Containment 3.6.1 SURVEILLAN'CE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY
^
SR 3.6..
Verify containment structural i ity in I accordanc a
'ance with the Cont nt Tendon with the Surveil a.
ro Contai t
r illan Pr gram i
O l
l l
l s
l i
9811270006 981120 PDR ADOCK 050003 7 P
CALVERT CLIFFS - UNIT 1 3.6.1-2 Amendment No. -BB7 1
CALVERT CLIFFS - UNIT 2 Amendment No. M i
~.
Programs and Manuals 5.5 5.5 Programs and Manuals
+. M Ccr.crctc Certaia'"-a.t Teatr Surveill ance oranram Th rogram provides controls for monitoring any tendon degrada in pre-stressed concrete containments, uding effectivenes f its corrosion protection medi
, to ensure containment struc al integrity.
The pr am shall include baseline measurements or to initi operation. The Tendon Surveillance Program, inspe requencies, and acceptance criteria shall be in accor ce Regulatory Guide 1.35, Revision 2, 1976.
The provisJ of SR 3.0.2 and SR 3.0.3 are app able to the Ten op A 6rveillance Program inspection frequencies.
5.5.7 Reactor dolant Pumo Fivwheel Inspection Procram This program shal) provide for the inspection of each reactor coolant pump flywheel per the recommendations of regulatory position c.4.b of Regulatory Guide 1.14, Revision 1, August 1975.
5.5.8 Inservice Testino Procram This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components including applicable supports. The program shall include the following:
CALVERT CLIFFS - UNIT 1 5.0-12 Amendment No. 4 W-CALVERT CLIFFS - UNIT 2 Amendment No. EM h
Reporting Requirements 5.6 i
5.6 ' Reporting Requirements 5.6.6 Pressurizer Power-Operated Relief Valve and Safety Valve Report A report shall be submitted prior to March 1 of each year documenting all failures of and challenges to the pressurizer power-operated relief valves, or safety valves.
5.6.7 Post-Accident Monitorina Report When a report is required by Condition B or G of LC0 3.3.10. " Post Accident Monitoring Instrumentation," a report shall be submitted j
within the following 14 days.
The report shall outline the preplanned alternate method of monitoring, the cause,0f the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.
5.5.3
-Ter.dcr SurvcF l =ce P.ccert An rmal degradation of the containment structure detect during the equired by the Pre-Stressed Conc ontainment Tendon Surveillance Pr shall be re pr.t o the NRC within 30 days. The report shall inc escription of the tendon conditioa, the condit the concrete ally at tendon anchorages nspection procedures, the toleran
_c
' g, and the corrective action taken.
5.6.9 Steam Generator Tube Inspection Report a.
Following each inservice inspection of steam generator tubes, the number of tubes plugged or repaired in each steam generator shall be reported to the NRC within 15 days.
b.
The complete results of the steam generator tube inservice inspection during the report period shall be submitted to the NP.C prior to March ? of each year. This rep wt shall include:
1.
Number and extent of tubes inspected; CALVERT CLIFFS - UNIT 1 5.0-39 Amendment No. M CALVERT CLIFFS - UNIT 2 Amendment No. M