Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G3721999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With ML20212C4761999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With ML20216E3781999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20209H3831999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With ML20195K2951999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20206R5031999-04-30030 April 1999 Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With ML20205P9811999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20204C3111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20199G3641998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20197K1161998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20195F8061998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Sequoyah Nuclear Plant.With ML20154H6091998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20153B0881998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Sequoyah Nuclear Plant.With ML20237B5221998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Snp ML20236R0051998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Sequoyah Nuclear Plant ML20249A8981998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Sequoyah Nuclear Plant,Units 1 & 2 ML20247L5141998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Sequoyah Nuclear Plant ML20217E2221998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Sequoyah Nuclear Plant ML20248L2611998-02-28028 February 1998 Monthly Operating Repts for Sequoyah Nuclear Plant,Units 1 & 2 ML20202J7911998-01-31031 January 1998 Monthly Operating Repts for Jan 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199A2931997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20198M1481997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20197J1011997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199C7201997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Sequoyah Nuclear Plant ML20198J8941997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20216J6011997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Sequoyah Nuclear Plant ML20210K5781997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Sequoyah Nuclear Plant ML20141H3071997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20140H1571997-05-31031 May 1997 Monthly Operating Repts for May 1997 for SQN ML20141F4321997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Sequoyah Nuclear Plant Units 1 & 2 ML20137T3011997-03-31031 March 1997 Monthly Operating Repts for March 1997 for SQN ML20136H2191997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for SQN ML20134M2001997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for SQN ML20133K4861996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Sequoyah Nuclear Plant Units 1 & 2 ML20133A1121996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for SQN Plant ML20134N2501996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Sequoyah Nuclear Plant ML20128Q0251996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Sequoyah Nuclear Plant,Units 1 & 2 ML20129C2181996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Sequoyah Nuclear Plant ML20116M1511996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Sequoyah Nuclear Plant ML20115H0371996-06-30030 June 1996 Monthly Operating Repts for June 1996 for SQN ML20112H6351996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Sequoyah Nuclear Plant ML20112A7901996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Sequoyah Unit 1 & 2 ML20107B7591996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Sequoyah Nuclear Plant,Units 1 & 2 ML20101D3351996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Sequoyah Nuclear Plant ML20149K2341996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Snp ML20096F0201995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Snp ML20095J0461995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Snp ML20094L7381995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Sequoyah Nuclear Plant ML20093F5351995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Sequoyah Nuclear Plant ML20092G2981995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Sequoyah Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212J6311999-10-0101 October 1999 SER Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plant,Unit 1 ML20217G3721999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With ML20212F0831999-09-23023 September 1999 Safety Evaluation Granting Relief from Certain Weld Insp at Sequoyah Nuclear Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year ISI Interval ML20212F4761999-09-23023 September 1999 Safety Evaluation Supporting Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively ML20212C4761999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With ML20210L4361999-08-0202 August 1999 Cycle 9 12-Month SG Insp Rept ML20216E3781999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20210L4451999-07-31031 July 1999 Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept ML20210G6631999-07-28028 July 1999 Cycle 9 90-Day ISI Summary Rept ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209H3831999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With ML20211F9031999-06-30030 June 1999 Cycle 9 Refueling Outage ML20196J8521999-06-28028 June 1999 Safety Evaluation Authorizing Proposed Alternative to Use Iqis for Radiography Examinations as Provided for in ASME Section III,1992 Edition with 1993 Addenda,Pursuant to 10CFR50.55a(a)(3)(i) ML20195K2951999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20206Q8951999-05-0505 May 1999 Rev 0 to L36 990415 802, COLR for Sequoyah Unit 2 Cycle 10 ML20206R5031999-04-30030 April 1999 Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With ML20205P9811999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20204C3111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20205B6631999-02-28028 February 1999 Underground Storage Tank (Ust) Permanent Closure Rept, Sequoyah Nuclear Plant Security Backup DG Ust Sys ML20203H7381999-02-18018 February 1999 Safety Evaluation of Topical Rept BAW-2328, Blended U Lead Test Assembly Design Rept. Rept Acceptable Subj to Listed Conditions ML20211A2021999-01-31031 January 1999 Non-proprietary TR WCAP-15129, Depth-Based SG Tube Repair Criteria for Axial PWSCC Dented TSP Intersections ML20198S7301998-12-31031 December 1998 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept ML20199G3641998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20197J5621998-12-0303 December 1998 Unit 1 Cycle 9 90-Day ISI Summary Rept ML20197K1161998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20195F8061998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Sequoyah Nuclear Plant.With ML20154H6091998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20154H6251998-09-17017 September 1998 Rev 0 to Sequoyah Nuclear Plant Unit 1 Cycle 10 Colr ML20153B0881998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Sequoyah Nuclear Plant.With ML20239A0631998-08-27027 August 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Sequoyah Nuclear Plant,Units 1 & 2 ML20236Y2091998-08-0707 August 1998 Safety Evaluation Accepting Relief Requests RP-03,RP-05, RP-07,RV-05 & RV-06 & Denying RV-07 & RV-08 ML20237B5221998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Snp ML20237A4411998-07-31031 July 1998 Blended Uranium Lead Test Assembly Design Rept ML20236P6441998-07-10010 July 1998 LER 98-S01-00:on 980610,failure of Safeguard Sys Occurred for Which Compensatory Measures Were Not Satisfied within Required Time Period.Caused by Inadequate Security Procedure.Licensee Revised Procedure MI-134 ML20236R0051998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Sequoyah Nuclear Plant ML20249A8981998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Sequoyah Nuclear Plant,Units 1 & 2 ML20247L5141998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Sequoyah Nuclear Plant ML20217K4471998-04-27027 April 1998 Safety Evaluation Supporting Requests for Relief 1-ISI-2 (Part 1),2-ISI-2 (Part 2),1-ISI-5,2-ISI-5,1-ISI-6,1-ISI-7, 2-ISI-7,ISPT-02,ISPT-04,ISPT-06,ISPT-07,ISPT-8,ISPT-01 & ISPT-05 ML20217E2221998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Sequoyah Nuclear Plant ML20248L2611998-02-28028 February 1998 Monthly Operating Repts for Sequoyah Nuclear Plant,Units 1 & 2 ML20199J2571998-01-31031 January 1998 Cycle 9 Voltage-Based Repair Criteria 90-Day Rept ML20202J7911998-01-31031 January 1998 Monthly Operating Repts for Jan 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199J2441998-01-29029 January 1998 Snp Unit 2 Cycle Refueling Outage Oct 1997 ML20199F8531998-01-13013 January 1998 ASME Section XI Inservice Insp Summary Rept for Snp Unit 2 Refueling Outage Cycle 8 ML20199A2931997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20198M1481997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20197J1011997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199C2951997-11-13013 November 1997 LER 97-S01-00:on 971017,vandalism of Electrical Cables Was Observed.Caused by Vandalism.Repaired Damaged Cables, Interviewed Personnel Having Potential for Being in Area at Time Damage Occurred & Walkdowns ML20199C7201997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Sequoyah Nuclear Plant L-97-215, SG Secondary Side Loose Object Safety Evaluation1997-10-23023 October 1997 SG Secondary Side Loose Object Safety Evaluation 1999-09-30
[Table view] |
Text
.- . -
En Tenressee Vapey Autionty Post Office Ek)x 2000. Soddy-D+sy Tennessee 37379 I
July 12,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen: I In the Matter of ) Docket Nos. 50-327 i
! Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SON) - JUNE 1996 MONTHLY OPERATING REPORT Enclosed is the June 1996 Monthly Operating Report as required by SON Technical Specification 6.9.1.10.
If you have any questions concerning this matter, please telephone J. W. Proffitt at (423) 843-6651.
Sincerely, u Y, R. H. Shell Manager SON Site Licensing Enclosure cc: See page 2 9607200192 960630 PDR ADOCK 05000327 R PDR
[EMl i
l r -
j U.S. Nuclear Regulatory Commission Page 2 July 12,1996 cc (Enclosure). j Mr. R. W. Hernan, Project Manager i U.S. Nuclear Regulatory Commission i One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 INPO Records Center institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. James Lang, Manager Advanced Reactor Department Electric Power Research Institute 3340 Hillview Avenue
- Palo Alto, California 94304 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 .
Atlanta, Georgia 30323-2711 l l
Mr. F. Yost, Director Research Services i Utility Data institute )
1200 G Street, NW, Suite 250 Washington, D.C. 20005
<m-*. 2 _ ....a u, - - e . a.#-.A.
9 e a
TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT MONTHLY OPERATING REPORT TO THE NUCLEAR REGULATORY COMMISSION JUNE 1996 UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79
f .
OPERATIONAL
SUMMARY
JUNE 1996 ;
UNIT I I Unit 1 generated 768,008 megawatthours (MWh) (gross) electrical power during June with a capacity factor I
. of 92.7 percent. On June 12 at 2000 Eastern daylight time (EDT), a power decrease was initiated for repairs on the 1 A main feedwater pump control system. Reactor power was decreased to 63 percent. Reactor power ;
increase was initiated at 1157 EDT on June 14, and the reactor was operating at 100 percent at 2005 EDT on l t
June 14.
On June 23 at 1714 EDT, the Unit I reactor tripped as a result of a failure of a 500-kilovolt switchyard Bus 1 !
Section I coupling capacitor potential device (CCPD). Following the investigation of the event and i verification that no other plant equipment had been damaged, the reactor was taken critical on June 24 at 1208 EDT. The failed CCPD was spared out-of-service with no affect on unit operation. Unit I was tied online on June 25 at 0307 EDT and reached 100 percent power at 2140 that day. l Unit I was operating at 100 percent reactor power at the end ofJune.
l l
UNIT 2 {
Unit 2 generated 497,598 megawatthours (MWh) (gross) electrical power during June with a capacity factor !
of 60.3 percent. The Unit 2 Cycle 7 refueling outage ended on June 9 at 1824 EDT when the generator was j synchronized to the grid. The turbine was taken offline on June 10 at 1047 EDT for turbine overspeed testing i and turbine balancing. Unit 2 was tied to the grid on June 11 at 0255 EDT. l Unit 2 was operating at 100 percent reactor power at the end ofJune. l 1
i f
I i
f l
i
+
e
t .
AVERAGE DALLY UNIT POWER LEVEL DOCKET NO. 50-327 UNIT NO. One DATE: 07-01-96 COMPLETED BY: T. J. Hollorran TELEPHONE: (423) 843-7528 MONTH. JUNE 1996 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net)
I 1122 17 1123 2 1123 18 -
1121 3 1122 19 1121 I
4 1123 20 1121 5 1121 21 1124 6 1122 22 1124 7 1122 23 795 8 1119 24 -33 9 1121 25 539 10 1120 26 1122 11 1123 27 1123 l 12 1083 28 1126 13 686 29 1125 i 14 849 30 1123 15 1122 31 NA 16 1122
AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-328 ' UNIT NO. Two DATE: 07-01-96 L COMPLETED BY: T. J. Hollomon TELEPHONE: (423) 843-7528
' MGNTH JUNE 1996 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) . DAY (MWe-Net) 1 -17 17 1112 2 -15 18 - 1112 3 -30 19 1106 4 '28
- 20 1114 5 -30 21 1124 6 -30 22 1125 l 7 _,, -3 2 23 1125 8 -30 24- 1127 9 50 25 1126 10 ,
67 26 1127 11 170 27 1124 12 299 28 1124 13 718 29 1124 14 835 30 1124 15 982 31 NA 16 1101
L .
I OPERATING DATA REPORT DOCKET NO. 5n 127 DATE 07/01/96 COMPLETED BY T. J. Hollomon TELEPHONE (423) 843-7528 OPERATING STATUS Notes
- 1. Unit Name: Seauovah Unit One
- 2. Reporting Period: In= 1006
- 3. Licensed Thermal Power (MWt): 341 to
- 4. Nameplate Rating (Gross (MWe): 1220.6
- 5. Design Electrical Rating (Net MWe): 11420
- 6. Maximum Dependable Capacity (Gross MWe): 1151.0
- 7. Maximum Dependable Capacity (Net MWe): 1111.0 ,
- 8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWe); N/A )
- 10. Reasons for Restrictions, If Any: N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720 4.367 131.496 l
- 12. Number of Hours Reactor Was Critical 701.1 4,051.3 72,946
- 13. Reactor Reserve Shutdown Hours 0 0 0
- 14. Hours Generator On-Line 686.1 3,984.7 71,211.1
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWh) 2,257,394.9 13,324,303.2 231,655,719
- 17. Gross Electrical Energy Generated (MWh) 768,008 4,592,700 78,758,045
- 18. Net Electrical Energy Generated (MWh) 739,820 4,428,652 75,512,799
- 19. Unit Service Factor 95 3 91.2 54.2
- 20. . Unit Availability Factor os 1 91.2 54.2
- 21. Unit Capacity Factor (Using MDC Net) 92 5 91.3 51.7
- 22. Unit Capacity Factor (Using DER Net) 89.5 88.3 50.0
- 23. Unit Forced Outage Rate 4.7 1.2 33.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration ofEach):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
i s
OPERATING DATA REPORT DOCKETNO. 50-328 .
DATE 07/01/96 i COMPLETED BY T. J. Hollomon TELEPHONE (423) 843-7528 OPERATING STATUS 1 Notes !
- 1. Unit Name: Seouovah Unit Two
- 2. Reporting Period: June 1996 :
- 3. Licensed Thermal Power (MWt): 34110
- 4. Nameplate Rating (Gross (MWe): 1220 6
- 5. Design Electrical Rating (Net MWe): 1148.0
- 6. Maximum Dependable Capacity (Gross MWe): 1146.0 ,
- 7. Maximum Dependable Capacity (Net MWe): 1106.0 ;
- 8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWe): N/A
- 10. Reasons for Restri:tions, If Any: N/A This Month Yr-to-Date Cumulative ,
- 11. Hours in Reporting Period 720 4,367 123.456
- 12. Number of Hours Reactor Was Critical 547.0 3,187.2 75,781
- 13. Reactor Reserve Shutdown Hours 0 0 0
- 14. Hours Generator On-Line 493.5 3,133.7 73,909.9
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWh) 1,497,931.7 10,450,303.2 234,991,900
- 17. Gross Electrical Energy Generated (MWh) 497,598 3,620,838 79,844,610
- 18. Net Electrical Energy Generated (MWh) 473,146 3,485,286 76,487,155 19.' Unit Service Factor 68.5 71.8 59.9
- 20. Unit Availability Factor 6R 5 71.8 59.9
- 21. Unit Capacity Factor (Using MDC Net) 59.4 72.2 56.0
- 22. Unit Capacity Factor (Using DER Net) 57.2 693 54.0
- 23. Unit Forced Outage Rate 0.0 0.0 31.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
e DOCKET NO.: 50-327 UNIT NAME: One '
UNIT SHUrDOWNS AND POWER REDUCTIONS DATE: 07/01/96
- COMPLETED BY: T. J. Hollomon REPORT MONTH: JUNE 19% TELEPHONE: (423) 843-7528 >
l !
I l
No. Date Type' Duration Reason
- Method of Licensee System Component Cause and Corrective Action to Prevent !
(Hours) Shutting Event Report Code
- Code' Recurrence Down No.
Reactor' 1 l
6 960612 S N/A B 5 N/A N/A N/A On June 12 at 2000 EDT a power reduction to 63 percent was initiated for repairs on the
'l A main feedwater pump control system. [
The control system problem was the result !
of the electro-hydraulic converter torque motor bearing being frozen up. The motor l
was replaced and reactor power increase ;
wr; initiated at 1157 EDT on June 14. !
7 960623 F 33.9 A 3 50-327/96006 EL XPT On June 23 at 1714 EDT the Unit I reactor 1 tripped as a result of a failure of a 500-kV switchyard Bus 1 Section 1 CCPD desice.
The cause of the failure appears to be degradation of the lower module causing stress on the other two modules, resulting in ;
the failure. The CCPD was spared out-of- .
senice with no affect on unit operation.
The reactor was taken critical again on June 24 at 1208 EDT. Unit I was tied !
online on June 25 at 0307 EDT. i e c 2
'F: Forced Reason: ' Method ' Exhibit G-Instructions I S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data ,
B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee [
C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-1022) t E-Operator Training and License Exam 5-Reduction 5
F-Administrative 9-Other Exhibit 1 - Same Source i G-Operational Error (Explain) l H-Other (Explain) ;
i i
i
DOCKET NO.: 50-328 ,
UNIT NAME: Tun *-
UNIT SHUTDOWNS AND POWER REDUCTIONS DATE: 07/o1/96 COMPLETED BY: T. J. Hollomon REPORT MONTH: JUNE 1996 TELEPHONE: (423) 843-7528 2
No. Date Type' Duration Reason Method of Licensee System Component Cause and Corrective Action to Prevent d 5 (Hours) Shutting Event Code Codc Recurrence Down Report No.
8 Reactor 1 960601 S 210.4 C 4 N/A N/A N/a The Unit 2 Cycle 7 refueling outage ended on June 9 at 1824 EDT when the generator was synchronized to the grid.
2 960610 S 16.1 B 5 N/A N/A N/A The turbine was'taken offline on June 10 at 1047 EDT for turbine overspeed testing and turbine balancing. Reactor power was maintained at approximately 25 percent. ,
Unit 2 was tied to the grid on June 11 at ,
0255 EDT.
t h
t 2
'F: Forced Reason: ' Method ' Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data ,
B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee l C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-1022)
E-Operator Training and License Exam 5-Reduction 5
F-Administrative 9-Other Exhibit I- Same Source :
G-Operational Error (Explain) ;
H-Other (Explain)
(