Rev 9 to Emergency Response Plan Implementation Procedure Erpip 5.0, Preparation & Control of Emergency Response Plan & Implementation ProceduresML20138A393 |
Person / Time |
---|
Site: |
Calvert Cliffs |
---|
Issue date: |
09/20/1985 |
---|
From: |
Russell J BALTIMORE GAS & ELECTRIC CO. |
---|
To: |
|
---|
References |
---|
ERPIP-5.0-01, ERPIP-5.0-1, NUDOCS 8510080544 |
Download: ML20138A393 (12) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K0641999-09-0101 September 1999 Proposed Tech Specs,Changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2,correcting Dc Voltage & Degraded Voltage Settings in SR 3.3.6.2 & Correcting Typo in TS 5.6 ML20211G7681999-08-27027 August 1999 Proposed Tech Specs,Allowing Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities While Irradiated Fuel Assembly Movement Continues in SFP ML20207F0261999-06-0101 June 1999 Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2 ML20195B2751999-03-31031 March 1999 Rev 0 to Rept 98-FSW-021, Corrosion Test of SG Tubes with Alloy 800 Mechanical Sleeves ML20204H6011999-01-29029 January 1999 Age Related Degradation Insp (Ardi) Program Technical Requirements Document for Mechanical Systems ML20196E2191998-11-30030 November 1998 Proposed Tech Specs,Allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 Repair Sleeves ML20195K3831998-11-20020 November 1998 Proposed Tech Specs Removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section XI, Subsections IWE & Iwl,Per 10CFR50.55a ML20195J7181998-11-19019 November 1998 Proposed Tech Specs 3.7.6, SWS, Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20155F7001998-10-30030 October 1998 Proposed Tech Specs Bases,Revs 1,2 & 3 Re List of Effective Pages for Plant ML20154N1961998-10-16016 October 1998 Proposed Tech Specs Pages,Revising TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20198A2981998-09-15015 September 1998 Technical Procedure CP-217,rev 7,PCR 98-034, Specifications & Surveillance,Secondary Chemistry ML20198A3131998-09-15015 September 1998 Technical Procedure CP-224,rev 4,PCR 97-049, Monitoring Radioactivity in Systems Normally Uncontaminated ML20236S5621998-07-20020 July 1998 Proposed Tech Specs Providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20195B2861998-06-0505 June 1998 Rev 0 to Rept 98-TR-FSW-005, Test Rept on Alloy 800 Mechanical Sleeve-Addl Qualification Testing Using Low Yield Strength Tubing ML20217D2691998-04-21021 April 1998 Proposed Tech Specs Re Change to Reactor Coolant Sys Flow Requirements to Allow Increased SG Tube Plugging ML20216H0831998-03-16016 March 1998 Rev 13 to Proposed TS Re Conversion to Improved TSs ML20198A2911998-02-23023 February 1998 Technical Procedure CP-206,rev 4,PCR 98-034, Specifications & Surveillance Component Cooling/Service Waster System ML20199J5281998-01-28028 January 1998 Proposed Tech Specs,Converting to Improved TSs ML20198K9851998-01-12012 January 1998 Rev 11 to Proposed Tech Specs,Reflecting Conversion to Improved Sts,Per NUREG-1432 ML20198R7331997-11-0505 November 1997 Proposed Tech Specs Pages Re Rev 10 to Convert to Improved TS ML20217K6161997-10-23023 October 1997 Proposed Tech Specs Section 3.8 Re Change Request to Convert to Improved Std TSs ML20217K6671997-10-22022 October 1997 Proposed Tech Specs Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20198K3321997-10-20020 October 1997 Proposed Tech Specs Section 3.3 Re Change Request to Convert to Improved Std TSs ML20217G3571997-10-0606 October 1997 Proposed Tech Specs Section 3.6 to Reflect Conversion to Improved STS ML20217G3781997-10-0606 October 1997 Proposed Tech Specs Section 3.7 Re Change Request to Convert to Improved STS ML20211J2751997-10-0202 October 1997 Proposed Tech Specs,Reflecting New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20217C7361997-09-29029 