Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K0641999-09-0101 September 1999 Proposed Tech Specs,Changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2,correcting Dc Voltage & Degraded Voltage Settings in SR 3.3.6.2 & Correcting Typo in TS 5.6 ML20211G7681999-08-27027 August 1999 Proposed Tech Specs,Allowing Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities While Irradiated Fuel Assembly Movement Continues in SFP ML20207F0261999-06-0101 June 1999 Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2 ML20195B2751999-03-31031 March 1999 Rev 0 to Rept 98-FSW-021, Corrosion Test of SG Tubes with Alloy 800 Mechanical Sleeves ML20204H6011999-01-29029 January 1999 Age Related Degradation Insp (Ardi) Program Technical Requirements Document for Mechanical Systems ML20196E2191998-11-30030 November 1998 Proposed Tech Specs,Allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 Repair Sleeves ML20195K3831998-11-20020 November 1998 Proposed Tech Specs Removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section XI, Subsections IWE & Iwl,Per 10CFR50.55a ML20195J7181998-11-19019 November 1998 Proposed Tech Specs 3.7.6, SWS, Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20155F7001998-10-30030 October 1998 Proposed Tech Specs Bases,Revs 1,2 & 3 Re List of Effective Pages for Plant ML20154N1961998-10-16016 October 1998 Proposed Tech Specs Pages,Revising TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20198A2981998-09-15015 September 1998 Technical Procedure CP-217,rev 7,PCR 98-034, Specifications & Surveillance,Secondary Chemistry ML20198A3131998-09-15015 September 1998 Technical Procedure CP-224,rev 4,PCR 97-049, Monitoring Radioactivity in Systems Normally Uncontaminated ML20236S5621998-07-20020 July 1998 Proposed Tech Specs Providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20195B2861998-06-0505 June 1998 Rev 0 to Rept 98-TR-FSW-005, Test Rept on Alloy 800 Mechanical Sleeve-Addl Qualification Testing Using Low Yield Strength Tubing ML20217D2691998-04-21021 April 1998 Proposed Tech Specs Re Change to Reactor Coolant Sys Flow Requirements to Allow Increased SG Tube Plugging ML20216H0831998-03-16016 March 1998 Rev 13 to Proposed TS Re Conversion to Improved TSs ML20198A2911998-02-23023 February 1998 Technical Procedure CP-206,rev 4,PCR 98-034, Specifications & Surveillance Component Cooling/Service Waster System ML20199J5281998-01-28028 January 1998 Proposed Tech Specs,Converting to Improved TSs ML20198K9851998-01-12012 January 1998 Rev 11 to Proposed Tech Specs,Reflecting Conversion to Improved Sts,Per NUREG-1432 ML20198R7331997-11-0505 November 1997 Proposed Tech Specs Pages Re Rev 10 to Convert to Improved TS ML20217K6161997-10-23023 October 1997 Proposed Tech Specs Section 3.8 Re Change Request to Convert to Improved Std TSs ML20217K6671997-10-22022 October 1997 Proposed Tech Specs Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20198K3321997-10-20020 October 1997 Proposed Tech Specs Section 3.3 Re Change Request to Convert to Improved Std TSs ML20217G3571997-10-0606 October 1997 Proposed Tech Specs Section 3.6 to Reflect Conversion to Improved STS ML20217G3781997-10-0606 October 1997 Proposed Tech Specs Section 3.7 Re Change Request to Convert to Improved STS ML20211J2751997-10-0202 October 1997 Proposed Tech Specs,Reflecting New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20217C7361997-09-29029 September 1997 Proposed Tech Specs Page Omitted from 970609 License Amend Request Re Conversion to Improved TSs ML20211J2981997-09-18018 September 1997 Pump & Valve IST Program Third Ten-Yr Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20210T8701997-09-10010 September 1997 Proposed Tech Specs Rev 5 to Section 3.4 of Original License Amend Application & Other Changes Identified by Personnel ML20210K9711997-08-14014 August 1997 Proposed Tech Specs,Reflecting Removal of TSTF-115,as Well as Other Changes Identified by Plant Personnel ML20149H5821997-07-21021 July 1997 Rev 2 to TS Sections 4.0 & 5.0,converting to Improved Std Tss,Per NUREG-1432 ML20148P7171997-06-27027 June 1997 Proposed Tech Specs Revising Wording to Support Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20141G4471997-06-16016 June 1997 Ccnpp Unit 2 Cycle 12 Startup Testing Rept ML20141D9341997-05-0909 May 1997 Radiation Safety Procedure 1-104, Area Posting & Barricading & High Radiation Area Pre-Entry Checklist