Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K0641999-09-0101 September 1999 Proposed Tech Specs,Changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2,correcting Dc Voltage & Degraded Voltage Settings in SR 3.3.6.2 & Correcting Typo in TS 5.6 ML20211G7681999-08-27027 August 1999 Proposed Tech Specs,Allowing Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities While Irradiated Fuel Assembly Movement Continues in SFP ML20207F0261999-06-0101 June 1999 Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2 ML20195B2751999-03-31031 March 1999 Rev 0 to Rept 98-FSW-021, Corrosion Test of SG Tubes with Alloy 800 Mechanical Sleeves ML20204H6011999-01-29029 January 1999 Age Related Degradation Insp (Ardi) Program Technical Requirements Document for Mechanical Systems ML20196E2191998-11-30030 November 1998 Proposed Tech Specs,Allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 Repair Sleeves ML20195K3831998-11-20020 November 1998 Proposed Tech Specs Removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section XI, Subsections IWE & Iwl,Per 10CFR50.55a ML20195J7181998-11-19019 November 1998 Proposed Tech Specs 3.7.6, SWS, Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20155F7001998-10-30030 October 1998 Proposed Tech Specs Bases,Revs 1,2 & 3 Re List of Effective Pages for Plant ML20154N1961998-10-16016 October 1998 Proposed Tech Specs Pages,Revising TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20198A2981998-09-15015 September 1998 Technical Procedure CP-217,rev 7,PCR 98-034, Specifications & Surveillance,Secondary Chemistry ML20198A3131998-09-15015 September 1998 Technical Procedure CP-224,rev 4,PCR 97-049, Monitoring Radioactivity in Systems Normally Uncontaminated ML20236S5621998-07-20020 July 1998 Proposed Tech Specs Providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20195B2861998-06-0505 June 1998 Rev 0 to Rept 98-TR-FSW-005, Test Rept on Alloy 800 Mechanical Sleeve-Addl Qualification Testing Using Low Yield Strength Tubing ML20217D2691998-04-21021 April 1998 Proposed Tech Specs Re Change to Reactor Coolant Sys Flow Requirements to Allow Increased SG Tube Plugging ML20216H0831998-03-16016 March 1998 Rev 13 to Proposed TS Re Conversion to Improved TSs ML20198A2911998-02-23023 February 1998 Technical Procedure CP-206,rev 4,PCR 98-034, Specifications & Surveillance Component Cooling/Service Waster System ML20199J5281998-01-28028 January 1998 Proposed Tech Specs,Converting to Improved TSs ML20198K9851998-01-12012 January 1998 Rev 11 to Proposed Tech Specs,Reflecting Conversion to Improved Sts,Per NUREG-1432 ML20198R7331997-11-0505 November 1997 Proposed Tech Specs Pages Re Rev 10 to Convert to Improved TS ML20217K6161997-10-23023 October 1997 Proposed Tech Specs Section 3.8 Re Change Request to Convert to Improved Std TSs ML20217K6671997-10-22022 October 1997 Proposed Tech Specs Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20198K3321997-10-20020 October 1997 Proposed Tech Specs Section 3.3 Re Change Request to Convert to Improved Std TSs ML20217G3571997-10-0606 October 1997 Proposed Tech Specs Section 3.6 to Reflect Conversion to Improved STS ML20217G3781997-10-0606 October 1997 Proposed Tech Specs Section 3.7 Re Change Request to Convert to Improved STS ML20211J2751997-10-0202 October 1997 Proposed Tech Specs,Reflecting New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20217C7361997-09-29029 September 1997 Proposed Tech Specs Page Omitted from 970609 License Amend Request Re Conversion to Improved TSs ML20211J2981997-09-18018 September 1997 Pump & Valve IST Program Third Ten-Yr Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20210T8701997-09-10010 September 1997 Proposed Tech Specs Rev 5 to Section 3.4 of Original License Amend Application & Other Changes Identified by Personnel ML20210K9711997-08-14014 August 1997 Proposed Tech Specs,Reflecting Removal of TSTF-115,as Well as Other Changes Identified by Plant Personnel ML20149H5821997-07-21021 July 1997 Rev 2 to TS Sections 4.0 & 5.0,converting to Improved Std Tss,Per NUREG-1432 ML20148P7171997-06-27027 June 1997 Proposed Tech Specs Revising Wording to Support Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20141G4471997-06-16016 June 1997 Ccnpp Unit 2 Cycle 12 Startup Testing Rept ML20141D9341997-05-0909 May 1997 Radiation Safety Procedure 1-104, Area Posting & Barricading & High Radiation Area Pre-Entry Checklist ML20135F0441997-03-0606 March 1997 Proposed Tech Specs,Superceding Previously Submitted Marked Up Pp for ABB-CE Sleeves.New Info to Be Incorporated in Updated Licensing rept,CEN-630-P,Rev 01, Repair of 3/4 OD SG Tubes Using Leak Tight Sleeves ML20134E3221997-02-0303 February 1997 Proposed Tech Specs for Vol 16,Unit 1 Current Markup Improved Conversion License Amend Request ML20134E3361997-02-0303 February 1997 Proposed Tech Specs Vol 17,Unit 2 Current Markup Improved Conversion License Amend Request ML20134D3041997-01-31031 January 1997 Proposed Tech Specs Re Requirements to Allow Increased SG Tube Plugging ML20210P3971996-12-0404 December 1996 Rev 2 to RP-2-101, Administrative Procedure Radwaste Mgt ML20135A5231996-11-26026 November 1996 Proposed Tech Specs Adopting Option B of 10CFR50,App J to Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20134N1831996-11-20020 November 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML20210P3871996-10-17017 October 1996 Rev 2,Change 0 to Offsite Dose Calculation Manual ML20128Q8041996-10-14014 October 1996 Cycle 13 Summary of Startup Testing ML20128H6031996-10-0303 October 1996 Proposed Tech Specs,Changing Provisions for Receiving, Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7991996-09-10010 September 1996 Proposed Tech Specs 3/4.3 Re instrumentation,3/4.5 Re ECCS & 3/4.6 Re Containment Sys ML20117L3441996-09-0404 September 1996 Proposed Tech Specs Clarifying License Amend Request Re Implementation of Changes to Radiological Effluent TSs as Proposed by GL 89-01 ML20116F8281996-08-0101 August 1996 Proposed Tech Specs Re Use of Blind Flanges in Place of Containment Purge Valves During Operation ML20116E3771996-07-26026 July 1996 Proposed Tech Specs Allowing Repair of Defective SG Tubes by Electrosleeving ML20117F6431996-05-15015 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls ML20101K6011996-03-28028 March 1996 Proposed TS Figure 3.1.1-1 Re Change to Moderator Temp Coefficient 1999-09-01
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20207F0261999-06-0101 June 1999 Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2 ML20204H6011999-01-29029 January 1999 Age Related Degradation Insp (Ardi) Program Technical Requirements Document for Mechanical Systems ML20198A2981998-09-15015 September 1998 Technical Procedure CP-217,rev 7,PCR 98-034, Specifications & Surveillance,Secondary Chemistry ML20198A3131998-09-15015 September 1998 Technical Procedure CP-224,rev 4,PCR 97-049, Monitoring Radioactivity in Systems Normally Uncontaminated ML20198A2911998-02-23023 February 1998 Technical Procedure CP-206,rev 4,PCR 98-034, Specifications & Surveillance Component Cooling/Service Waster System ML20211J2981997-09-18018 September 1997 Pump & Valve IST Program Third Ten-Yr Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20141D9341997-05-0909 May 1997 Radiation Safety Procedure 1-104, Area Posting & Barricading & High Radiation Area Pre-Entry Checklist ML20210P3971996-12-0404 December 1996 Rev 2 to RP-2-101, Administrative Procedure Radwaste Mgt ML20210P3871996-10-17017 October 1996 Rev 2,Change 0 to Offsite Dose Calculation Manual ML20095G7841995-10-12012 October 1995 Change 95-086 to Rev 4 to Technical Procedure CP-217, Specs & Surveillance:Secondary Chemistry ML20095G7621995-09-27027 September 1995 Rev 2 to Administrative Procedure NO-1-106, Functional Evaluation/Operability Determination ML20095G7771995-05-23023 May 1995 Rev 0 to Administrative Procedure RM-1-103, Commitment Mgt ML20095G7661995-02-27027 February 1995 Rev 3 to Administrative Procedure QL-2-100, Issue Reporting & Assessment ML20078A3611995-01-18018 January 1995 Change 5 to Rev 0,to Program Plan for Second Insp Interval for Plant,Units 1 & 2 ML20072T4141994-08-29029 August 1994 Rev 0,Change 1 to Emergency Response Plan Implementation Procedure,Erpip 203.Change Replaces Entire Procedure ML20072T3741994-08-29029 August 1994 Rev 1,Change 3 to Emergency Response Plan Implementation Procedures,Erpip 201.Rev Replaces Pages 3 & 4 & Review/ Approval Page ML20095G7781994-08-19019 August 1994 Rev 0 to Administrative Procedure MN-3-111, Erosion/ Corrosion Monitoring of Secondary Piping ML20064F2221993-09-0101 September 1993 Rev B/Change 1 to Calvert Cliffs Instruction CCI-803, Radioactive Matls Mgt ML20064F2011993-08-26026 August 1993 Rev 1,Change 0 to Odcm ML20095G7551993-08-11011 August 1993 Rev 0 to Administrative Procedure NS-1-300, Industry Operating Experience Info Processing ML17179A8601993-03-12012 March 1993 Rev 1/Change 0 to LCM-11S, Component Level Itlr Screening Procedure for Structures. ML20044C5291993-03-0101 March 1993 Rev 4/Change 0 to LCM-11, Life Cycle Mgt Component Level Itlr Screening Procedure for Sys. ML20056F5701993-02-18018 February 1993 Rev 0 to Change 1 to Odcm ML20118A8241992-09-18018 September 1992 Technical Criteria & Procedures Used for Generation of In- Structure Response Spectra ML20091N3031992-01-0606 January 1992 Rev 10 to Support Procedures - Media Response Procedure ERPIP-B.2, Off-Site Survey Points. Rev Deletes Photographs of off-site Points ML20077R2701991-08-31031 August 1991 Rev 2 to Calvert Cliffs Nuclear Power Plant Fitness-for-Duty Manual ML20058E5571990-10-29029 October 1990 Rev 5 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program ML20059H2871990-09-0707 September 1990 Rev 4 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program ML20044B0421990-07-13013 July 1990 Rev 3 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program. ML20042E8291990-04-30030 April 1990 Rev 2 to Calvert Cliffs Performance Improvement Plan Implementation Program. ML20042G3771990-04-16016 April 1990 Changes 1-3 to Rev 0 to Program Plan for Second Insp Interval for Calvert Cliffs Nuclear Plant,Units 1 & 2. ML19332F3041989-12-0808 December 1989 Rev 3 to Surveillance Test Procedure STP-M-662-2, Integrated Leak Rate Test,Unit 2 Containment. ML20246L7641989-08-14014 August 1989 Corrected Pages for Substitution Into Performance Improvement Plan (PIP) Implementation Program & Table 1.4 Which Sorts PIP Action Plans by Root Cause & Updated Schedule & Resource Summaries ML20247M5741989-07-31031 July 1989 Performance Improvement Plan Implementation Program ML20248H8121989-04-30030 April 1989 Performance Improvement Plan ML20204G5821988-09-26026 September 1988 Rev 1 to ASME Section XI Pump & Valve Test Programs-Units 1 & 2 Second 10-Yr Interval ML20029A7671988-07-27027 July 1988 Rev 1 to Chemistry Procedure CP 607, Offsite Dose Calculation Manual. ML20154J0991988-02-10010 February 