ML20090C433

From kanterella
Jump to navigation Jump to search
AO-75-09:on 751123-29,licensee Failed to Analyze Stack Cartridges Weekly.Technician Reinstructed
ML20090C433
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/29/1975
From: Schneider R
NIAGARA MOHAWK POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
AO-75-09, AO-75-9, NUDOCS 8302180060
Download: ML20090C433 (3)


Text

g -. -- - .

O O NIAGARA MOHAWK POWER CORPORATION NIAGARA MOHA V/K DATE: llecember 29. 1975

SUBJECT:

Abnormal Occurrence Report No. 50- 220 75 (10 Day Letter)

The enclosed Abnormal Occurrence Report is being' submitted in accordance with Technical Specification Section 6.

TO: -James P. O'Reilly Directorate of Regulatory Operations l Region 1 631 Park Avenue King of Prussia, Pa. 19406 FR0id: Niagara Mohawk Power Corporation Nine Mile Point - James A. FitzPatrick Site P.O. Box #32 Lycoming, New York 13093 Docket No. 50- 220

REFERENCE:

License DPR- 63 Report No.: 50 220 /75- 39 Report Date: 12/29/75 Occurrence Date: 11/23/75 - 11/29/75 Facility: NY NMP #1 Identification of Occurrence:

Failure to analyze stack cartridge weekly which is required by Environmental Technical Specification 2.4.4.1 P,.

l i

! 8302180060 751229 PDR ADOCK 05000220 l S PDR

-n 3 s ,

(_/ \_/

NIAG ARA MOHAWK POWER CORPORATION -

NIAGARA MOHAWK Conditions Prior to Occurrence: Steady State Power _ Routino Shutdown llot Standby Cold Shutdown Load Changes X Refueling Shutdown Routine Startup _

Other Description of the Occurrence:

During a routine review of the stack release of iodines and particulates with half lives greater than 8 days, it was discovered that there was no stacl:

sample change and analysis during the week of 11/23/75 - 11/29/75 as required by Environmental Technical Specifications 2.4.4. IB.

Apparent Cause of the Occurrence:

Design Proceduro Manufacture Unusual Service Condition Installation /

Const.

X Operator Component Failure other (Specify)

Analysis of Occurrence:

Sample analysis prior to and after this week were on 11/21/75 and 12/1/75 respectively. Release rates of iodines and particulates with half-lives greater than 8 days were 3.87 x 10-3 uc/sce and 7.49 x 10-3 ue/sec for the 11/21/75 and 12/1/75 samples respectively ( vlt of release limit) .

Corrective Action:

Technical Specificat ion and procedure requirements have been reviewed with the t echnic'.an responsible for the sample analysis, to ensure adaccence to Technical Specification requirements.

failure Data:

T

-i 4

9 NIAGARA MCHAWK POWER CORPORATION NIAGARA b mot 1AWK 300 Erie Boulevard, (Cest Sytacuse, !!cw York 13202 Decer1 ben 29,1975

/ IS. ,

Ilt. Janc.s P. C'Reilly \ U/ .

k Directorate of Regata.cory Operations Region 1 L

1 1 ll.

f \

hk 9vl h1 lhtited States Nuclear Regulatoin Coutission

~

E .

~

0 1 631 Pa.tk Avenue -

( JEM. c g*# '

King of Pnussia, Pa. 19406 w e.s.fc khc RE: vachet No. 50-220 Deat ist. C'Reilly:

co ,

(*

^~~'

in accordance leith Nine l file Point Nuctcar Station lhtit di Environmentat Technical Specifications Sec2 ion 5.6, tc1 hereby sutwit

,the folletcing Abnotmat Occurrence Repott, 75-39.

SinccAciy yours, n , ,

/.'l/:

t '/ ' -:j?c..

{t s c g n{l.v,-

R.R. ScimcidcA t! ice President Electtic Opera ttions TJP/ mat t nc. 3 copies

~

cc: Mt. K.R. Golfer (30 copics) 11