ML20135F0441997-03-0606 March 1997 Proposed Tech Specs,Superceding Previously Submitted Marked Up Pp for ABB-CE Sleeves.New Info to Be Incorporated in Updated Licensing rept,CEN-630-P,Rev 01, Repair of 3/4 OD SG Tubes Using Leak Tight Sleeves ML20134E3221997-02-0303 February 1997 Proposed Tech Specs for Vol 16,Unit 1 Current Markup Improved Conversion License Amend Request ML20134E3361997-02-0303 February 1997 Proposed Tech Specs Vol 17,Unit 2 Current Markup Improved Conversion License Amend Request ML20134D3041997-01-31031 January 1997 Proposed Tech Specs Re Requirements to Allow Increased SG Tube Plugging ML20210P3971996-12-0404 December 1996 Rev 2 to RP-2-101, Administrative Procedure Radwaste Mgt ML20135A5231996-11-26026 November 1996 Proposed Tech Specs Adopting Option B of 10CFR50,App J to Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20134N1831996-11-20020 November 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML20210P3871996-10-17017 October 1996 Rev 2,Change 0 to Offsite Dose Calculation Manual ML20128Q8041996-10-14014 October 1996 Cycle 13 Summary of Startup Testing ML20128H6031996-10-0303 October 1996 Proposed Tech Specs,Changing Provisions for Receiving, Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7991996-09-10010 September 1996 Proposed Tech Specs 3/4.3 Re instrumentation,3/4.5 Re ECCS & 3/4.6 Re Containment Sys ML20117L3441996-09-0404 September 1996 Proposed Tech Specs Clarifying License Amend Request Re Implementation of Changes to Radiological Effluent TSs as Proposed by GL 89-01 ML20116F8281996-08-0101 August 1996 Proposed Tech Specs Re Use of Blind Flanges in Place of Containment Purge Valves During Operation ML20116E3771996-07-26026 July 1996 Proposed Tech Specs Allowing Repair of Defective SG Tubes by Electrosleeving ML20117F6431996-05-15015 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls ML20101K6011996-03-28028 March 1996 Proposed TS Figure 3.1.1-1 Re Change to Moderator Temp Coefficient 1999-09-01
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20207F0261999-06-0101 June 1999 Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2 ML20204H6011999-01-29029 January 1999 Age Related Degradation Insp (Ardi) Program Technical Requirements Document for Mechanical Systems ML20198A2981998-09-15015 September 1998 Technical Procedure CP-217,rev 7,PCR 98-034, Specifications & Surveillance,Secondary Chemistry ML20198A3131998-09-15015 September 1998 Technical Procedure CP-224,rev 4,PCR 97-049, Monitoring Radioactivity in Systems Normally Uncontaminated ML20198A2911998-02-23023 February 1998 Technical Procedure CP-206,rev 4,PCR 98-034, Specifications & Surveillance Component Cooling/Service Waster System ML20211J2981997-09-18018 September 1997 Pump & Valve IST Program Third Ten-Yr Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20141D9341997-05-0909 May 1997 Radiation Safety Procedure 1-104, Area Posting & Barricading & High Radiation Area Pre-Entry Checklist ML20210P3971996-12-0404 December 1996 Rev 2 to RP-2-101, Administrative Procedure Radwaste Mgt ML20210P3871996-10-17017 October 1996 Rev 2,Change 0 to Offsite Dose Calculation Manual ML20095G7841995-10-12012 October 1995 Change 95-086 to Rev 4 to Technical Procedure CP-217, Specs & Surveillance:Secondary Chemistry ML20095G7621995-09-27027 September 1995 Rev 2 to Administrative Procedure NO-1-106, Functional Evaluation/Operability Determination ML20095G7771995-05-23023 May 1995 Rev 0 to Administrative Procedure RM-1-103, Commitment Mgt ML20095G7661995-02-27027 February 1995 Rev 3 to Administrative Procedure QL-2-100, Issue Reporting & Assessment ML20078A3611995-01-18018 January 1995 Change 5 to Rev 0,to Program Plan for Second Insp Interval for Plant,Units 1 & 2 ML20072T4141994-08-29029 August 1994 Rev 0,Change 1 to Emergency Response Plan Implementation Procedure,Erpip 203.Change Replaces Entire Procedure ML20072T3741994-08-29029 August 1994 Rev 1,Change 3 to Emergency Response Plan Implementation Procedures,Erpip 201.Rev Replaces Pages 3 & 4 & Review/ Approval Page ML20095G7781994-08-19019 August 1994 Rev 0 to Administrative Procedure MN-3-111, Erosion/ Corrosion Monitoring of Secondary Piping ML20064F2221993-09-0101 September 1993 Rev B/Change 1 to Calvert Cliffs Instruction CCI-803, Radioactive Matls Mgt ML20064F2011993-08-26026 August 1993 Rev 1,Change 0 to Odcm ML20095G7551993-08-11011 August 1993 Rev 0 to