ML20078B039

From kanterella
Revision as of 04:36, 25 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Approval of Encl Proposed Highway Route for Shipment of Sf from Columbia,Mo to DOE Savannah River Plant in Aiken,Sc to Six Months Beyond Current Expiration Date
ML20078B039
Person / Time
Site: University of Missouri-Columbia
Issue date: 09/28/1994
From: Hultsch R
MISSOURI, UNIV. OF, COLUMBIA, MO
To: Haughney C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 9501250233
Download: ML20078B039 (3)


Text

1' P.

y OCT 04 '94 11:05AN PEACTOP FRONT OFFICE

5o00184,))gotz

~

Research Reactor Centt 3//ol//

cor.rda, uYEIssIN UNIVERSITY OF MISGOURI-COLUMBIA

  • %[]j[2_ 4 FACSIMILE TRANSMISSION R-/o3 QSooole(o DATE: October 4,1994 FAX NUMDEll (301) 415 5360 ATTN: Ms. Gloria Bennington Division ofIndustrial & Medical Nuclear Safety, hWSS U.S. NRC FROM: Roland A. Hultsch Reactor Physicist Research Reactor Facility Unh ersity of Missouri Columbia Columbia,MO 65211 Omco Number: (314)882-5205 FAX Number: (314) 882-6360 Pages: 3 (inclurling cover sheet)

IF YOU HAVE PROBLEMS RECEIVING THIS FAX, PLEASE CALL (314) 882 5201 i i COLUMBIA KANSAS CITY ROLLA ST. LOUIS e .as cowuw **w 9501250233 940928 PDR ADOCK 05000186 P PDR

OCT 04 '94 11:0*Jti REKTOR FRONT OFFICE P.2 f Pesearch Reactor Center II Teep Colebia. Missour: 65211 4 2 UMVERSITY OF MISSOURI COLUMBIA p ,

September 28,1994 Mr. Charles J. Haughney, Chief Storage and Transport Systems Branch Division of Industrial and Medical Nuclear Safety and Safeguards, NMSS Mail Stop T8-F5 II R. Nuclear Regulatory Comrnission Washington, DC 20555

Dear Mr. Haughney:

On January 25,1994, you issued approval of the enclosed highway route for Shipment of spent reactor fuel through Decernber 31,1994. This approvalis required by 10CFR73.37(b)(7).

The University of Missouri Research Reactor (MURR)is tentatively scheduled to begin a series of shipments to the Savannah River Site in early 1995. Will you please arrange to extend the NRC approval of this route to et least six months beyond the current expiration date?

Sincerely, c 04 ,

Roland A. Hultsch Reactor Physicist bb i 1

9 COLUMBIA KANSAS CITY ROLLA ST. LOUIS

.na m nue

, ,, - (CT 04 '94 11:06AM PEACTOR FRCNT OFFICE P.3

. 105

,(_

', . ~ T0i nr. Lusrics J. Haughney Enclosure 1 ,

ROAD TRANSPORTATION ROUTE UNIVERSITY OF MISSOURT, COLUMBIA, MISSOURI

< TO 00E SAVANNAH RIVER PLANT, AIKEN, SOUTH CAROLINA t

MISSOURI

1. MD-163 north to M0-740" 0.5 mile i
2. NO-740 east to M0-63* 2.0 miles
3. M0-63 north to I-70* 2.0 miles
4. I-70 east to I-270 105.0 miles
5. 1-270 south and east to I-255 20.0 miles t 4

(I-255 is a continuation of I-270) 4.0 miles 1-255 east to Illinois state line 6.

Subtotal 133.5 miles i ILLINCIS

7. 1-255 east to I-64 16.0 miles
8. I-64 east to I-57 66.0 miles .
9. I 57 south to I-24 51.0 miles  :
10. I-24 south to the Kentucky 1. tate line 36.0' miles ,

Subtotal 165.0 afles KENTUCKY

11. I-24 southeast to the Tennessee state line 123.0 miles i

Subtotal 123.0 miles TENNt$5tE

12. 1-24 southeast to I-65 45.0 miles  ;
13. I-65 south to I-40 8.0 miles
14. 1-40 east to I-640 157.0 miles 1-640 east to I-40 8.0 miles
15. 77.0 miles
16. 1-40 east to the North Carolina state line 295.0 miles Subtotal NORTH CAROLINA 47.0 miles
17. 1-40 east to I-26 42.0 miles
18. 1-26 southeast to the South Carolir state line Subtotal 55.0 miles i

SOUTH CAROLINA 19' I-26 south to I-20 107.0 miles i 47.0 miles

20. 1-20 southwest to SC-19" 20.0 miles 21 SC-19 south to the Savannah River Plant
  • Subtotal 174.o mile TOTAL 982.5 mi'em

" Access to or exit from interstate system January 1994 4