ML20072T374

From kanterella
Jump to navigation Jump to search
Rev 1,Change 3 to Emergency Response Plan Implementation Procedures,Erpip 201.Rev Replaces Pages 3 & 4 & Review/ Approval Page
ML20072T374
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/29/1994
From:
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20072T376 List:
References
ERPIP-201, NUDOCS 9409150188
Download: ML20072T374 (8)


Text

_

. m ce TRANSMITTAL / RECEIPT ACKNOWLEDGEMENT / 94-16 DATE: 09/08/94 Eo .

$ of minina nasre . ch no . nie== nate corrections betow) FROM: Document Services ~

be 1st Floor OTF C0 Baltimore, Gas & Electric Company

@$To: # 1650 Calvert Cliffs Parkway Em Lusby, MD 20657 04 DOCUMENT CONiltOL DESK #0002

$l'* usNac f@ wash wcrow, Dc 20555 For assistance, please call (410) 260-3868 DON -

g' L34 -

DOCUMENT IDENTIFICATION SPECIAL INSTRUCTIONS EMERGENCY RESPONSE PLAN l IMPLEMENTATION PROCEDURES Erpip-201, Rev. 1/ Change 3 Replace Pages 3, 4 and the Review / Approval Page.

Erpip-203, Rev. 0/ Change 2 Replace entire procedure.

l As the Controlled Document Custodian, I acknowledge receipt of the above documents and have

  • complied with the instructions.

Please sign, date, and return this form by 09/19/94.

Controlled Document Custodian Date 046 oft ,

.__ _ _ _ _ ~

?

.,e ERPIP-201 Rev. 1 o

f- s 2.A.l. ENSURE Reactor Engineers monitor fuel and Containment

( ,) integrity.

2. ENSURE Operational Analysts monitor plant conditions and Control Room actions. REQUEST notification of significant changes, problems, needs and events.
3. PRIORITIZE and assign tasks.
a. Obtain support from the Nuclear Engineering Facility (NEF) Director as warranted,
b. Obtain support from C-E Nuclear Engineering (use Attachment 3 for initial notification) and/or Bechtel as warranted.
c. Maintain a chronological record of significant activities in the TSC-Director logbook.

B. ADVISE Plant General Manager on need for and adequacy of Protective Action Recommendations using Attachment 4, General Emergency Protective Action Recommendations.

- NOTE -

Post accident area radiological dose rates are )

provided in controlled print series62-140.

/# %

ss C. ANALYZE fuel and containment conditions.

1. REVIEW core damage assessment results with the Reactor Engineer and Chemistry Director.
2. NOTIFY the Plant General Manager of core damage assessment results.

- NOTE -

Chemistry Director will maintain an interface with Radiological Assessment Direct (RAD) and keep the RAD informed of core damage assessment results.

3. BRIEF the Radiation Protection Director (RPD) in the OSC and RAD in the EOF on core damage assessment results.

D. UPDATE personnel on situation status by periodic announcements. Routine updates my be done at 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> intervals ( ). Significant plant condition changes should be announced within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ( ) of the change.

E. MAINTAIN personnel accountability throughout the event.  !

I 7

(

) 1. ENSURE personnel are checking out with you or a j designee.  ;

i I

i 3 i l

J

ERPIP-201 j Rev. 1 I(Y Ch. 3 ,

I 2.E.2. CHECK radiological conditions with RPD before l authorizing personnel movements outside the TSC (for

! other than the Control Room).

, 3. BRIEF personnel on radiological conditions before

( authorizing travel to locations other than the control Room.

4. ENSURE personnel are signing out (use board by TSC l exit).

F. IF a large break LOCA occurred and major fuel damage exists THEN see Attachment 5 regarding Low Pressure Safety Inj ection.

G. IF e hydrogen grab sample indicates that containment hydrogen levels have reached 3.7 volume percent hydrogen, then recommend initiation of hydrogen purge from containment.

l H. IF the Control Room and/or the TSC becomes uninhabitable THEN GO TO Attachment 2. RETURN to action 2., Operation, of this part as directed by Attachment 2 actions.

I. MAINTAIN a chronological history of significant TSC events l (e.g. , maj or decisions ; actions; assessment results/ predictions; tasks; etc.).

3.0 DEACTIVATION WHEN directed to deactivate:

A. COLLECT records and documentation generated during the event.

B. SEND documentation to the Supervisor-Emergency Planning.

C. RETURN TSC unused materials and supplies to storage.

O 4 of 4 L

y l, ,

l

-h . -

lO ERPIP l

REVIEV/ APPROVAL ,

v 9 ,

i i

Calverr Cliffs Nuclear Power Plant '

i l EMERCENCY RESPONSE PLAN IMPLEMENTATION PROCEDURE ERPIP bO\

Revision I / Change 1 Effective Dace: btSTR taSt # M .