Administrative Procedure NS-1-300, Industry Operating Experience Info Processing ML17179A8601993-03-12012 March 1993 Rev 1/Change 0 to LCM-11S, Component Level Itlr Screening Procedure for Structures. ML20044C5291993-03-0101 March 1993 Rev 4/Change 0 to LCM-11, Life Cycle Mgt Component Level Itlr Screening Procedure for Sys. ML20056F5701993-02-18018 February 1993 Rev 0 to Change 1 to Odcm ML20118A8241992-09-18018 September 1992 Technical Criteria & Procedures Used for Generation of In- Structure Response Spectra ML20091N3031992-01-0606 January 1992 Rev 10 to Support Procedures - Media Response Procedure ERPIP-B.2, Off-Site Survey Points. Rev Deletes Photographs of off-site Points ML20077R2701991-08-31031 August 1991 Rev 2 to Calvert Cliffs Nuclear Power Plant Fitness-for-Duty Manual ML20058E5571990-10-29029 October 1990 Rev 5 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program ML20059H2871990-09-0707 September 1990 Rev 4 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program ML20044B0421990-07-13013 July 1990 Rev 3 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program. ML20042E8291990-04-30030 April 1990 Rev 2 to Calvert Cliffs Performance Improvement Plan Implementation Program. ML20042G3771990-04-16016 April 1990 Changes 1-3 to Rev 0 to Program Plan for Second Insp Interval for Calvert Cliffs Nuclear Plant,Units 1 & 2. ML19332F3041989-12-0808 December 1989 Rev 3 to Surveillance Test Procedure STP-M-662-2, Integrated Leak Rate Test,Unit 2 Containment. ML20246L7641989-08-14014 August 1989 Corrected Pages for Substitution Into Performance Improvement Plan (PIP) Implementation Program & Table 1.4 Which Sorts PIP Action Plans by Root Cause & Updated Schedule & Resource Summaries ML20247M5741989-07-31031 July 1989 Performance Improvement Plan Implementation Program ML20248H8121989-04-30030 April 1989 Performance Improvement Plan ML20204G5821988-09-26026 September 1988 Rev 1 to ASME Section XI Pump & Valve Test Programs-Units 1 & 2 Second 10-Yr Interval ML20029A7671988-07-27027 July 1988 Rev 1 to Chemistry Procedure CP 607, Offsite Dose Calculation Manual. ML20154J0991988-02-10010 February 1988 Operating Manual;Emergency Operating Procedures ML20148L6431987-11-30030 November 1987 Program Plan for Second Insp Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20239A0561987-02-28028 February 1987 Operating Procedure OP-17-60-016-0, Ultrasonic Thickness Measurement Piping Using Swri Thickness Data Acquisition Sys ML20205P4611986-12-31031 December 1986 Rev 0 to ASME Section XI Pump & Valve Test Programs - Units 1 & 2,Second 10-Yr Interval ML20198H4271986-03-26026 March 1986 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to Erpip 4.1.3, Technical Support Ctr Roster, Rev 9 to Erpip 4.1.4, OSC Roster & Rev 10 to Erpip 4.1.17, Security. W/860522 Release Memo ML20198C5061985-11-0101 November 1985 Supplemental Program Plan for Dcrdr ML20138A3931985-09-20020 September 1985 Rev 9 to Emergency Response Plan Implementation Procedure Erpip 5.0, Preparation & Control of Emergency Response Plan & Implementation Procedures ML20236U2791985-08-0505 August 1985 Rev 3 to Operating Procedure X-FE-101-3, Onsite NDE Records Control ML20090B5881984-05-0202 May 1984 Public Version of Revised Emergency Response Plan Implementation Procedures,Including Rev 10 to Erpip 4.1.17, Rev 9 to Erpip 5.4 & Rev 2 to Erpip A.2 ML20090B6891984-04-18018 April 1984 Public Version of Rev 15 to Emergency Response Plan Implementing Procedure Erpip A.1, Emergency Organization Telephone Numbers ML20087F2591984-03-14014 March 1984 Instruction CCI-310, Emergency Operating Procedure Writers Guide. Emergency Operating Plan Validation/Verification Plan & Training Plan Encl ML20155H2161984-02-20020 February 1984 Remote I/O Equipment Hardware Acceptance Test Procedure for NUS Corp/Bg&E Calvert Cliffs Data Acquisition Sys ML20106H1901984-02-0202 February 1984 Remote I/O Hardware Acceptance Test Procedure for NUS Corp/Bg&E Calvert Cliffs Data Acquisition Sys at Computer Products,Inc 1999-06-01
[Table view] |
Text
. . . . . _ . -. - .. _ - - . .--. . - -
s CALVERT CLIFFS NUCLEAR POWER PLANT TECHNICAL PROCEDURE CP-206 SPECIFICATIONS AND SURVEILLANCE l COMPONENT COOLING / SERVICE WATER SYSTEM i
REVISION 4 l
PCR 97-103 i
Safety Related __ Non-Safety Related V ;
REFERRAL USE - PERIODICALLY REFER TO PROCEDURE DURING USE Approval Authority Effective Date 02 'O 3 --f .
