AO 50-220/74-2:on 740323,during Routine Concentrator Steam Operation,Pipe Crack Found in Waste Concentrator Piping Leading from Side Arm Heater.Caused by Improper Installation.Pipe Section Will Be Replaced
ML20090E205
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/25/1974
From: Perkins T
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML20090E199 List:
References
AO-50-220-74-2, NUDOCS 8303140121
Download: ML20090E205 (1)


Text

, ._ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _

. - ?n0:!: T.J. PEREINS t E !!ILE l'0 INT NU"LPAR STATION

  • ' Ab?,0PJ'.\L OCCUTsRE5:CE 5 20-74-2 O

PERSU/JIT M TECllNICAL $1'ECIFICATION 1.13d WE ARE REPORTING AS AN ABN0FPAL OCCURhENCE CPJscr.ING IN HIE WASTE CONCENTRATOR PIPING FROM TliE SIDE APJ!

IIEATER.

ON }!ARCl{ 23, 1974 DURING R0trTINE OPEPATION OF Tile CONCENTRATOR A SLlGif PUFF OF STEA!! KAS SE$N W BE E)(1TTED PRO:: A SECTION OP 12" PIPE ' LEADING FRO't SIDE AISt llEATER T0 t!E t0110M OF UIE CONCENTRATVR, FOLLOWING SIPJTD0hH OF 1{E CONCENTPATOR /J;D REMOVAL OF ttE INSU!ATION SURROUNDING bib PIPE, SEVERAL CRACKS WERE REVEALED IN (/J"D NtAR ONE WELD. .

ele CAUSE OF Ti!E FAILURE IS CURRENTLY UNDER INVESTIGATION AND WOULD OF l COURSE DICTATE WE CORRECTIVE ACTION. NO !!AZARD WAS PRESEl7ED TO Tile GENERAL PUBLIC AS A REf'lLT OF Ulls FAILURE.,

T,J. PERKINS STATION SUPERINTENDENT NINE HILE POINT NUCLPAR STATION e

S

.