O Reviewer: e Q-[ 9 Y

,f; j Supervisor-EPU: '( 7{[//d I _ $ n78 h  ;

Signa:ure Date l POSRC Meg.0: '74-l35 , l Approved: I y j , , /[g.g g/p Sig6ature ')a':e

.r O

~

[ .

. . _ , , _ _ - _ _ - . _ , ~ _ _ _ . . ,. , .._

ERPIP-201 l Rev. l' Ch. 3, 2

LIST OF EFFECTIVE PAGES PACE NUMBER EFFECTIVE REVISION 1

1 2

1, Ch. 2 3 1 4 1, Ch. 3 ATTACHMENT EFFECTIVE REVISION 1, Pages 1-2 1 2, Pages 1-3 1 3, Pages 1-2 1 4 1, Ch. 1 5 1 0

ERPIP-201 Rev. 1 1  ;

("' 2.A.l. . ENSURE Reactor Engineers monitor fuel and Containment integrity.

2. ENSURE Operational Analysts monitor plant conditions and Control Room actions. REQUEST notification of significant changes, problems, needs and events.
3. PRIORITIZE and assign tasks.  !

i

a. Obtain support from the Nuclear Engineering j Facility (NEF) Director as warranted. ,
b. Obtain support from C-E Nuclear Engineering.(use Attachment 3 for initial notification) and/or Bechtel as warranted. .

l

c. Maintain a chronological record of significant activities in the TSC-Director logbook.

I B. ADVISE Plant General Manager on need for and adequacy of  ;

Protective Action Recommendations using Attachment 4, General Emergency Protective Action Recommendations.

- NOTE -

Post accident area radiological dose rates are provided in controlled print series62-140. i l- C. ANALYZE fuel and containment conditions.  ;

l i

1. REVIEW core damage assessment results with the Reactor 1 Engineer and Chemistry Director.
2. NOTIFY the Plant General Manager of core damage assessnent results.

- NOTE -

Chemistry Director will maintain an interface with Radiological Assessment Direct (RAD) and keep the RAD informed of core damage assessment results.

3. BRIEF the Radiation Protection Director (RPD) in the l OSC and RAD in the EOF on core damage assessment
results, l

I UPDATE personnel on situation status by periodic D.

announcements. Routine updates my be done at 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> intervals ( ). Significant plant condition changes should ,

be announced within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ( 1 ) of the change. j E. MAINTAIN personnel accountability throughout the event.  !

() 1. ENSURE personnel are checking out with you or a designee.

1 3 I i

I ,

J

l l

ERPIP-201 '!

Rev. 1 , ,

Ch. 3 O

2.E.2. CHECK radiological conditions with RPD before authorizing personnel movements outside the TSC (for other than the Control Room).

3. BRIEF personnel on radiological conditions before authorizing travel to locations other than the Control Room.
4. ENSURE personnel are signing out (use board by TSC exit).

F. IF a large break LOCA occurred and major fuel damage exists THEN see Attachment 5 regarding Low Pressure Safety Inj ection.

G. IF a hydrogen grab sample indicates that containment hydrogen levels have reached 3.7 volume percent hydrogen, then recommend initiation of hydrogen purge from containment.

H. IF the Control Room and/or the TSC becomes uninhabitable THEN GO TO Attachment 2. RETURN to action 2., Operation, of this part as directed by Attachment 2 actions.

I. MAINTAIN a chronological history of significant TSC events (e.g. , maj or decisions; actions; assessment results/ predictions; tasks; etc.).

3.0 DEACTIVATION WHEN directed to deactivate:

A. COLLECT records and documentation geaerated during the event. ,

l B. SEND documentation to the Supervisor-Emergency Planning.

C. RETURN TSC unused materials and supplies to storage.

l l

l l

l l

1 l

O l

l l

[ 4 of 4 G

i.

t ,

i I.

1. ,

l I l

l.o i

ERPI?

t REVIEV/ APPROVAL v

i i

Calvert Cliffs Nuclear Power Plant '

I EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURE l

l ERPIP bOl Revision I / Change 1 i

l l

Effective Date; bisTR tROTa c/d l

lO l l

i i

Reviewer: a ._ __

Q-l 9 Y

/ y[,w((//hy Supervisor-EPU: [n78.h Sig.acure Date POSRC Xtg.#: '74-l35 .

Approved: I J _ , # # 9/4-/

Sigsacure Data s

~

O

,- ,y-- ,- -~..e , . , 4 yy-

' 1 ERPIP-201 l Rev. 1 '

Ch. 3 o LIST OF EFFECTIVE PAGES O!

l I

l l

PAGE NUMBER EFFECTIVE REVISION 1

1 2

1, Ch. 2 3 1 4 1, Ch. 3 l

ATTACHMENT EFFECTIVE REVISION 1, Pages 1-2 1 2, Pages 1-3 1 3, Pages 1-2 1 4 1, Ch. 1 5 1 1

l f

9 i

l 1

N