Og- REFERRAL USE W4ysetere procedure during use 9812160219 981210 PDR ADOCK 05000317 P PDR Enclosure 2 l
l
Specifications end Surv illance Component Cooling /Scrvice Water Syst3m CP-206
,' Revision 4 ,
Page 2 of 8 l
RECORD OF REVISIONS AND CHANGES Revision PCR Number Number Summary Of Revision Or Change i t
4 97-103 Procedure reformatted. Changed micro symbol to the word " micro", per Writer's Manual. Attachment 1 P' Squency reduced to 1/W. Changed ,
hydrazine Action Level to <1. AodE; ammonia to the table at a frequency of 1/W. Changed Action Level notification from
- Notify SS" to " Notify SS as i
directed by SPC."
l 4 98-032 Changed the word " micro" to micron where applicable.
a i
f i
f
\
t i
1 l
l
e Specifications cnd Survrillince Component Co$ ling /S:rvice Wat:r Syst:m CP.206 .
RcVision 4 Page 3 of 8 1 t
1 TABLE OF CONTENTS I.0 PURPOSE . _ . . _ . . . ... .. . .. 5 2.0 APPLICABILITY / SCOPE .............5
3.0 REFERENCES
AND DEFINITIONS ........5
A. PROCEDURE
DEVELOPMENT 5
B. PROCEDURE
PERFORMANCE .5 C. DEFINITIONS x -.
.5 4.0 PREREQUISITES - . . .
....6 A. RESPONSIBILITIES-- .6 5.0 PRFCAUTIONS .. . . . . .. . . _ . _ ...... 6 i
6.0 PERFORMANCE. . .. . . . . .. 7 {
A. SURVEILIANCE . . . . . . .7 B. SPECIFICATIONS. 7 l C. GENERIC CORRECTIVE ACTIONS - 7 7.0 POST. PERFORMANCE ACTIVITIES . . ... 7 l
8.0 BASIS . . ... . . . . . . ..... .. 7 9.0 RECORDS . ... . . . . . _ . .. . ... 7 ;
Attaciunent 1, Component Cooling Water System and Service Water Syter".. . . .. .. .. 8 J
u 8
4 I
I r
l
Specifications end Surv:ill nce Compon:nt Cooling /Scrvice Wat r System CP-206 Y Revision 4 Page 4 of 8 LIST OF EFFECTIVE PAGES Page No. Change Nc. Page No Change No. Page No Change No.
1 2
3 4
5 EC-1 6
7 8
i l
l l
a Specifications end Survrillance Compon:nt Cooling /S:rvice Wat:r Syst m CP-206 Revision 4 l 4 Page 5 of 8 1.0 PURPOSE This procedure defines a sampling and analysis program for monitoring the water chemistry of the l
Component Cooling and Service Water Systems.
2.0 APPLICABILITY / SCOPE 1
l This procedure is applicable to the Plant Chemistry Unit.
This sampling and analysis program is applicable to the Component Cooling and Service Water System.
The procedure stipulates the s, .aillance frequencies, specifications, and corrective actions for each chemical parameter monitored. The radiochemical parameter surveillance frequencies, specifications, and corrective actions are provided in CP-224, Monitoring Radioactivity in Systems Normally Uncontaminated.
