I C.

Tennessee Valley Authority, Post OffK:e Box 2000, Soddy-Daisy, Tennessee 37379-2000 I

June 10,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 l

Gentlemen:

In the Matter of ) Docket Nos. 50-327 l Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - MAY 1997 MONTHLY OPERATING l REPORT l I

Enclosed is the May 1997 Monthly Operating Report as required by SQN Technical Specification 6.9.1.10.

If you have any questions concerning this matter, please telephone J. W. Proflitt at (423) 843-6651.

Sincerely, h,N- y R. H. Shell .y .

Site Licensing and Industry Affairs Manager C

\

Enclosure  !

I cc: See page 2 hR $DO $7 lllllllllW!Illi,Illl!lill!Wil!IWilll

_ _ _. _ __ _ _ _ . . __- . . . ~ . . . _ . _ _ . . _ _ _ . __

l U.S. N icicar Regulatory Commission  :

Page 2 June 10,1997 l

i L

i l

  • l cc (Enclosure):

Mr. R. W. Hernan, Project Manager ,

U.S. Nuclear Regulatory Commission i L One White Flint, North -

11555 Rockville Pike  !

l Rockville, Maryland 20852-2739 L , .

INPO Records Center .

Institute of Nuclear Power Operations  !

700 Galleria Parkway.

Atlanta, Georgia 30339-5947 l Ms. Barbara Lewis, Assistant Editor, Database y McGraw-Hill, Inc. ,

1200 G Street, NW, Suite 1100 l' Washington, D.C. 20005 Mr. James Lang, Manager Advanced Reactor Department l Electric Power Research Institute l l 3340 Hillview Avenue  !

L . Palo Alto, California 94304 i

NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 l

j. Regional Administrator .

U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsythe St., SW, Suite 23T85 Atlanta, Georgia 30323-3415 i

I

.s . - + _ . . . . _ . . - 1.=* a a .-.s_nna r aa. u a n. ....aL.wr.ax.wu..na s. a.a a m 1 nm. s..s a m sua.. a s 2. o. n r ,- an..>.., axwa. .r..w .w a . , n r . .. na s._,aas..

O e

a 4

TENNESSEE VALLEY AUTHORITY l

SEQUOYAH NUCLEAR PLANT l

l

, MONTHLY OPERATING REPORT l

TO THE NUCLEAR REGULATORY COMMISSION MAY 1997 UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79 l

.--,..y

1 OPERATIONAL

SUMMARY

MAY 1997 UNIT 1 Unit I generated 465,270 megawatt-hours (MWh) gross electrical power during May with a capacity factor of

. 54.1 percent. Unit 1 Cycle 8 refueling outage was completed on May 12,1997 at 1510 EDT when the generator was synchronized to the grid. Unit I reactor power reached 30 percent at 2249 EDT on May 12. ,

The generator was taken off-line at 0551 EDT on May 13 for a planned main turbine over-speed test and was i returned to service at 0717 EDT on May 13. Unit I reached 100 percent reactor thermal power on May 19 at I 1230 EDT and continued to operate at 100 percent throughout the end of May. I i

i UNIT 2 Unit 2 generated 874,067 MWh gross electrical power during May with a capacity factor of 101.7 percent.

i There were no outages or power reductions of greater than 20 percent to report during May. i 1

SUMMARY

OF POWER-OPERATED RELIEF VALVES (PORVs) AND SAFETY VALVES CHALLENGES l

No PORVs or safety valves were challenged in May,  !

l a

v

,m- ,. . , - -

4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-327 UNIT NO. One DATE: 06-05-97 COMPLETED BY: T. J. Hollomon TELEPHONE: (423) 843-7528 MONTH: MAY 1997 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net) 1 -5 17 872 2 -1 18 1004 3 -12 19 1121 4 -12 20 1137 5 -25 21 1139 6 -21 22 1139 7 -21 23 1141 8 -19 24 1142 9 -22 25 1143 10 -22 26 1144 11 -22 27 1142 12 45 28 1142 13 206 29 1142 14 303 30 1143 15 630 31 1144 16 793

l AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NO. 50-328 UNIT NO. Two DATE: 06-05-97  :

COMPLETED BY: T. J. Hollomon I TELEPHONE: (423) 843-7528 l

MONTH: MAY 1997 l

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net)

I 1 1141 17 1138 2 1142 18 1135 l 3 1139 19 1138 4 1139 20 1141 5 1136 21 1139 6 1138 22 1138 7 1139 23 1138 i 8 1138 24 1139 9 1136 25 1139 10 1135 26 1141 11 1135 27 1139 12 1135 28 1139 ,

13 1137 29 1137  !

14 1137 30 1134 15 1136 31 1139 i

16 1136

_ . . _ _ _ . _ _ _ . . ~ . _ _ . _ _ . . _ . - . _ . _ . _ _ . _ _ . - _ _ _ _ _ _ . . _ . .

6 e

. t OPERATING DATA REPORT  !

DOCKET NO. so 177  ;

DATE 06/05/97 i COMPLETED BY T. J. Hollomon  ;

~

TELEPHONE (423) 843-7528 ,

l OPERATING STATUS  !

f

1. Unit Name: Sequoyah Unit One

. 2. Reporting Period: May 1997 l 3. Licensed Thermal Power (MWt): 3411.0 ,

4. Nameplate Rating (Gross (MWe): 1220.6  ;

l 5. Design Electrical Rating (Net MWe): 1148.0 j

6. Maximum Dependable Capacity (Gross MWe): 1155.0 i
7. Maximum Dependable Capacity (Net MWe): 1117.0
8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons: l
9. Power Level to Which Restricted, If Any (Net MWe): N/A (
10. Reasons for Restrictions, If Any: N/A  !

This Month Yr-to-Date Cumulative  !

11. Hours in Reporting Period 744 3.623 139.536 )
12. Number of Hours Reactor Was Critical 500.4 2.421.3 79.744  !
13. Reactor Reserve Shutdown Hours 0 0 -0
14. - Hours Generator On-Line 463.4 2,384.3 77,955.9
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWh) 1,335,571.3 7,577,920.9 253,932,908
17. Gross Electrical Energy Generated (MWh) 465,270 2,643,273 86,435,413
18. Net Electrical Energy Generated (MWh) 444,998 2,545,413 82,923,051
19. Unit Service Factor 62.3 65.8 55.9
20. Unit Availability Factor 62.3 65.8 55.9
21. ' Unit Capacity Factor (Using MDC Net) 53 5 62.9 . 53.2
22. Unit Capacity Factor (U' sing DER Net) s? 1 61.2 51.8 23; Unit Forced Outage Rate 0.0 0.0 31.4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End ofReport Period, Estimated Date of Startup:

l l

I

. - .. - -~~ - - --. .. . ...~ - . - - - - - - - - . . . - . . - - . - . ~ . - . __

1

j ,

[

l ,

OPERATING DATA REPORT  ;

I DOCKET NO. 50-328 l

! DATE 06/05/97 'i COMPLETED BY T. J. Hollomon TELEPHONE (423) 843-7528 OPERATIN_QSTATUS  ;

1. Unit Name: Seauovah Unit Two -
2. Reporting Period: May 1997
3. Licensed Thermal Power (MWt)
3411.0 {
4. Nameplate Rating (Gross (MWe): 1220.6

- 5. Design Electrical Rating (Net MWe): 1148.0

6. Maximum Dependable Capacity (Gross MWe): 1155.0  ;

.7. Maximum Dependable Capacity (Net MWe): 1117.0 -

8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:

l- 9. Power Level to Which Restricted, If Any (Net MWe): N/A ,

10. Reasons for Restrictions, If Any: N/A i l

This Month Yr-to-Date Cumulative  ;

l

11. Hours in Reporting Period 744 3,623 131,496 1
12. Number of Hours Reactor Was Critical 744.0- 3,623.0 _ 83,225 I
13. Reactor Reserve Shutdown Hours 0 0 0 14.- Hours Generator On-Line 744.0 3,623.0 81,295.5
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWh) 2,535,276.0 12,304,307.9 260,043,962
17. Gross Electrical Energy Generated (MWh) 874,067 4,256,867 88,455,924

-18. Net Electrical Energy Genuated (MWh) 845,283 4,117,511 84,797,230  ;

I- ~ 19. Unit Service Factor 100.0 100.0 61.8  !

20. Unit Availability Factor 1000 100.0 61.8 l l '

l 21. Unit Capacity Factor (Using MDC Net) 101.7 101.7 57.7

22. Unit Capacity Factor (Using DER Net) 99.0 99.0 56.2 L 23. Unit Forced Outage Rate 0.0 0.0 30.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Unit 2 Cycle 8 Refueling j Outage is scheduled to begin in October 3.1997 with a duration of 50 days.
25. If Shut Down At End ofReport Period, Estimated Date of Startup
N/A Y

,c . . - - . -

DOCKET NO. 50-327 -

UNIT NAME: One

  • UNIT SHUTDOWNS AND POWER REDUCTIONS DATE: 0005/97 COMPIEED BY: T. J. Hollomon
  • i REPORTMONTH: MAY 1997 TELEPHONE: (423) 843-7528 2

No. Date Type' Outage Reason Method of Licensee System Component Cause and Correctist Action to Prevent t Duration Shutting Event Report Code' Code' Raus.ua '

(Hours) Down No.

5 Reactor 1 970501 S 279.2 C 4 N/A N/A N/A Unit 1 Cycle 8 refueling outage ended on j May 12 at 1510 EDT when the generator was synchronized to the grid. . Reactor =

power was increased to 30 percent power.

t 2 970513 S 1.4 B 9 N/A N/A N/A With reactor power remaining at 30 percent, the unit was removed from the grid at 0551 EDT on May 13 for main turbine r over-speed testing. The unit was returned to service at 0717 EDTon May 13. ,

i '

, I l

L i

2 $

'F: Forced Reason: Method ' Exhibit G-Instructions [

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data  !

B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee ,

i C-Refueling 3-Automatic Scram Esent Report (LER) File [

D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-1022) - ['

E-Operator Training and License Exam 5-Reduction 5

F-Administrative 9-Other Exlutit I- Same Source [

G-Operational Error (Explain) ,

H-Other (Explain) l l

,,w-- -m-- - , - - am , a-v -m-,- ----e.+,--.---,-. ,-,m , e- - , - .-w - -,-,--r-- ,- -

  • ~

DOCKET NO.: 50-328 l _

UNIT NAME: Two -

UNIT SHUTDOWNS AND POWER REDUCTIONS DATE: 06/05M7

  • COMPLETED BY:_T. J. Hollomon REPORT MONTIL MAY 1997 TELEPHONE: (423) 843-7528 2

No. Date Type' Outage Reason Method of Licensee System Component Cause and Corrective Action to Prevent Duration - Shutting Event Code' Code' Recurrence (Hours) . Down Report No.  ;

Reactor' There were no outages or power reductions of greater than 20 percent to report during May.

':o i

i t

2

'F: Forced Reason: ' Method ' Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data .

B-Maintenance orTest 2-Manual Scram Entry sheets for Licensee l C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-1022)

E-Operator Training and License Exam 5-Reduction F-Administrative 9-Other blutit I- Same Source G-Operational Error (Explain)

H-Other (Explain) i