AO 50-220/75-05:on 750401,during Routine Surveillance Testing,Emergency Vent Sys Failed to Function When Sys Inlet Ventilation Valve Bv 202-36 Failed to Open.Caused by Broken Stem in Solenoid Valve.Solenoids Will Be Replaced
ML20090E041
Person / Time
Site: Nine Mile Point 
Issue date: 04/02/1975
From:
NIAGARA MOHAWK POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20090E038 List:
References
AO-50-220-75-5, NUDOCS 8303110442
Download: ML20090E041 (2)


Text

-

/

N6 AGAMA MOHAWK POWER CORPORATION NIAGAn4 MOHWWE a

DATEt-April 2. M75

SUBJECT:

Abnormal Occurrence Report No. 50-220 75-5 (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Kotification) 1he enclosed preliminary AOR is being submitted in accordance with Technical specification Section 6 Cbnfirming C. Stuart phone conversatica with AEC RO:I office on April 1,1975 102 James P O'Rei!2y Directorate of Regulatory Operations Rsgion 1 s-631 Park Avenue King of' Prussia, Pa.

19406 Pit 3f:

Niagste Fbhawk Power Corporation Nine Nils Point - James A. FitzPatrick Site P.O. Box #32 f,ycoming,, New York 13095 Docket No. 50 _ 220 REFERENCEL License DPR-63 Report No,t 50- m /75-S Report Date 4-2-75 Occurrence Date 4-I-75 Pacility:

NY te!P-I g

Identification of Occurrance:

Failure er the Emergency Venti 2ation Systems to ibnctierr as designed genen initiated during routine-surveillmace testing.

t 8303110442 750414 gDRADOCK 05000220 PDR

4 o

PAGE 2 Conditions Prior to Occurrence:

94.51L Steady State Power Routine Shutdown Rat Stundby Cold Shutdown Rad Changes

~ Refueling Shutdbwa Routina Startup other-Description of the Occurrer.ce:.

He Dnergency Ventilation System is a standby system designed to operate to mitigate the consequences of high radiation levels in the normal ventilation system. During routine operater surveillance (Tech Spec;. 4.4.4 aner Tables. 3.6r.2J f 4.6.2j). H e system inlet ventilation valve (B.V 202-36} f&iled to open.. due to a broken stem in one RPS solenoid valve and metal filings-in the other

(% Iogic).

Aphrarent Cause of the occurrence:

Design Procedure Manufacture Unusual Service Condities Installatica/

Coast.

Operator I

Camrponent Failure Analysis of Occurrence:

he system was inmediately restored to service and thus would have performed its intended function. Even without system operation under the worst condition,. the site boundary doses-would have been less than required by 10' CFR.100*.

Herefore, no hazard was to the general public.

He RPS solenoids will be replaced. presented Corrective Actions.

he blocking valve-202-35 was immediately cp.-d (=====11y) thus satisfying the requirements of Tech Spec 3.4~.4.

has been-ordered; by SORC te evaluate operaties-withAn Engineering Review of the system 202-36 normally open and. the related RPS ihneticos.

\\

Failure Pata:

i

g...y.

ASCO Yhlve SN'831639-a.

  • FE&R Supplement t VI.It' l

EmW J