September 1997 Proposed Tech Specs Page Omitted from 970609 License Amend Request Re Conversion to Improved TSs ML20211J2981997-09-18018 September 1997 Pump & Valve IST Program Third Ten-Yr Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20210T8701997-09-10010 September 1997 Proposed Tech Specs Rev 5 to Section 3.4 of Original License Amend Application & Other Changes Identified by Personnel ML20210K9711997-08-14014 August 1997 Proposed Tech Specs,Reflecting Removal of TSTF-115,as Well as Other Changes Identified by Plant Personnel ML20149H5821997-07-21021 July 1997 Rev 2 to TS Sections 4.0 & 5.0,converting to Improved Std Tss,Per NUREG-1432 ML20148P7171997-06-27027 June 1997 Proposed Tech Specs Revising Wording to Support Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20141G4471997-06-16016 June 1997 Ccnpp Unit 2 Cycle 12 Startup Testing Rept ML20141D9341997-05-0909 May 1997 Radiation Safety Procedure 1-104, Area Posting & Barricading & High Radiation Area Pre-Entry Checklist ML20135F0441997-03-0606 March 1997 Proposed Tech Specs,Superceding Previously Submitted Marked Up Pp for ABB-CE Sleeves.New Info to Be Incorporated in Updated Licensing rept,CEN-630-P,Rev 01, Repair of 3/4 OD SG Tubes Using Leak Tight Sleeves ML20134E3221997-02-0303 February 1997 Proposed Tech Specs for Vol 16,Unit 1 Current Markup Improved Conversion License Amend Request ML20134E3361997-02-0303 February 1997 Proposed Tech Specs Vol 17,Unit 2 Current Markup Improved Conversion License Amend Request ML20134D3041997-01-31031 January 1997 Proposed Tech Specs Re Requirements to Allow Increased SG Tube Plugging ML20210P3971996-12-0404 December 1996 Rev 2 to RP-2-101, Administrative Procedure Radwaste Mgt ML20135A5231996-11-26026 November 1996 Proposed Tech Specs Adopting Option B of 10CFR50,App J to Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20134N1831996-11-20020 November 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML20210P3871996-10-17017 October 1996 Rev 2,Change 0 to Offsite Dose Calculation Manual ML20128Q8041996-10-14014 October 1996 Cycle 13 Summary of Startup Testing ML20128H6031996-10-0303 October 1996 Proposed Tech Specs,Changing Provisions for Receiving, Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7991996-09-10010 September 1996 Proposed Tech Specs 3/4.3 Re instrumentation,3/4.5 Re ECCS & 3/4.6 Re Containment Sys ML20117L3441996-09-0404 September 1996 Proposed Tech Specs Clarifying License Amend Request Re Implementation of Changes to Radiological Effluent TSs as Proposed by GL 89-01 ML20116F8281996-08-0101 August 1996 Proposed Tech Specs Re Use of Blind Flanges in Place of Containment Purge Valves During Operation ML20116E3771996-07-26026 July 1996 Proposed Tech Specs Allowing Repair of Defective SG Tubes by Electrosleeving ML20117F6431996-05-15015 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls ML20101K6011996-03-28028 March 1996 Proposed TS Figure 3.1.1-1 Re Change to Moderator Temp Coefficient 1999-09-01
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20207F0261999-06-0101 June 1999 Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2 ML20204H6011999-01-29029 January 1999 Age Related Degradation Insp (Ardi) Program Technical Requirements Document for Mechanical Systems ML20198A2981998-09-15015 September 1998 Technical Procedure CP-217,rev 7,PCR 98-034, Specifications & Surveillance,Secondary Chemistry ML20198A3131998-09-15015 September 1998 Technical Procedure CP-224,rev 4,PCR 97-049, Monitoring Radioactivity in Systems Normally Uncontaminated ML20198A2911998-02-23023 February 1998 Technical Procedure CP-206,rev 4,PCR 98-034, Specifications & Surveillance Component Cooling/Service Waster System ML20211J2981997-09-18018 September 1997 Pump & Valve IST Program Third Ten-Yr Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20141D9341997-05-0909 May 1997 Radiation Safety Procedure 1-104, Area Posting & Barricading & High Radiation Area Pre-Entry Checklist ML20210P3971996-12-0404 December 1996 Rev 2 to RP-2-101, Administrative Procedure Radwaste Mgt ML20210P3871996-10-17017 October 1996 Rev 2,Change 0 to Offsite Dose Calculation Manual ML20095G7841995-10-12012 October 1995 Change 95-086 to Rev 4 to Technical Procedure CP-217, Specs & Surveillance:Secondary Chemistry ML20095G7621995-09-27027 September 1995 Rev 2 to Administrative Procedure NO-1-106, Functional Evaluation/Operability Determination ML20095G7771995-05-23023 May 1995 Rev 0 to Administrative Procedure RM-1-103, Commitment Mgt ML20095G7661995-02-27027 February 1995 Rev 3 to Administrative Procedure QL-2-100, Issue Reporting & Assessment ML20078A3611995-01-18018 January 1995 Change 5 to Rev 0,to Program Plan for Second Insp Interval for Plant,Units 1 & 2 ML20072T4141994-08-29029 August 1994 Rev 0,Change 1 to Emergency Response Plan Implementation Procedure,Erpip 203.Change Replaces Entire Procedure ML20072T3741994-08-29029 August 1994 Rev 1,Change 3 to Emergency Response Plan Implementation Procedures,Erpip 201.Rev Replaces Pages 3 & 4 & Review/ Approval Page ML20095G7781994-08-19019 August 1994 Rev 0 to Administrative Procedure MN-3-111, Erosion/ Corrosion Monitoring of Secondary Piping ML20064F2221993-09-0101 September 1993 Rev B/Change 1 to Calvert Cliffs Instruction CCI-803, Radioactive Matls Mgt ML20064F2011993-08-26026 August 1993 Rev 1,Change 0 to Odcm ML20095G7551993-08-11011 August 1993 Rev 0 to Administrative Procedure NS-1-300, Industry Operating Experience Info Processing ML17179A8601993-03-12012 March 1993 Rev 1/Change 0 to LCM-11S, Component Level Itlr Screening Procedure for Structures. ML20044C5291993-03-0101 March 1993 Rev 4/Change 0 to LCM-11, Life Cycle Mgt Component Level Itlr Screening Procedure for Sys. ML20056F5701993-02-18018 February 1993 Rev 0 to Change 1 to Odcm ML20118A8241992-09-18018 September 1992 Technical Criteria & Procedures Used for Generation of In- Structure Response Spectra ML20091N3031992-01-0606 January 1992 Rev 10 to Support Procedures - Media Response Procedure ERPIP-B.2, Off-Site Survey Points. Rev Deletes Photographs of off-site Points ML20077R2701991-08-31031 August 1991 Rev 2 to Calvert Cliffs Nuclear Power Plant Fitness-for-Duty Manual ML20058E5571990-10-29029 October 1990 Rev 5 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program ML20059H2871990-09-0707 September 1990 Rev 4 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program ML20044B0421990-07-13013 July 1990 Rev 3 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program. ML20042E8291990-04-30030 April 1990 Rev 2 to Calvert Cliffs Performance Improvement Plan Implementation Program. ML20042G3771990-04-16016 April 1990 Changes 1-3 to Rev 0 to Program Plan for Second Insp Interval for Calvert Cliffs Nuclear Plant,Units 1 & 2. ML19332F3041989-12-0808 December 1989 Rev 3 to Surveillance Test Procedure STP-M-662-2, Integrated Leak Rate Test,Unit 2 Containment. ML20246L7641989-08-14014 August 1989 Corrected Pages for Substitution Into Performance Improvement Plan (PIP) Implementation Program & Table 1.4 Which Sorts PIP Action Plans by Root Cause & Updated Schedule & Resource Summaries ML20247M5741989-07-31031 July 1989 Performance Improvement Plan Implementation Program ML20248H8121989-04-30030 April 1989 Performance Improvement Plan ML20204G5821988-09-26026 September 1988 Rev 1 to ASME Section XI Pump & Valve Test Programs-Units 1 & 2 Second 10-Yr Interval ML20029A7671988-07-27027 July 1988 Rev 1 to Chemistry Procedure CP 607, Offsite Dose Calculation Manual. ML20154J0991988-02-10010 February 1988 Operating Manual;Emergency Operating Procedures ML20148L6431987-11-30030 November 1987 Program Plan for Second Insp Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20239A0561987-02-28028 February 1987 Operating Procedure OP-17-60-016-0, Ultrasonic Thickness Measurement Piping Using Swri Thickness Data Acquisition Sys ML20205P4611986-12-31031 December 1986 Rev 0 to ASME Section XI Pump & Valve Test Programs - Units 1 & 2,Second 10-Yr Interval ML20198H4271986-03-26026 March 1986 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to Erpip 4.1.3, Technical Support Ctr Roster, Rev 9 to Erpip 4.1.4, OSC Roster & Rev 10 to Erpip 4.1.17, Security. W/860522 Release Memo ML20198C5061985-11-0101 November 1985 Supplemental Program Plan for Dcrdr ML20138A3931985-09-20020 September 1985 Rev 9 to Emergency Response Plan Implementation Procedure Erpip 5.0, Preparation & Control of Emergency Response Plan & Implementation Procedures ML20236U2791985-08-0505 August 1985 Rev 3 to Operating Procedure X-FE-101-3, Onsite NDE Records Control ML20090B5881984-05-0202 May 1984 Public Version of Revised Emergency Response Plan Implementation Procedures,Including Rev 10 to Erpip 4.1.17, Rev 9 to Erpip 5.4 & Rev 2 to Erpip A.2 ML20090B6891984-04-18018 April 1984 Public Version of Rev 15 to Emergency Response Plan Implementing Procedure Erpip A.1, Emergency Organization Telephone Numbers ML20087F2591984-03-14014 March 1984 Instruction CCI-310, Emergency Operating Procedure Writers Guide. Emergency Operating Plan Validation/Verification Plan & Training Plan Encl ML20155H2161984-02-20020 February 1984 Remote I/O Equipment Hardware Acceptance Test Procedure for NUS Corp/Bg&E Calvert Cliffs Data Acquisition Sys ML20106H1901984-02-0202 February 1984 Remote I/O Hardware Acceptance Test Procedure for NUS Corp/Bg&E Calvert Cliffs Data Acquisition Sys at Computer Products,Inc 1999-06-01
[Table view] |
Text
,
October 1, 1985 i
'lD: // S bbk
Im0M: Supervisor-Emergency Planning !
} Baltimore Gas & Electric' Company l Calvert Cliffs Nuclear Power Plant
, Office / Training Facility 1
lusby, bD 20657
)
(
Attached please find Emergency Response Plan Implementarloa Procedure revision (s)
) to be incorporated into your Procedure manual (s). blike the necessarv corrections l to your manual (s) and return this fom signed and dated.
i '
1 l fUIE: Review of these charges is required to stay current with procedure concents. t l
I j Revision (s) to be incorporated Change Sm mary 1
Procedure 5.0, Rev. 9, Qi, 2 OtM'tEIE !
" Provision added for on-the-job changes !
to ERPIPs with POSRC review within 14 {
i
, days. ;
/ !
i l 1 !
i ,
1 i i i
i !
i i !
1 i I
i 8510080544 050920 I PDR ADOCK 05000317 l I F PDR i I i 1
l l
- I have incorporated and reviewed the above listed revision (s). !
! SIGNED: DATE:
)
i 1EF:sm '
1 '
Q\ '
4 ERP!P 5.0
' Rev.9 Ch.2
' A(,'Ll\ 1M
- Generptf. Ig, Operations QA AFL ) /MW Supervisor-EPO 9 ">
POSRC MTG
'c 9 Plant Superintendent M
PREPARATION AND CONTROL OF EMERGENCY RESPONX q
PLAN AND IMPLEMENTATION PROCEDURES i
RESPONSIBLE INDIVIDUAL - Supervisor-Emergency Planning Unit i
INTRODUCTION This procedure controls preparation, review, approval, issue & distribution of Emergency
- Response Plan (ERP) and Emergency Response Plan implementation Procedures (ERP!P)
)
- and revisions and changes thereto. i l
!. PREPARATION
' O A. ERP
- As an existing document, ERP format & layout (including outline, topics, i
1 page/ attachment numbering) are established. Deviations will not be made l t without Supervnor-EPU approval.
l B. ERPIP Due to the variety of uses, format & layout is :.t the writer's discretion except:
- 1. ERPIP nutnber, revision and change (other than zero) will be marked (one under the other)in upper right hand corner of all pages (including i attachments).
- 2. Page number will be marked bottom center with last page (excluding attachments) noted " of .
O i ;
,l
ERPIP 5.3 Rev.9 Ch.2
- 3. Attachments will ce identified " Attachment 1; Attachment 2. . .".
Single attachments with multiple pages will ce marked "Page of " directly under attachment identification (no other page numbering).
'4 All ERPIPs will have a list of effective pages.
- 5. Title will o' e the first line entry (centered & capitalized).
- 6. All ERPIPs that generate a record (ie. have a sign-off or cause form completion) will require user to forward same to Supervisor-EPU.
- 7. Writer will consider procedure .vriting guidelines addressed in NUREG-0399; INPO S2-017; and equivalent documents.
- 3. Reviews addressed in !!.B.3 and !!.B.6 may be celayed up to la days from implementation for on-the-job changes (not revisions) proviced Attachment '4 is used to document the change and its provisions are implemented.
!!. REVIEi A. ERP 1.
ANNUALLY ERP will be reviewed and certified current.
A review checklist will:
- a. Demonstrate that all ERP sections . vere chec'<ec.
- 5. Identify groups / individuals from whom comments Aere soticited.
- c. Take into account changes identified 5v crtils & exercises.
- d. Icentify regulations considered during revie'v.
- e. Identify if ERP or ERP agreements revtston is meeced,
- f. Identify reviewer by name and title.
1 Document certification of urrentness.
1
- 9 .
l
ERPIP 5.0 t Rev.9 Ch.2
- h. Document that ERP was checked for consistency with the Final 4
- Safety Analysis Report (FSAR) and Technical Specifications, ,
Section 6.
- 1. Document that proposed ERP changes do not decrease its effectiveness and that the ERP as changed continues to meet 10 1
CFR 50, Appendix E,Section IV.
- 2. ERP revisions will be reviewed by Supervisor-Emergency Planning, and POSRC and Plant Superintendent in accordance with CCI-103
! Organization and Operation of POSRC. Accepted reviews will be i documented on Attachment 1. ERP revisions not accepted will be i
returned to the originator. '
i j B. ERPIP
- 1. ANNUALLY ERPIPs will be reviewed to assure they are current. ;
Reviews will be annotated " Annual Review" on Attachment 2 g review is separate from a proposed revision / review. ERPIPs do not require a j separate annual review if they were revised during the calendar year (13 months).
- 2. QUARTERLY. Phone numbers in ERPIPs will be checked and updated l (by revision / change).
i j 3. New ERPIPs and propo+ed revisions / changes will be reviewed by a i member of Emergency Planning Unit to verify compliance with i requirements of ERP!P 5.0 and Emergency Response Plan commitments. ;
i
- a. Reviewer will consider procedure writing guidelines addressed in NUREG-0399, INPO 82-017, and equivalent documents.
- b. Reviewer will use Attachment 3 to document liaison with other
{ ;
plant staff to verify ERPIP technical accuracy and usability.
4
+
1 9
T ERPIP 5.0 Rev.9 Ch.2 s
4 ERPIP 5.0 revisions / changes will be submitted to General Supervisor-Operations Quality Assurance for review and determination that Quality Assurance requirements are met.
- 5. Supervisor-Emergency Planning will:
- a. Consider reviewer and reviewer liaison comments during his review.
- b. Check that proposed ERPIP change does not cecrease ERP effectiveness and that with this change the ERP continues to meet to CFR 50, Appendix E,Section IV.
- 6. New ERPIPs and revisions / changes will be submitted to POSRC and Plant Superintendent for review in accordance with CCI-103, Organization and Operations of POSRC.
- 7. Accepted reviews will be documented on Attachment 2.
Revisions / changes not accepted will be returned to the originator.
IIL DISTRIBUTION (ERP and ERPIP)
A. Emergency Planning Unit will maintain master copy of document and associated paperwork.
- 3. ERP/ERPIPs will be available at locations they are usec at. Distribution sheets will be maintained.
C. Index will be kept of effective ERP!Ps with revision and change status.
D. Acknowledgment transmittal will be used for ERP/ERPIPs distributec to individuals. Acknowledgment return will be recorded on distribution sheet.
Acknowledgment itself will not be kept.
E. For distribution to locations, document placement ' vill oe recorded on distribution sheet by person assigned distribution responsioility by Supervisor-Emergency Planning.
