A Tennessee Valley Authority, Post Offee Box 2000, Soddy-Daisy, Tennessee 37379-2000 February 14, 1996 U.S. Nuclear Regulatory Commission ATTN Document Control Desk Washington, D.C.
20555 Gentlemen In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - JANUARY 1996 MONTHLY OPERATING REPORT Enclosed is the January 1996 Honthly Operating Report as required by SQN Technical Specification 6.9.1.10.
If you have any questions concerning this matter, please call J. W. Proffitt at (615) 843 6651.
Sincerely, koY R. H. Shell Manager SQN Site Licensing Enclosure cc: See page 2 9602220059 960131 PDR ADOCK 05000327 R
PDR 220032
.rE14 Ils
r_.
U.S. Nuclear Regulatory Commission Page 2 February 14, 1996 cc (Enclosure):
INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 i
Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 Mr. Joseph Santucci, Manager Advanced Reactor Department Electric Power Research Institute 3340 Hillview Avenue Palo Alto, California 94304 j
Mr. F. Yost, Director Rescarch Services Utility Data Institute 1200 G Street, NW, Suite 250 Washington, D.C. 20005
4 a--
m
.M
+
A.a La, aa n4 2.
n L.-
d 4
4 4
4 t
TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT MONTHLY OPERATING REPORT TO THE NUCLEAR REGUIATORY COMMISSION JANUARY 1996 UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79 1
6 i
i v
OPERATIONAL
SUMMARY
JANUARY 1996 UNIT 1 Unit 1 generated 788,152 megawatthours (MWh) (gross) electrical power during January with a capacity factor of 92.04 percent.
Unit I was offline at the beginning of January as a result of a' forced outage that began on December 25 following a failure associated with the main generator exciter. The exciter was replaced and Unit I was returned
. to service on January 2.at 1016 EST.
The turbine was taken offline at 1358 EST that day for maintenance on various problems associated with the exciter replacement. Unit 1 was tied to the grid at 2133 EST on January 2.
. On January 6 the turbine was manually tripped at 0500 EST for turbine balancing following the exciter maintenance. Unit 1 was online at 1253 EST.
Unit I was taken offline at 1445 EST for additional turbine l
balancing and returned to service at 1944 EST on January 6, 1996.
Unit 1 was operating at 100 percent reactor power at the end of January.
UNIT 2 Unit 2 generated 885,230 megawatthours (MWh) (gross) electrical power during January with a capacity factor 103.82 percent.
There were no outages or power reductions of greater than 20 percent to report during January. Unit 2 was operating at 100 percent reactor power at the end of January.
1 I
iu
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-327 UNIT No.
One DATE:
02-01-96 COMPLETED BY T.
J. Hollomon TELEPHONE:
(615) 843-7528 MONTH:
JANUARY 1996 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL QAI (MWe-Net)
QAX (MWe-Net) 1
-37 17 1147 2
8 18 1147 3
773 19 1147 4
1144 20 1147 5
1121 21 1149 6
110 22 1151 7
1026 23 1149 8
1145 24 1152 9
1148 25 1150 10 1149 26 1152 11 1146 27 1154 12 1148 28 1155 13 1149 29 1154 14 1148 30 1154 15 1144 31 1152 16 1147
AVERAGE DAILY UNIT POWER LEVEL DOCKET No.
50-328 UNIT No.
Two DATE:
02-01-96 COMPLETED BY T.
J.
Hollomon TELEPHONE:
(615) 843-7528 MONTH:
JANUARY 1996 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL R&X (MWe-Net) ph1 (MWe-Net) 1 1154 17 1155 2
1151 18 1155 3
1151 19 1155 4
1151 20 1150 5
1153 21 1158 6
1151 22 1158 7
1151 23 1158 8
1153 24 1157 9
1156 25 1157 10 1154 26 1156 11 1155 27 1159 12 1154 28 1158 13 1152 29 1161 14 1152 30 1160 15 1152 31 1161 16 1155 l
l OPERATING DATA REPORT DOCKET NO.
50-327-DATE 02/01/ %
COMPLETED BY
. J. Hollomon TELEPHONE f615) 843-7528 OPERATING STATUS l Notes l
1.
Unit Name:
Seauovah Unit One
.l l
2.
Reporting Period:
Januarv 19%
l l
3.
Licensed Thermal Power (Wt): 3411.0 l
l 4.
Nameplate Rating (Gross We): 1220.6 l
l S.
Design Electrical Rating (Not We): 1148.0 l
l 6.
Maximum Dependable Capacity (Gross We): 1151.0 l
l 7.
Maximum Dependable Capacity (Net We): 1111.0 I
l 8.
If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
E 9.