1988 Operating Manual;Emergency Operating Procedures ML20148L6431987-11-30030 November 1987 Program Plan for Second Insp Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20239A0561987-02-28028 February 1987 Operating Procedure OP-17-60-016-0, Ultrasonic Thickness Measurement Piping Using Swri Thickness Data Acquisition Sys ML20205P4611986-12-31031 December 1986 Rev 0 to ASME Section XI Pump & Valve Test Programs - Units 1 & 2,Second 10-Yr Interval ML20198H4271986-03-26026 March 1986 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to Erpip 4.1.3, Technical Support Ctr Roster, Rev 9 to Erpip 4.1.4, OSC Roster & Rev 10 to Erpip 4.1.17, Security. W/860522 Release Memo ML20198C5061985-11-0101 November 1985 Supplemental Program Plan for Dcrdr ML20138A3931985-09-20020 September 1985 Rev 9 to Emergency Response Plan Implementation Procedure Erpip 5.0, Preparation & Control of Emergency Response Plan & Implementation Procedures ML20236U2791985-08-0505 August 1985 Rev 3 to Operating Procedure X-FE-101-3, Onsite NDE Records Control ML20090B5881984-05-0202 May 1984 Public Version of Revised Emergency Response Plan Implementation Procedures,Including Rev 10 to Erpip 4.1.17, Rev 9 to Erpip 5.4 & Rev 2 to Erpip A.2 ML20090B6891984-04-18018 April 1984 Public Version of Rev 15 to Emergency Response Plan Implementing Procedure Erpip A.1, Emergency Organization Telephone Numbers ML20087F2591984-03-14014 March 1984 Instruction CCI-310, Emergency Operating Procedure Writers Guide. Emergency Operating Plan Validation/Verification Plan & Training Plan Encl ML20155H2161984-02-20020 February 1984 Remote I/O Equipment Hardware Acceptance Test Procedure for NUS Corp/Bg&E Calvert Cliffs Data Acquisition Sys ML20106H1901984-02-0202 February 1984 Remote I/O Hardware Acceptance Test Procedure for NUS Corp/Bg&E Calvert Cliffs Data Acquisition Sys at Computer Products,Inc 1999-06-01
[Table view] |
Text
._ _ _ _ _ _ _ _ _ _ _
, ?
R rt;T E.DENTON Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant Vice President 1650 Calvert Cliffs Parkway Nuclear Energy Lusby, Maryland 20657 410 586-2200 Ext.4455 local 410 260-4455 Baltimore l
January 18,1995 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Changes to Inservice Inspection Program Plan for Calvert Cliffs Units I and 2
REFERENCES:
(a) Letter from hir. G. C. Creel (BGE) to Mr. R. A. Capra (NRC), dated January 11,1990, Approval of Second Ten-Year Inservice Inspection Program Plan for Calvert Cliffs Units 1 and 2 (b) Letter from Mr. G. C. Creel (BGE) to Document Control Desk (NRC),
dated May 10,1990, Second Ten-Year Inservice Inspection Program Plan for Calvert Cliffs Units 1 and 2 Reference (a) reported approval of our second ten-year Inservice Inspection (ISI) Program Plan.
Reference (b) provided Changes I through 3 to the ISI Program Plan. Attached please find Change 5 to the Inservice inspection (ISI) Program Plan for the Second Inspection Interval as required by ASME Code Section XI. This change adds additional code cases for possible future use at Calvert Cliffs. The additions are necessary because of recent activity by the ASME XI Code Committee which indicates that they are going to annul older code cases that have already been incorporated into later additions of ASME Code l Section XI. Once annulled, these older code cases can only be utilized at Calvert Cliffs if they are identified in the ISI Program Plan. We do not plan to change our ISI code commitment until the ten-year ISI Plan is updated at the end of the second inspection interval.
Also attached for your information is Change 4, which corrects a typographical error on Page 13, Table 1.