O
ERP!P 5.0 Rev.9 Ch.2
\ IV. REVISION / CHANGE A. ERP Each line of text that is revised will be marked by a vertical line in the margin. Marginalindications are not required for a major revision.
B. ERPIP Each line of text that is revised or changed shall be marked by a vertical line in the margin. Marginalindications will be used to indicate the current revision or change only. Marginal indications are not required for a major ERPIP revision. The revision status of all pages of an ERPIP will be updated whenever an ERPIP is revised. The entire ERPIP shall be distributed af ter each revision.
V. RECORDS The Emergency Planning Unit shall retain the fo!!owing in accordance with ERPIP 5.2: .
A. Index of ERPIPs
. B. Distribution List (current list only)
C. Original ERPIP and ERPIP review / approval sheet and revisions thereto.
j D. ERPIP changes (until incorporated in a revision).
VI. IMPLEMENTATION This procedure is effectiva for all developed / revised / changed documents after the issue date of this revision. & back fitting will be done.
S of 5
ERPIP 5.0 Rev.9 ATTACHMENTI EMERGENCY RESPONSE PLAN REVIEW / APPROVAL REVIEWER SIG/ SUPERVISOR POSRC PLANT SUPERINTENDENT REVISION DATE EPU SIG/DATE MTG SIC /DATE O .
O
9 9
e ERPIP 5.0 Rev.9 Ch.2 r] ATTACHMENT 2 ERPIP REVIEW / APPROVAL REVIEWER SIG/ SUPERVISOR POSRC PLANT SUPERINTENDENT REVISION CHANGE DATE EPU SIG/DATE MTG SIG/DATE 1
i
\
f e
O
~ '
ERPIP 5.0 Rev.9 Ch.2 O
(y ATTACHMENT 3 DATE:
~ TO:
FROM: Supervisor-Emergency Planning
SUBJECT:
Review of Change / Revision Proposal Attached for your review and comment is a proposed change / revision to:
Document /rev./section Please complete this review by , and return the proposal with comments
\ \
to Emergency Planning Unit.
Failure to return this document &/ or comments by the date specified will, be interpreted as "no comments," and ,
the proposal will be processed.
If you have any questions regarding this proposal, please contact at . ',
Name Ext.
To: Supervisor Emergency Planning From:
O Comments o No Comment Signature /Date i
i
. V
ERPIP 5.0 i
Rev.9 Ch.2 ATTACHMENT 4
! Page I of 2 ERPIP CHANGE i-ON-THE-3OB ERPIP CHANGE
- 1. ERPIP Current revision number I
Current change number
- 2. This change will not alter the intent of this procedure.
I 3. Change:
l 1
i O
l l
i r 4 Reviewed: / (Supervisor or non-supervisor person Signature Date from user group)
/ (Supervisor-Emergency Planning or Signature Date designated alternate)
/ (Shif t Supervisor or Senior Control Signature Date Room Operator) 4
ERPIP 5.0 Rev.9 Ch.2 ATTACHMENT '4 Page 2 of 2
- NOTE -
Following is for Emergency Planning Unit use only.
- 5. Copies distributed to critical users and/or user locations (specify name, title or place) a.
b.
c.
d.
- e. /
Signature Date
- 6. Change incorporated in procedure as revision change .
- 7. Submitted for POSRC review: (Mtg#).
- 3. POSRC meeting number and Plant Superintendent approval must be documented on ERPIP 5.0, Attachment 2, Review / Approval.
O
ERPIP 5.0 Rev.9 i Ch.2 CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN 3- IMPLEMENTATION PROCEDURES i
! PAGE NUMBER REVISION
-iP i 1 9,Ch.2
! i 2 9,Ch.2 f
- 3 9,Ch.2 4 9,Ch.2 j 5 9,Ch.2 j
{ ATTACHMENT REVISION 4
! l 9,Ch.2 j 2 9,Ch.2 3 9,Ch.2
! 4, Pages 1-2 9,Ch.2 i
e i
i i
i =
I l
?
I f
O l
J i
, . , -,----_,,,,~,---7--,- a,-,
, ww _ vn - +--,~~w- .-v---.v- = - ~r ~w~~*~~' - ~"