Power Level To Which Restricted, If Any (Net We):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744 744 127.873
- 12. Number of Hours Reactor Was Critical 729.6 729.6 69.624
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 689.2 689.2 67.915.6 0
0 0
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 2.290.316.2 2.290.316.2 220.621.731
- 17. Gross Electrical Energy Generated (MWH) 788.152 788.152 74.953.497 J
- 18. Net Electrical Energy Generated (MWH) 760.320 760.320 71.844.467
- 19. Unit Service Factor 92.6 92.6 53.1
- 20. Unit Availability Factor 92.6 92.6 53.1
- 21. Unit Capacity Factor (Using HDC Net) 92.0 92.0 50.6
- 22. Unit Capacity Factor (Using DER Net) 89.0 89.0 48.9
- 23. Unit Forced Outage Rate 2. 0 _,
2.0 34.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Dr.te, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
)
OPERATING DATA REPORT DOCKET NO.
50-328 DATE 02/01/96 COMPLETED BY T. J. Holl omon TELEPHONE (615) 843-7528 OPERATING STATUS l Notes l
1.
Unit Name:
Seauovah Unit Two l
l 2.
Reporting Period: Januarv 1996 l
l
~
3.
Licensed Thermal Power (MWt): 3411.0 l
l 4.
Nameplate Rating (Gross MWe):.1220.6 l
j 5.
Design Electrical Rating (Net MWe): 1148.0 l
l 6.
Maximum Dependable Capacity (Gross MWe): 1146.0 l
l 7.
Maximum Dependable Capacity (Net MWe): 1106.0 l
l 8.
If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Y r-to-Date Cumulative
- 11. Hours in Reporting Period 744 744 119.833
- 12. Number of Hours Reactor Was Critical 744.0 744.0 73.338
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 744.0 744.0 71.520.2
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2.535.347.7 2.535.347.7 227.076.944
- 17. Gross Electrical Energy Generated (MWH) 885.230 885.230 77.109.002
- 18. Net Electrical Energy Generated (MWH) 856.334 856.334 73.858.203
- 19. Unit Service Factor 100.0 100.0 59.7
- 20. Unit Availability Factor 100.0 100.0 59.7
- 21. Unit Capacity Factor (Using MOC Net) 104.1 104.1 55.7
- 22. Unit Capacity Factor (Using DER Net) 100.3 100.3 53.7
- 23. Unit Forced Outage Rate 0.0 0.0 32.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
U2C7 refuelina outnae is scheduled to beain on April 19. 1996. with a duration of 55 davs.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
DOCKET NO:
50-327 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT MAME:
One DATE:
02/01/ %
REPORT MONTH: JANUARY 1996 COMPLETED E. J, Hn11ergn :
TELE
- HONE:1615) 643-752s Method of Cause and Corrective l Durstion l Licensee Shutting Down, Event Systy Component Action to 5
l 2
3 No.
Date Type (Hours)
Reason Reactor ikeport No.
Code Code Prevent Recurrence 1
960101 F
34.27 A
2 50-327/95019 TL EXC Unii 1 continued in an outage that began on December 25, 1995. A manual reactor trip was initiated because of problems associated with the main generator excitation system. The exciter was replaced.
2 960102 F
7.58 8
9 N/A h.'
N/A After returning the unit to service on January 2, the turbine was taken offline for maintenance on various problems associated with the exciter replacement activity. The problems were corrected, and the unit was tied to the grid at i
2133 EST that day.
3 960106 F
7.97 8
9 N/A N/A N/A On January 6 at 0500 EST. the turbine was manua?ly tripped for turbine balancing. The turbine was tied online at 1258 EST that day.
4
% 0106 F
4.98 8
9 N/A N/A N/A On January 6 at 1445 EST, the turbine was manually tripped for additional turbine balancing. The turbine was tied online at 1944 EST that day.
2 3
I: Forced Reason:
Mothod:
Exhibit G-Instructions F
5: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-1022)
E-Operator Training and Licente Examination 5-Reduction F-Admini strative 9-Other 5
G-Operational Error (Explain)
Exhibit I-Same Source H-Other (Explain)
...~. -.
t l.
i DOCKET NO:
'50-328 i-UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N W :
Two D414 02/01/96
=
REPORT PONTH: JAfRRRY 1996 C019LETED 5
. J. Hollomon TELEPHONE:. 315) 843-7528 Method of Licensee Cause and Corrective Action to Systy Cyt Duration Shutting Down Event No.
Date Type (Hours)
Reason Reacto Report No.
Code Code Prevent Recurrence There were rio outages or power l-reductions of greater than l.
20 percent to report during January.
l l
I 2
3 4
I: Forced Eeason:
Method:
Exhibit G-Instructions F
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 8-Maintenance or Test 2-Manual Scram Entry sheett for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation f Existing Outage (NUREG-1022)
E-Operator Training and License Examination 5-Reduction F-Admini s trative 9-Other 5
G-Operational Error (Explain)
Exhibit I-Same Source H-Other (Explain) 4 h