The reference figure for examination category should be IWB-2500-14, rather than IWB-2500-13.
Figure IWB-2500-14 better represents the as-built conditions at Calvert Cliffs.
n e o r, r o 4u0UcU i
9501240373 950110 PDR I P
ADOCK 05000317 PDR
I Document Control Desk I
January 18,1995 Page 2 ;
Should you have any questions regarding this matter, we will be pleased to discuss them with you.
l Very truly yours, N -.,
RED /MDhi/bjd i Attacitments cc: D. A.13 rune, Esquire J. E. Silberg, Esquire L. B. Marsh, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC R. I. McLean, DNR J. II. Walt- , PSC l
l l
l
Chance 5 G. RELIEF REQUESTS AND CODE CASES 6.1 Relief Requests In accordance with 10CFR50.55a(g)(5)(iv), BG&E has requested relief from those ASME Section XI requirements that have been determined impractical for certain areas. This section summarizes each Relief Request ruir.nitted to the NRC for consideration. Each request provides information on the component for which relief is requested, ASME requirements, proposed alternate method, and other pertinent information, as needed. Additional Relief Requests will be submitted to the NRC as appropriate.
Table 5 presents a summary of the enclosed Relief Requests.
6.2 ASME Code Cases In accordance with 10CFR50.55a, footnote 6, ASME Section XI Code Cases referenced in Regulatory Guide 1.147, " Inservice Inspection Code Case Acceptability.ASME Section XI, Division 1," may be incorporated into the Calvert Cliffs ISI Program. Those Code Cases included in Regulatory Guide 1.147 that will be implemented at Calvert Cliffs are identified in this section. Each Code Case is preceded by information on the applicable component / area, ASME requirements, and how the Code Case will be implemented. Additional Code Cases will be included as appropriate.
Table 6 presents a summary of Regulatory Guide 1.147 Code Cases that will be used.
Table 7 presents a summary of additional Regulatory Guide 1.147 Code Cases that may be used.
O V
O 39
BALTIMORE GAS & ELECTRIC COMPANY PROGRAM Pi.AN FOR THE SECOND INSPECTION Chance 5 INTERVAL FOR CALVERT CLIFFS Pagei DO "uc'E4a aowEa a'aur. unirS , a 2 Rev'eiem o SwRI PROJECT 17-3724 EFFECTIVITY AND APPROVAL REVISION O OF THIS PROGRAM PLAN BECAME EFFECTIVE ON November 10. 1987 .
THIS PROGRAM PLAN CONSISTS OF THE PAGES AND CHANGES LISTED BELOW.
UST OF EFFECDVE PAGES AND CHANGES PAGE No. CHANGE No. REVISION DATE EFFECTIVE Title Page 0 November 1987 i 5 0 October 1994 il through lii 0 November 1987 1 0 November 1987 2 3 0 March 1990 3 through 8 0 November 1987 9 2 0 September 1989 10 through 12 0 November 1987 13 4 0 November 1992 14 through 21 0 November 1987 22 3 0 March 1990 23 through 26 0 November 1987 27 3 0 March 1990 28 through 30 0 November 1987 31 3 0 March 1990 32 through 38 0 November 1987 39 5 0 October 1994 40 through 53 0 November 1987 54 1 0 September 1988 55 through 65 0 November 1987 66 1 0 September 1988 67 through 68 5 0 October 1994 l
l i
APPROVALS
, WRITTEN BY BG&E ISI ENGINEER CCNPP PLANT GENERAL MANAGER M
l
Change 5 Table 7 m
! i
( ) ADDITIONAL REGULATORY GUIDE 1.147 CODE CASES THAT MAY BE USED Code Section XI Case Enference Descrintion N 98 IWA 2232 Calibration Block Tolerances,Section XI N-211 Appendix III 3330 Recalibration of Ultrasonic Equipment Upen Change of Personnel,Section XI, Division 1 N 235 Section V, T-432.1.2 Ultrasonic Calibration Checks per Section V,Section XI, Division 1 N-2361 IWE 4000 & IWE.7000 Repair and Replacement of Class MC Vessels,Section XI, Division 1 N-311 IWC 25001 Alternative Examination of Outlet Nozzle on Secondary Side of Steam Generators,Section XI, Division 1 N 355 Appendix III 3410 Calibration Block for Angle Beam Examination of Large Fittings in Accordance with Appendix III-3410,Section XI, Division 1 N 356 IWA 2300(a)(1) Certification Period for Level III NDE Personnel,Section XI, Division 1,2, and 3 N-389* IWA 4000 &IWA-7000 Alternative Rules for Repairs, Replacements, or Modifications,Section XI,
,. s Division 1
/ T O N 4011 Appendix IV 3000 Eddy Current Examination,Section XI, Division 1 N 402-1 IWA 2233 Eddy Current Calibration Standards,Section XI, Division 1 N 409 2 Section XI,1974 Edition Procedure and Personnel Qualification Requirements for Ultrasonic Detection Through 1986 Addendum and Sizing of Flaws in Piping Welds,Section XI, Division 1 N 419 IWB-2500-1 Extent of VT 1 Examinations, Category B-G 1 of Table IWB-25001,Section XI, Division I N-427* IWA 1400 Code Cases In Inspection Plans,Section XI, Division 1 N 4291 IWA 2232(a)(1) Alternative Rules for Ultrasonic Instrument Calibration,Section XI, Division I N 432 IWB 4300 Repair Welding Using Automatic or Machino Gas Tungsten Arc Welding (GTAW)
Temperbead Technique,Section XI, Division 1 N 435-1 IWB-2500-1 & IWC- Alternative Examination Requirements for Vessels with Wall Thickness 2 in. or 2500-1 less,Section XI, Division 1 N-437 IWA-5260 Use of Digital Readout and Digital Measurement Devices for Performing Pressure Test,Section XI, Division 1 N 448 IWA 2300(c) Qualification of VT 2 and VT-3 Examination Personnel,Section XI, Division I
! \
U 67
Change 5 ;
.C' Table 7 :
ADDITIONAL REGULATORY GUIDE L147 CODE CASES
[7 TIIAT MAY BE USED (CONT'D)
O Code Section XI .
CA&g Reference Descrintion N 449 IWA 2300(c) Qualification of VT 4 Visual Examination Personnel,Section XI, Division 1 N 457 Appendix VI 2430 Qualification Specimen Notch location for Ultrasonic Examinstion of Bolts and Studs,Section XI, Division 1 N 458 IWA 2221 Magnetic Particle Examination of Coated Materials,Section XI, Division 1 N 460 IWB 2500 & IWC-2500 Alternative Examination Coverage for Class 1 and Class 2 Welds, Section .
XI, Division 1 N 461* Appendix III 3410 Alternative Rules for Piping Calibration Block Thickness,Section XI, Division 1 N 4631 IWB-3514.2 Evaluation Procedures and Acceptance Criteria for Flaws i:: Cb. I Ferritic Piping that Exceed the Acceptance Standards of IWB 3514.2,Section XI, '
Division 1 ,
N 471 IWB-2420 & IWC-2420 Acoustic Emission for Successive Inspections,Section XI, Division 1 N 481 IWB-2500-1 Alternate Examination Requirements for Cast Austenitic Pump Casings,Section XI, Division 1 N 485-1 IWA-2220 Eddy Current Examination of Coated Ferritic Surfaces as an Alternative to '
Surface Examination,Section XI, Division 1 N-489 IWA 2300 Alternative Rules for Level III NDE Qualification Examinations,Section XI, Divisions 1,2, and 3 N 4901 IWA 2300(c) Alternative Vision Test Requirements for Nondestructive Examiners,Section XI, Divisions,1,2, and 3 N 491 IWF Alternative Rules for Examination of Class 1,2,3, and MC Component Supports of Light-Water Cooled Power Plants,Section XI, Division 1 x i
N 494 IWB-3514.2 Pipe Specific Evaluation Procedures and Acceptance Criteria for Flaws in Class 1 Ferritic Piping that Exceeds the Acceptance Standards ofIWB.
