DER Net) 55 3 81.0 49.3
23. Unit Forced Outage Rate 0.0 0.8 34.1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End ofReport Period, Estimated Date of Startup:

s ..

O OPERATING DATA REPORT DOCKET NO. 50-328 DATE 04/02/96 COMPLETED BY T. J. Hollomon TELEPHONE (423) 843-7528

_ OPERATING STATUS Notes

1. Unit Name: Seauovah Unit Two
2. Reporting Period: March 1996
3. Licensed Thermal Power (MWt): 34110
4. Nameplate Rating (Gross (MWe): 1220 6 f 5 Design Electrical Rating (Net MWe): 1148.0
6. Maximum Dependable Capacity (Gross MWe): 1146.0 l
7. Maximum Dependable Capacity (Net MWe): 1106.0 i
8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:

l

9. Power Level to Which Restricted, If Any (Net MWe): N/A i 10. Reasons for Restrictions, If Any: N/A l

l This Month Yr-to-Date Cumulative l

11. Hours in Reporting Period 744 2,184 121,273 -!
12. Number of Hours Reactor Was Critical 744.0 2,184.0 74,778
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 744.0 2,184.0 72,960.2 )
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWh) 2,532,090.0 7,437,276.4 231,978,873

, 17. Gross Electrical Energy Generated (MWh) 880,760 2,595,980 78,819,752 l 18. Net Electrical Energy Generated (MWh) . 851,920 2,510,692 75,512,561-

19. Unit Service Factor 100.0 100.0 60.2
20. Unit AvailabilityFactor 100o 100.0 60.2 i l
21. Unit Capacity Factor (Using MDC Net) 103 5 103.9 56.3
22. Unit Capacity Factor (Using DER Net) 99.7 100 1 54.2
23. Unit Forced Outage Rate 0.0 0.0 32.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration ofEach):

U2C7 refueling outage is scheduled to begin on April 19,1996, with a duration of 55 days l

25. If Shut Down At End of Report Period, Estimated Date of Startup:

t I

a

,, , <w, y cn.-- - --- -w..-

DOCKET NO.: 50-327 UNIT NAME: One UNIT SIRflT) OWNS AND POWER REDUCTIONS DATE: 04/03/96 COMPLETED BY: T. J. Hollomon REPORT MONTH: MARCH 19% TELEPHONE: (423) 843-7528 2

No. Date Type' Duration Reason Method of Licensee System Component Cause and Corrective Action to Prevent (Hours) Shutting Event Code' Code' Ramma Down Report No.

Reactor' 5 960302 S 293.7 B 1 N/A AB P Unit I was manually removed from senice for a planned maintenance activity invohing the No. 2 reactor coolant pump (RCP) motor and seal replacement. The RCP developed a leak at the No. 3 seal. The leak resulted in boric acid build up on the RCP motor cooler restricting air flow causing an increase in the motor temperature. The RCP motor temperature has been stable for the past month. The RCP was replaced to facilitate future outage needs. Unit I was taken critical on March 13 at 2212 EST and uns tied to the grid on March 14 at 0927 EST.

Unit I was operating at 100 percent reactor power again on March 16.

2

'F: Forced Reason: ' Method ' Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-1022)

E-Operator Training and License Exam 5-Reduction 5

F-Administrative 9-Other Exhibit I- Same Source G-Operational Error (Explain)

H-Other (Explain)

, ~, x DOCKET NO.: 50-328 UNIT NAME: Tun UNIT SHUTDOWNS AND POWER REDUCTIONS DATE: 04A)3/96 COMPLETED BY: T.1 Hollomon RPPORTMONTH: MARCH 19% TELEPHONE: (423) 843-7528 2

No. Date Type' Duration Reason Method of Licensee System Component Cause and Corrective Action to Prevent d

(Hours) Shutting Event Code Code' Recurrence Down Report No.

Reactor' There were no outages or power reductions of greater than 20 percent to report during March.

2

'F: Forced Reason: ' Method ' Exhibit G-Instructions i S: Scheduled A-Equipment Failore (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee .

C-Refueling 3-Automatic Scram Event Report (LER) File  !

D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-1022)

E-Operator Training and License Exam 5-Reduction F-Administrative 9-Other ' Exhibit 1 - Same Source G-Operational Error (Explain)

H-Other (Explain)

. . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ . . . . . _ . . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ . _ _ _ _ _ _____ ._______- _- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _