Tennessee Vaney AuthorPy, Post ote Box 2000, Soddy Desy, Tennessee 37379-2000 November 13, 1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington,_D.C. 20555 Gentlemen: In the Matter-of- ) Docket Nos . 50-327 Tennessee Valley Authority- )~ 50-328

                   -SEQUOYAH NUCLEAR PLANT (SQN) - OCTOBER 1997 MONTHLY orERATING REPORT Enclosed is the October 1997 Monthly Operating Report as required by_ SON Technical Specification 6.9.1.10.

If you have any questions concerning this matter, please telephone me at_(423) 843-7170 or J. D. Smith at (423) 843-6672. Sincerelyf ,

                       }              l    Y
                                     /

fI alas I Site Licensing md I: Justry Affairs Manager

Enclosure:

cc: See page~2 9711200106 971031 P PDR ADOCK 05000327.' R PDR

     .                                                                                             bh     ll
t. Pt.udeiervenedcapar =

m

                              ~ ~ "-
                 ,7 . ,

M' y. @ ' 3.y -._- i'L f LU.S.? Nuclear (Regulatiory Commission l Pagey2f

                                     -   CNovember:'13,31997 4
ccl(Enclosure): _
                                                  ' Mr. R.iW. Hernan,: Project: Manager U . S .1 Nuclsar_ RegulatoryfCommisa. ion
                                                              ~                                                                          '

_One White < Flint, North: 115551Rockville Pike: i Rockville, Maryland 20052-2739 -

                                                      --INPO: Records: Center =

Institute of Nucl_ ear'PoweriOperations 300 Galleria> Parkway-

                                                                        ~
                                                      -Atlanta,-Georgia 30339-5947 Ms.-_ Barbara Lewis,? Assistant-Editor, Database
                                                   = McGraw-Hill, _- Inc.                                      _ __

1200 G Street,-NW,-Suite 1100 Washington, D.C. 20005 Mr. -: James' Lang,- Manager Advanced-Reacter Department

                                                       -Electric! Power-hesearch Institute 3340 Hillview Avtaue PalotAlto,-California'94304-
                                                      "NRC_ Resident-Inspector                                                                .
                                                 "(Sequoyah Nuclear Plant                                                                   :i 2600 Igou Ferry' Road                                                                 (
                                                       ' Soddy-Daisy, - __ Tenne s see 37379-3624                                            .y k                                                       . Regional Administrator U.S.' Nuclear Regulatory Commission Region II
                                                       ' Atlanta Federal Center 61 Forsyth St. , SW, Suite 23T85-
- Atlanta, _ Georgia _- 30303-3415 t
. x t

m T s . , . , , .

O i TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR WANT d MONTHLY OPERATING REPORT TO THE NUCLEAR REGULAiORY COMMISSION OCTOBER 1997 UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79

O 4 . j . . . OPERATIONAL SUMMFi

                                                              .                                                             OCTOBER 1997 UNIT 1 Unit 1 generated 878,645 megawatthours (MWh) (gross) electrical power during October with a capacity factor of 102.1 percent. There were no outages or power reductions of greater than 20 percent during October.

Unit I was operating at 100 percent power at the end of the month. UNIT 2 Unit 2 generated 80,341 MWh (gross) electrical power during October with a capacity factor of 9.3 percent. Unit 2 Cycle 8 refueling outage began October 5, 1997, at 0101 Eastern Daylight Time (EDT) when the generator was removed from the grid :nd the reactor entered Mode 3. Core offload was compleiad on Occt;er 14 at 0820 EDT. On' October 19 at 2306 EDT, Unit 2 entered Mode 6, and core reload was completed on October 22 at 0537 EDT. Unit 2 was in Mode 3 at the end of the month.

SUMMARY

OF POWER-OPERATED RELIEF VALV"" (PORVs) AND SAFETY VALVES CHALLENGES No PORVs or safety valver were challenged in October. I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-327 UNIT NO. One DATE: 11-04-97 COMPLETED BY: T. J. IIollomon TELEPHONE: (423) 843-7528 MONTH: OCTOBER 1997 , AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net) 1 1135 17 1142 2~ 1136 18 1142 3 1136 19 1142 4 1133 20 1142 5 1133 21 1144 6 1133 22 1143 7 1135 23 1142 8 1137 24 1142 9 1135 25  !!44 10 1134 26 1143 11 1135 27 1142 12 1137 28 1143 13 1135 29 1143 14 1135 30 1142 15 1139 31 1142 16 1140 I 1

e.- .. r AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-328 UNIT NO. Two DATE: __ l'l-04-97 COMPLETED BY: T. J. Hollomon TELEPHONE: (423) 843-7528 MONTil:.O. CTOBER 1997 AVERAGE DAILY POWER LEVEL - AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net) 11 832 17 -1 2' '819 18 -5 3- 816 19 -5 4 741 20 -5 5 -24 21 -1

          -6                       -18                    22                      -2 7                        -1                   23                      -2 8                        -1                   24                      -7 9                        -7                   25                      -2 10                       -5                   25                      -9 11                       -7                   27                      -7
12 -2 28 -9 13 -7 29 -16 l

16 -2' 30- -21 15 --5 31 -3 ~ I 16 . .

     .                       -~,                -u   --                     ,

e -,- e e OPERATING DATA REPORT DOCKET NO. 50-327 DATE 11/04/97 COMPLETED BY T. J Hollomon TELEPHONE L4_23) 843-7528 OPERATIND STATUS

1. Unit Name: Seouovah Unit One
2. Reporting Period: October 1997
3. Licensed Thermal Power (MWt): 3411 0
4. Nameplate Rating (Gross (MWe): 1220 6
5. Design Electrical Rating (Net MWe): 114Rn
6. Maximum Dependable Capacity (Gross MWe): 1155.0
7. Maximum Dependable Capacity (Net MWe): 1117 0
8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
9. Pow er Level to Which Restricted, if Any (Net MWe): N/A
10. Reasons for Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
      ;1. Hours in Reporting Period                            745                    7,296           143,209
12. Nun'ber of Hours Besctor Was Critical 745.0 6,069.0 83,392
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 745.0 6,024.0 81,595.6
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWh) 2,538,952.7 19,900,627.0 266,255,615
17. Gross Electrical Energy Generated (MWh) 878,645 6,869,406 90,661,546
                                                                                                ~
18. Net Electrical Energy Generered (MWh) 849,385 6,635,430 87,013,068
19. Unit Service Factor 100.0 82 6 57 0
20. Unit Availability Factor ___

1000 82 6 57.0

21. Unit Capacity Factor (Using MDC Net) 102i Ci 4 54.4
22. Unit Capacity Factor (Using DER Net) 99.3 79.2 52.9
23. Unit Forced Ontage Rate 0.0 06 30.5
24. Shetdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

l

25. If Shut Down At End of Report Period, Estimated Date of Startup:

z . , - .= OPERATING DATA REPORT-- DOCKET NO. 50-328 DATE 11/04/97

                                     ~
                                                                                               +

COMPLETED BY- T. J. Hollomon

                                                                                           - TELEPHONE (423) 843-7528 -

OPERATING STATUS

1. ' Unit Name: Seanovah Unit Two
7. Reporting Period: October 1997
3. < Licensed Thermal Power (MWt): 3411 0
4. Nameplate Rating (Gross (MWe): 1220 6
5. Design Electrical Rating (Net MWe): 1148.0 6.l Maximum Dependable Capacity (Gross MWe): 1155 0
                 - 7. Maximum _ Dependable Capacity (Net MWe):                          1117.0
8;-. If Changes Occur in Capacity Radngs (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe): N/A
10. Reasons for Restrictions, if Any: N/A This Month Yr.-to-Date Cumulative
                  - 11. Hours in Reporting Period                          _

745 7,296 135,169

                  . 12. Namber of Hours Reactor Was Critical                       97.0                6,648.0           86,250
13. Reactor Reserve Shutdown Hours 0- ,

