Proposed Tech Specs,Changing Provisions for Receiving, Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant
ML20128H603
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 10/03/1996
From:
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20128H600 List:
References
NUDOCS 9610100006
Download: ML20128H603 (3)


Text

.

ATTACHMENT (1)

UNIT 1 LICENSE MARKED-UP PAGES 9610100006 961003 PDR ADOCK 05000317 P PDR Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant October 3,1996

,.I *

. I sMW woch ,_ e-rel 1. a.n. J

+k Unl1- x llc.ea s e C. n e.d pap ) .  ;

3.

poss suant to the Act and 10 CFR Part 30 to receivV {

and use at any time 100 millicuriesprfh of any bypr ct material without restrictio o chemical or physical , for sample analysis instroient  ;

I calibration; 500 11 curies of bu duct materini in the form of equipmen at is ~ "cactively contaminated by radioiso with atomic numbers within th'Urange 3 to 8 ', for ection and maintenan:e of the lity, as ibed in the licensee's lett application for lice amendment dated Nov 13, 1974, as amended by le dated November ,1974, and Sodium-24, in liquid fo not to e ed 500 millicuries for tracer measurements am turbine acceptar.ce' testing. -

. 4. Puesuan Lto the Act and 10 CFR Parts 40 o receive, pos , se at a O milligrams each of any source o aterial without restricti emical or )hysical form, anal s or instrument cali aration; l 4 /f Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation i of the facility. '

C. This license shall be deemed to contain and is subject to the conditions specified in the following Consnission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40 Sections 50.54 and 50.59 1 of Part 50, and.,Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules,

, regulations, and orders of the Comnission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

1. Maximum Power level The licensee is_ authorized to operate the facility at steady state rdactor core. power levels not in excess of 2700 megawatts (thennal).

i

2. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. , are hereby incorporated in the license. The7fcensee shall operate the facility in accordance with the Technical Specifications.

hjoh. : % n. % Y LLn. + 1 h censt.

8 Amendment No.-3.41-4&r189 M

3. Pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in ts as reau .

Sg. Pursuant to the Act and 10 CFR Parts 30, 40, and 70, T-nsu4 into to receive, possess, and use in amounts as required any byproduct, source or special nuclear material .

Und I li ce.nu without restriction to chemical or physical fonn, for

^ sample analysis or instrument calibration or "b" associated with radioactive apparatus or components; marked- up pa.p3.-

5. Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This amended license shall be deemed to contain and is subject to the conditions specified.in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30 Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulc.tions, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated be. low: ,

1. Maximum Power Level The licensee is authorized to operz.te the facility at steady state reactor core power levels not in excess of 2700 megawatts (thennal).
2. Technical Specifications The Technical Specifications contained in Appendices A and B, as revis'ed through. Amendment No. , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

Nok : b is %e_

LA m + 2. h unu_ .

Amendment No. -9,05,166 l