Proposed Tech Specs,Allowing Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities While Irradiated Fuel Assembly Movement Continues in SFP
ML20211G768
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/27/1999
From:
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20211G764 List:
References
NUDOCS 9909010019
Download: ML20211G768 (4)


Text

i e

ATTACHMENT (3)

TECHNICAL SPECIFICATION MARKED-UP PAGE Page 3.7.13-1 1

l l

9909010019 990827 PDR ADOCK 05000317 P PDR Baltimore Gas & Electric Company Docket Nos. 50-317 & 50-318 August 27,1999

)

INSERT A p

\

and 219.8 fl over the top of fuel assemblies seated on rack spacers in the storage racks for reconstitution l activities.

l l

l

>__m

SFP Water Level  !

3.7.13 l 37 PLANT SYSTEMS I i

'3.7.13 Spent Fuel Pool-(SFP) Water Level l l

\

LCO 3.7.13-The SFP water level shall be 2 21.5 ft over the top of l 1

irradiated fuel assemblies seated in the storage rack

'i.E~ SAT A '

f APPLICABILITY: During movement of irradiated fuel assemblies in the SFP.

I ACTIONS i

CONDITION REQUIRED ACTION COMPLETION TIME i A. SFP water le 1 not A.1 --------NOTE -------

within limi 4 LCO 3.0.3 is not applicable. l Suspend movement of Immediately irradiated fuel

(

w I SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.13.1 Verify the SFP water level is 2 21.5 ft 7 days above the top of irradiated fuel assemblies a seated in the storage racks.

l 1

i CALVERT CLIFFS - UNIT 1 3.7.13-1 Amendment No. 227 CALVERT CLIFFS - UNIT 2 Amendment No. 201 I

INSERT A and 219.8 ft over the top of fuel assemblies seated on rack spacers in the storage racks for reconstitution activities.