ML20090C449

From kanterella
Revision as of 06:32, 13 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
AO-75-031:on 751114,both Radiation Monitors in Reactor Bldg Ventilation Duct Failed to Provide Transfer to Emergency Ventilation Sys at 5 M/H.Caused by Incorrect Adjustment Made Prior to Calibr
ML20090C449
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/26/1975
From: Schneider R
NIAGARA MOHAWK POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20090C453 List:
References
13538, 13949, AO-75-031, AO-75-31, NUDOCS 8302180076
Download: ML20090C449 (3)


Text

, _

~~ - - .

(~3_

t

-V' . Q. i l

NIAGARA MOHAWK POWER CCRPORATION I

NIAGARA MOHAWK i-I' DATE: November 26, 1975 c

SUBJECT:

Abnormal Occurrence Report No. 50 220 75 31 (10 Day Letter) ..

I -

I ~'

The enclosed Abnormal Occurrence Report is being submitted in i

accordance with Technical Specificat.on .Section 6. -

~

l ,

+ / .

TO: James P. O'Reilly _

Directorate of Regulatory Operations .

Region 1 /

631 Park Avenue ,

King of Prussia, Pa. 19406 FROM: Niagara Mohawk Power Corporation '

Nine Mile Point - James A. FitzPatrick Site -

P.O. Box #32 Lycoming, New York 13093 Docket No. 50- 220 .

/

REFERENCE:

License DPR- 63

~

Report No.: 50- 220/75- 31 Report Date: 11/26/75 Occurrence Date: 11/14/75 Facility: NY NMP #1 Identification of Occurrence:

Failure of both radiation monitors located in the Reactor Building l-

! Ventilation Duct to provide a transfer to Emergency Ventilation System l at 5 mr/hr. . ,

I l

i l

8302100076 751126 ,

PDR ADOCK 05000220 l S PDR

, l 1 - - .

e j

AOR 75-31 N '

/3 Conditions Pricr to D

e' v

Occurrence: Steady State Power ' Routine Shutdown l- ,

s ,

Hot Standby-Cold Shutdown. Load Changes

- X -Refueling Shutdown Routine Startup ' Other i

- Description of the Occurrence:

e Durin'g routine radiation protection surveillance testing, both l

radiation monitors in the Reactor Building Ventilation Duct fail'ed to provide

'^

l - transfer to kmergency Ventilation System until 20 mr/hr and 30 mr/hr resfectively-was applied to the sensors. The cicetronic calibration had just previously been performed. -

j. 5 Apparent Cause o'f the Occurrence:

Design X Procedure l

l Manufacture Unu,sual Service Condition Installation / -

' Const.

X Operator Component Failure Other (Specify) ,

e ' ,

,  ;^

l Analysis of Occurrence:

During refueling operation, the radiation monitor' located on the refueling platform will also cause a tran.fer to Emergsney Ventilation. The plant has been in refueling since September 11, 1975. Thus protection for the public was adequately supplied by this monitor in the event of a dropped fuel assembly.

P orrective Action:

i , The investigation revealed that an inadvertant adjustment was made to these instruments prior to their calibration. Better coordination be-tween the verification of trip point and the electronic alignment will be implemented, and should prevent this in the future. Additional administra-

=, tive controls,wil.1 be imposed for this type of calibration.

,i I

^

Failure Data: '

,h I ,

I /

< None // ,-

,A f y . 't j  ?- i. i I ..a /

L '

1

(' en

    • ~=,.-#. ,, _ ,

pv -

n C,

n -

rg N

* ' ~.

G,, '3 NIAGARA' MOHAWK POWER CORPORATION rj iN
s. I .

v , , . NIAGARA MOHAWK ,

- a, soo Epitl.soutEvARD ' WEST ,

2'

.(

syn $cOSE N Y,132o2 a

Novanbet 28, 1975 n.

m" , g

<T.%

bit. James P. O'Reitig Directorate of Regulatory,0perations 8 *

'9

. /

Region I /S. f t United States Nuctcar Regulato.tt) Connission i (f f p.fj 631 Park Avenue King of Prussia, Pa. 19406

-. % p -

OEC3 l97$ g Q ,- '

u.s.

RE: Docket No. 50-220 _

s ~' //

Dear blt. O'Reitty:

l  % _

9 Enclosed ptcase find Abnormat OccurtencE Rep &tts 75-31 and 75-32 for Nine Ilite Poin.t Nuclear Plant Unit., #1. The.se reports:are submi.ited

., in accordance with Regulatory Guide 1.16 and constitute fhtfittment of the fifteen (15) day lettet requirements. The Licensee Event Reports forms Q be submitted by the 10th of December,1975. ,

Very truly yours,

.h -

ML f'

" R.R.-Schneid w -

Vice President ' ';  ;

Electric Operations

i ,

N 7

.'N g

TJD/nn j ,

Enc. >

f

., l .'~~~ ,

- r ,

'. is 4

o s t i _ 13538

. e<