0- 0

14. Hours Generator On-Line 97.0 6,627.7 84,300.2
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generatw (MWh) 236,974.7 21,776,597.8 269,516,252 17.' Gross Electrical Energy Generated (MWh) 80,341 7,483,158 91,682,215
                   . I8.: Net Electrical Energy Generated (MWh)                71,913               7,231,214         87,910,933-
19. Unit Service Factor 13.0 90.8 62.4
20. Unit Availability Factor 11 0 90.8 6E 21 Unit Capacity Factor (Using MDC Net) 8.6 88 7 58.2
                   . 22. _ Unit Capacity Factor (Using DER Net)                      8.4                    86 3               56.7
                                                           ~
23. -Unit Forced Outage Rate 0.0 0.3 29.5
                    .24; Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

,. 25.- If Shut Down At End of Report Period, Estimated Date of Startup: November 4,1997 1

                             .... _ _ _ __     z___________.__

4 s.m

                                                                                                                                                                                                   ~;                   __

DOCKET NOr ~ 50-327 *- n., - UNITNAME:3 . . . UNIT SHUTDOWNS AND POWER REDUCTIONS - DATE: "11 AW97 '- COMPLETED BYi T.1 HnHnman REPORT MONTH: OCTOBER 1997 TELEPHONE:E '(423) 843-7528 4

i. , . . .
  • Type' 2 m  :. No.  ; Date ' '

Outage Reason Method of lxensee . System Component r===r and Conective Action to Prevent < ..

                                                                                                                                                                                                                    ^

Duration Shutthig Event Report Code * " ' Code' Recurrence

. (Hours) -Down~ No.

Reactor' , There were no v or power N of greater than 20 percent in the aver.ge daily poner level denng the amonth.

i i

4

i
           'F: Forced             ' Reason:                                   ' Method
  • Exhibit G-Instructions i S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Endy sheets for Licensee C-Refueling 3-Automatic Scram Ewnt Report (LER) File '-

D-Regulatory Restrictien . 4Mnuation of Existing Outage .(NUREG-1022) E-Operator Training and License Exam 5-Reduction F-Administrative 9 4 her Tshibit 1- Same Source . G-Operational Error (Explain) J H-Other (Explain) . - d

                                                                                                                                                                                                                       ^
       ,                                           . , .                                 ,. . . , , . - . , , . . .    .r.,                      ' .'     , , .. .. s m     _ . . ,            .,       ,. .. . ,

_~ __ . _ _ _ , _ _ _ _

      . 1                                                                                                                              l
.y .--

4 - g DOCKET NO.n 50-328 ' T ba

UNITNAME:D Tum~ -C 11AW97 '"

UNIT SHUIDOWNS AND POWER REDUCTIONS S DATE .. , COMPLETED BY; T. J. Heikt w__ . REPORTMONIlt OCTOBER 1997- TELEPHONE-l (423) 843-7528 ' ,. o 2 ~ J No. - - Date Type' Outage Reason Method of .. Lacensee ' System %e 'Cause and Correctne Arman wPment - Duration - ' . Shutting Event Code Code Recurrence ._, (Hours) -- Down. Report No.- ' Reactor' -

                    '6-      :971005'    .. S                   648.0          C               1                   N/A               N/A         .N/A:          Unit 2 Cyde h refuehng outage began October 5,1997,'at 0101 EDT when the generator was renuned front the grid and the'
 ,-                                                                                                                                                             reactor entered Made 3. . Core reload was '

4~ wM on October 22 at 0537 EDT- - Unit 2 was in Mode 3 at %e end of the - 1 month. t I

                                                                                                                                                                                                                         -{

E 2

                'F:! Forced .                   Reason:                                               ' Method                                          ' Exhibit G-Instructions' S:' Scheduled                . A-Equipment Failure (Explain)                          Manual                                           for TwAA of Data .                                             i B-Maintenance or Test                              Manual Scam                                        Entry sheets forI h
                                               '. C-Reft eling ;                                          3-Automatic Scram                                Event Report (LER) File D-Regulatory Restriction                                 4-Continuation of Existing Outage                 (NUREG-1022)

E-Operator Traimng and License Exam 5-Reduction . F-Administrative 9-Other 'Er.hibit I Sat ~ Searce i

                                                                                                                                                                                                                         'l G-Operational Error (Explain)                                                                                                                                    1 H-Other(Explain)
                               .m                   .                                                        . ,.          r ~ ...                            , ,.~:...;.-... . - . _         -      _. .    .}}