3.0 REFERENCES
AND DEFINITIONS A. Procedure Development
- 1. CP-102, General Information Records B. Procedure Performance
- 1. CP-102, GeneralInformation Records
- 2. CP-224, Monitoring Radioactivity In Systems Normally Uncontaminated C. Definitions
- 1. Action Level 1:
A value or range of values for a chemical or radiochemical parameter which:
a) is inconsistent with the goals of the Chemistry Section, b) indicates an adverse trend has developed, or c) indicates long-term impacts should be anticipated or expected.
- 2. Dissolved Copper:
The copper remaining in the filtrate after filtering through a 0.45 micron filter.
- 3. Dissolved Iron: EC-1 The iron remaining in the filtrate after filtering through a 0.45 micron filter.
Specifications end Surv:illance Compon:nt Cooling /S:rvice Wat:r Syst:m CP-206 Revision 4 4
Page 6 of 8 3.0. References and Definitions (Continued)
- 4. Target:
The value or range of values for a chemical or radiochemical parameter which is a goal or a predetermined warning limit. A Target is not a specification.
4.0 PREREQUISITES A. Responsibilities
- 1. The Chemistry Technicians are responsible for; a) Sampling, analyzing, and documenting the results of the surveillance.
b) Performing corrective actions as required.
c) Notifying the Supervisor - Plant Chemistry, SPC, of any abnormal chemistry results or equipment conditions.
d) Performing and documenting the initial notifications of ACTION LEVEL 1 conditions.
- 2. The SPC is responsible for; a) Ensuring the surveillance frequencies and corrective actions are performed.
b) Ensuring that the General Supervisor - Chemistry, GSC, is notified of any ACTION LEVEL 1 condition.
c) Ensuring that the Shift Supervisor - Operations, SS, is notified of any ACTION LEVEL 1 condition.
5.0 PRECAUTIONS None
. . - . . . .- _ ~- .-
! Specifications end Survrillance Componsnt Cooling /S:rvice Wat r Syst:m CP-206 R: vision 4 !
- v l
Page 7 of 8 l l
6.0 PERFORMANCE A. Surveillance 1.
SAMPLE the Component Cooling Water System and the Service Water System AND ANALYZE for the parameters at the frequency specified on Attachment 1.
B. Specifications
- 1. COMPARE the surveillance results to the TARGET, and ACTION LEVEL 1 values.
C. Generic Corrective Actions
- 1. VERIFY all results and pertinent information is documented. I
- 2. IF a TARGETis exceeded, THEN:
a) NOTIFY the SPC.
b) DOCUMENT notifications, as directed by the SPC, in the appropriate record. '
c) IMPLEMENT corrective actions as directed by the SPC. i
- 3. IF an ACTION LEVEL 1 is exceeded, THEN:
a) RECORD the date and time the sample was collected as the " ACTION LEVEL 1 TIME OF INITIATION"in the appropriate record.
b) NOTIFY the SPC.
c) NOTIFY the SS, as directed by the SPC.
d) DOCUMENT notifications in the appropriate record.
e) RESAMPLE and ANALYZE the affected parameter as soon as practical, or as directed by the SPC, to verify entry into the ACTION LEVEL 1 condition.
i f) INCREASE surveillance frequency as directed by the SPC.
t g) PERFORM corrective actions as directed by the SPC.
7.0 POST-PERFORMANCE ACTIVITIES '
None 8.0 BASIS l None l
9.0 RECORDS
(
None
).-
t Specifications cnd Surveillanca Compon:nt Cooling /S:rvics Wat:r Syst m CP-206 i
- Rsvision 4 Page 8 of 8 COMPONENT COOLING WATER SYSTEM l
1 l AND SERVICE WATER SYSTEM ATTACHMENT 1 PARAMETER UNITS FREQUENCY TARGET ACTION LEVEL 1 Ammonia ppm 1/W pH @ 25'C (1) 1/W 9.0 - 9.8 < 9.0
> 9.8 Hydrazine ppm 3/W 5-25 <1 Chloride ppb 1/M S 25 Dissolved ppb 1/W 55 Oxygen Dissolved ppb 1/M S 50 Copper Dissolved Iron ppb 1/M 5100 Suspended (2) ppb 1/M S1000 Solids Gamma Activity See CP- See CP-224 See CP-224 See CP-224 224 Tritium Activity See CP- See CP-224 See CP-224 See CP-224 224
- 1. Sample and analyze for dissolved iron and copper if a pH change of > 2 pH units occurs over a 2-day period.
- 2. Suspended solids should be sampled and analyzed at the same time as dissolved iron and copper-