3514.2,Section XI, Division 1 !
l N 495 IWC-5222 & IWD 5223 Hydrostatic Testing of Relief Valves,Section XI, Division 1 N 496 IWA 7000, IWB 7000, IWC. Helical Coil Threaded Inserts,Section XI, Division 1 7000 & IWD 7000 N 498 IWB 2500-1 & IWC-25001 Alternative Rules for 10-Year IIydrostatic Pressure Testing for Class 1 and 2 Systems,Section XI, Division 1
. A
'6 Tatde 1 INSERVICE DGPECTION PROGRAM CIASS 1 COMPONENI3 (Cont'd)
I
- Isen Beaunscion Components and Paris To Be Emm== ann F===== nam Repwemeses for Fm====mna Technuque/P====== mag No. Categpry Omnuned Method Second Inspvtion Interval Ases Cos==emen SITAM GENEIMTORS l
B230 B-B Grcundemuni and Voheneme One cucumfemeal and one mershonal weld F====mn=s wW be pedorned wish tR wiR be e====ed *llte enanunstsons wiE be
- Mermisonal Wekts in the L-B231
! B232 tower Head limited to one of the tuo secam pnerators per unit.
B140 B-B Tubeshees-ac41 cad Weld Volumetne *Ilic tidaheet-ec> head weld wis be enar==ed Emanummenon wiB be pedonned wiek (Jr De- = wiu be limited to one of the
two steam peeraeors per unit.
B1130 B-D Nomdeto-Vesmet Welds and Voluneetnc AE acerie ecMhet melds and =rner inside radies Fm=m=m==nn=a wiE be pedormied with IJr B1140 Noede Inside Radius Sections sections wig be esamened. At least 25% but not - --e -
enore than 50% of the moedes shmE be
- by the end of the fint immpection period and the
, w sentaander by the end of the inspection inserval ta No di===a=, meeeel monde weeds on seensa '
Bilo B-F Noezhsc> Safe End Dismanilar N/A IEJ10 Metal Welds Fne-na= at Cheuert OilEL B190 :
B&90 BG1 E .?- . Botung N/A No behing on steen yrme-ana >2 inches in i B&100 >2 Inches in Diameter di====*e at Omhert Oiss.
B&110 l B7JO BG2 Bohs, Studs, and Nues Vuust (VT-1) AE boks, studu, and muss wis be esamened- F==== aman == smay be pedan=ed in pimee under 5,2 I= rte = in Demeter teamion or when semoued
, B830 BH InsegraEy Welded Vaa==* erie De vessel support sidre wM bc ====n==d De F======aia== wM be pesformoed per Rpse -
] Are=riuneses *===== man wiB be E=inat to cae sneem IWB-250014.
]
ynemoor.
B1530 B-P 7 . Visumi (VT-2) AM seessi poemaa- ca-pa===a= to be exammmed VT *======== wM be pedaemed in Boundanes during syneem leakay test. Fu=====na== to be amonismee wish IWA-SMG.
pedonned in acconimace with IWB-5221 prior to Pi mmt snartup aber each sefuehag casey.
2 B1531 B-P T_ .- P ' . Vuual (VT-2) AE seems paes= nae ma pa=.=an to be h VT h um be pedar==d in 3 var ==d=,ses dusing synessa hydsassane test. F=====hnma to acconimaec wish IWA,5 MIL be pedormed in accosdames with IWB,5222 at or f
i acer the end of the inspection sneerut '
g Bl&20 BQ Volumeene De tidning in the hot leg side, IMead porton, Seese Genersoor Denng F===i==ma= sequmemann, ===n== mag smethod, and *Teia==ay cold leg side wiE be e=====ed and the essent and fsequency of - -
shmE be in