Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20212J6311 October 1999SER Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plant,Unit 1Incorporated by reference
ML20217G37230 September 1999Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With
ML20212F08323 September 1999Safety Evaluation Granting Relief from Certain Weld Insp at Sequoyah Nuclear Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year ISI IntervalSafe Shutdown
VT-2
Incorporated by reference
ML20212F47623 September 1999Safety Evaluation Supporting Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively
ML20212C47631 August 1999Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With
ML20210L4362 August 1999Cycle 9 12-Month SG Insp Rept
ML20216E37831 July 1999Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20210L44531 July 1999Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept
ML20210G66328 July 1999Cycle 9 90-Day ISI Summary Rept
ML20196H86230 June 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 ReptHigh Radiation Area
Power change
ML20209H38330 June 1999Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With
ML20211F90330 June 1999Cycle 9 Refueling Outage
ML20196J85228 June 1999Safety Evaluation Authorizing Proposed Alternative to Use Iqis for Radiography Examinations as Provided for in ASME Section III,1992 Edition with 1993 Addenda,Pursuant to 10CFR50.55a(a)(3)(i)Non-Destructive Examination
Incorporated by reference
ML20195K29531 May 1999Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20206Q8955 May 1999Rev 0 to L36 990415 802, COLR for Sequoyah Unit 2 Cycle 10
ML20206R50330 April 1999Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With
ML20205P98131 March 1999Monthly Operating Repts for Mar 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20204C31128 February 1999Monthly Operating Repts for Feb 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20205B66328 February 1999Underground Storage Tank (Ust) Permanent Closure Rept, Sequoyah Nuclear Plant Security Backup DG Ust Sys
ML20203H73818 February 1999Safety Evaluation of Topical Rept BAW-2328, Blended U Lead Test Assembly Design Rept. Rept Acceptable Subj to Listed ConditionsShutdown Margin
ML20211A20231 January 1999Non-proprietary TR WCAP-15129, Depth-Based SG Tube Repair Criteria for Axial PWSCC Dented TSP IntersectionsWeak link
ML20198S73031 December 1998Cycle 10 Voltage-Based Repair Criteria 90-Day Rept
ML20199G36431 December 1998Monthly Operating Repts for Dec 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20197J5623 December 1998Unit 1 Cycle 9 90-Day ISI Summary ReptPacking leak
Hydrostatic
ML20197K11630 November 1998Monthly Operating Repts for Nov 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20195F80631 October 1998Monthly Operating Repts for Oct 1998 for Sequoyah Nuclear Plant.With
ML20154H60930 September 1998Monthly Operating Repts for Sept 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20154H62517 September 1998Rev 0 to Sequoyah Nuclear Plant Unit 1 Cycle 10 Colr
ML20153B08831 August 1998Monthly Operating Repts for Aug 1998 for Sequoyah Nuclear Plant.With
ML20239A06327 August 1998SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Sequoyah Nuclear Plant,Units 1 & 2Backfit
ML20236Y2097 August 1998Safety Evaluation Accepting Relief Requests RP-03,RP-05, RP-07,RV-05 & RV-06 & Denying RV-07 & RV-08Boric Acid
Stroke time
Hydrostatic
Incorporated by reference
Power-Operated Valves
Scaffolding
ML20237B52231 July 1998Monthly Operating Repts for July 1998 for Snp
ML20237A44131 July 1998Blended Uranium Lead Test Assembly Design ReptSafe Shutdown
Shutdown Margin
Fuel cladding
Power change
ML20236P64410 July 1998LER 98-S01-00:on 980610,failure of Safeguard Sys Occurred for Which Compensatory Measures Were Not Satisfied within Required Time Period.Caused by Inadequate Security Procedure.Licensee Revised Procedure MI-134
ML20236R00530 June 1998Monthly Operating Repts for June 1998 for Sequoyah Nuclear Plant
ML20249A89831 May 1998Monthly Operating Repts for May 1998 for Sequoyah Nuclear Plant,Units 1 & 2
ML20247L51430 April 1998Monthly Operating Repts for Apr 1998 for Sequoyah Nuclear Plant
ML20217K44727 April 1998Safety Evaluation Supporting Requests for Relief 1-ISI-2 (Part 1),2-ISI-2 (Part 2),1-ISI-5,2-ISI-5,1-ISI-6,1-ISI-7, 2-ISI-7,ISPT-02,ISPT-04,ISPT-06,ISPT-07,ISPT-8,ISPT-01 & ISPT-05Incorporated by reference
ML20217E22231 March 1998Monthly Operating Repts for Mar 1998 for Sequoyah Nuclear Plant
ML20248L26128 February 1998Monthly Operating Repts for Sequoyah Nuclear Plant,Units 1 & 2
ML20199J25731 January 1998Cycle 9 Voltage-Based Repair Criteria 90-Day Rept
ML20202J79131 January 1998Monthly Operating Repts for Jan 1997 for Sequoyah Nuclear Plant,Units 1 & 2
ML20199J24429 January 1998Snp Unit 2 Cycle Refueling Outage Oct 1997
ML20199F85313 January 1998ASME Section XI Inservice Insp Summary Rept for Snp Unit 2 Refueling Outage Cycle 8
ML20199A29331 December 1997Revised Monthly Operating Rept for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2
ML20198M14831 December 1997Monthly Operating Repts for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2
ML20197J10130 November 1997Monthly Operating Repts for Nov 1997 for Sequoyah Nuclear Plant,Units 1 & 2
ML20199C29513 November 1997LER 97-S01-00:on 971017,vandalism of Electrical Cables Was Observed.Caused by Vandalism.Repaired Damaged Cables, Interviewed Personnel Having Potential for Being in Area at Time Damage Occurred & Walkdowns
ML20199C72031 October 1997Monthly Operating Repts for Oct 1997 for Sequoyah Nuclear Plant
L-97-215, SG Secondary Side Loose Object Safety Evaluation23 October 1997SG Secondary Side Loose Object Safety Evaluation