ML20092J538

From kanterella
Revision as of 14:40, 4 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards McGuire Unit 1,Cycle 8 Core Operating Limits Rept
ML20092J538
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 02/06/1992
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092J539 List:
References
NUDOCS 9202240314
Download: ML20092J538 (2)


Text

O ' '

lu," Isar reani,,,ra lju tt h im l'O /M I"of b ror t o , /w ue nt Utwa~m \< Niltw' w l, a, t TNI1ll lill

{f DUKEPOWER rebruary 6, 1992 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Subjects McGuire Nuclear Station, Unit 1 Docket Number 50-369 Core Operating Limits Report for Cyclo 8 Please find attached, pursuant to McGuiro Technical Specification 6.9.1.9,- the Core Operating Limits Report for McGuiro Unit 1 Cycle 8.

If there are any questions, please call Scott Gowohr at (704) 373-7bal.

",ery truly yours, - ,

p* [ * /,

/

H. B. Tucker cc Mr. T. A. Reed, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 9H3, OWFN Washington, D. C. 20555 Mr. S. D. Ebneter, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta Street, NW - Suite 2900 Atlanta, Georgia 30323 Mr. P. K. Van Doorn

  • Senior Resident Inspector McGuire Nuclear Station Mr. Dayne Brown, Chief Radiation Protection Branch Division of Facility Services Department of Human Services 701 Barbour Drive Raleigh, North Carolina 27603-2008 }

9202240314 920206 Y g /, DR ADOCK05000gg9 I}V)) i l J

, ,. 4 m DOCUMENT CONTROL No ITEl-0400-05 REVISION NO. 000 PAGE NO. 1 0F 773 N MCGUIRE lifilT 1 CYCLE 8 CORE OPERATillG LIMITS REPORT SIGN OFF DATE PREPARED BY.-

ks;L D. b l9 h o 9(

CHECKED BY ' .I y ,

c44 /9 Ab 3I d

APPROVED BY Y + <[ @*d /4 /VOv 9 /

i i

b -

_